July 1993Windhoek, NamibiaNational HOUSIng Eknterprise (NHE)
tted by
McNamara Consultants
to
SUM-
Submi
rr
arate
rere
an es
SBCGSE54
- eee ee er ee
areata eet e teal es
+
ry
watts
AASerate eet ate!
eetae,
ae
ween areneweet
aerate eat ate
eeew eee wots
wate atera tate al
A AD
etat ate
eee aetoate at ata
atetetete
ate
ata!
erate
>
era an arate a tate!ete
Te vetteey?
Ot
areneatatetetele
Aeneas eater e
et ates
e S
rate aa!annette
ote tate .
bone ee alee cle
area eiete
2 wet. vaatte* .4
taal et ete
Pree wretanaaraey
at
a
ta
te
4 4 4 4 *
CEP EEE OT TAT eT Tae
acts tn ote CF Bee ee a eeeatta ate DODOatta eat te ate atte er ate tetasapart tate erate neta a teneteater
eee se,
stately5
44 The Honourable Mayor
of Windhoek, Mr. Matheus
Shikongo, was the guest of
honour at the service dedicating
the renaming of the project as
the Oshatotwa Housing
Programme. He addressed a
crowd of over a_ hundred
residents and invited guests in
the shade structure, the core of
the community centre building in
Onghuuo ye Pongo.
vv The Mayor unveils the
sign announcing the new project
name: the Oshatotwa Housing
Programme. "Oshatotwa"is the
Oshiwambo word which means
"A foundation has been laid.
gz
g
-
4
44 Mrs. Maria Dax, NHE's
Public Affairs Manager, chaired
the dedication ceremony of the
Oshatotwa Housing Programme.
The name "Oshatotwa" was
selected in a competition among
the residents of the upgrading
project areas.
vv The invited guests join
the local populacein listening to
the Mayor's speech. The
ceremony was covered by NBC-
TV and by several local
newspapers.
INTRODUCTION
COMPONENTS OF PROGRAMM
Upgrading of resettlement areas
Core-house projects
Loan guarantee fund
Building material loans
Community development and training
Institutional development
NHE's Resource Centre
N
O
P
O
D
B
B
D
D
O
f
h
b
o
T
O
Y
O
m
W
N
F
f
EXECUTING AGENCY AND ORGANIZATION OF PROGRAMME
3.1 Recent developments at NHE
3.2 Organization of the Programme
3.3 Personnel
3.4 Coordination mechanisms
3.5 Logistics
COOPERATION WITH OTHER PARTIES |
Municipality of Windhoek
Cooperation with NGOs
Private sector
Steering CommitteeM
b
W
N
E
tg
A.
A
A.
A.
4.
FINANCE
5.1 State of accounts
5.2 Revision of Programme budget
5.3 Adherence to disbursement schedule,
estimated disbursements for third quarter
CONSULTANT
6.1 Personnel assignment
6.2 Services rendered
6.3 Assignment for next quarter
STATE OF FULFILLMENT OF CONDITIONS
Annexures
Exchange rate (June 93): DM 1.00=Rs.1.90
Ministry of Regional, Local Gvnmt.and Housing.
26
35
37
38
43
46
4/
48
49
49
50
o1
52
52
93
53
55
56
57
61
61
64
65
-i/f/a
-1l/e
-1/d
2/a
-2/D
QUARTERLY PROGRESS REPORT 2 -JUNE/93
Municipal Council's resolution on interim rates
and taxes.
Description of Freedom Land experience
Complementary information on infrastructure
upgrading:
- Standards for infrastructure upgrading
- Work programme
- Road cross section, details on construction
- Water & sewerage layout plans, details
- Press ads inviting contractors for price
competition
Submission to NHE's Management Committee on level
of infrastructure upgrading.
- Proposed level of infrastructure upgrading
in Inception Report
_ Letter from Municipality on financing
materials for sewerage and water lines in
upgrading areas.
- VWL cost estimates for improvement of
infrastructures
Municipal Council's March resolution on sale of
land for core-house projects;
Layout approval
- Letter to Municipality requesting approval
of lay-outs;
- Municipal Council's June resolution
approving lay-out plans for core-house
projects;
Core-house Projects land development
_ Standards and cost estimates
- Preliminary work programme
Core-house Projects: Correspondence related to
value of construction in Khomasdal locations
Contract for Loan Guarantee Fund
2-06/93-CHP.1
This Quarterly Progress Report 2 is submitted by SUM-
Mc Namara Consultants to the National Housing Enterprise,
with copies to the Ministry of Regional and Local
Government and Housing and to KFW in accordance to the
Paragraph 2.2.3 of the Consulting Contract dated July 16th,
1992. It covers the progress accomplished from the ist of
April through the end of June 1993.
The second quarter of implementation was a fruitful
period for the Programme. Most issues that initially
delayed implementation are now solved, although
unfortunately not always according to the assumptions
stated in the Inception Report.
A small but very relevant change is to be highlighted.
In keeping with the participative approach, a competition
to rename the Programme waS organized among people in the
upgrading areas. More than 150 entries were received from
the community, and "OSHATOTWA", an Oshivambo word that
means "a foundation has been laid" was selected by the
communities themselves.
Despite certain delays, Programme Implementation is
progressing well and the main objective, defined as:
"improving access to housing for low-income groups,
applying new approaches and encouraging the participation
of the community, public and private sectors" will he
achieved. The progress in the three Programme components is
outlined below:
UPGRADING: After establishing of the price of plots,
field work is proceeding for securing land tenure and
developing starter solutions. NHE has adopted several
decisions to facilitate access to land and houses. fhe
Municipality has offered cooperation for the improvement of
infrastructures. It was decided to provide full water and
sewerage reticulation for all areas; engineering plans were
prepared and construction is now scheduled to begin in
August.
Data coming from the field have been evaluated and the
budget and operating procedures adjusted accordingly. Field
work is more time consuming than anticipated; it is NHE's
first experience with upgrading, dealing on a large scale
with people already living on the sites. Many new
procedures have been developed to bridge the gap between
the informal life style in the upgrading areas and the
administrative routines of NHE and the Municipality.
CORE-HOUSE PROJECTS: The land for the three initial
core-house projects has been purchased, lay-out plans have
been prepared and approved by the Municipal Council, survey
works and engineering designs are under way. The MRLGH
OSHATOTWA PROGRAL
{ME-QUARTERLY PROGRESS REPORT 2-06/93-CHP.1
decision on 300 m2 as the minimum plot size, municipal
requirements on standards for roads, price escalation and
new taxes on building materials will have an adverse effect
on the affordability of the core-houses.
Additional land for a fourth core-house project was
identified. NHE is purchasing 450 developed plots at
Otjomuise, and will allocate some of them for this purpose.
It was agreed that no land development costs would be
reimbursed from the grant for these plots. NHE's
counterpart contribution to the Programme is increased
accordingly; now a total number of 430 units is envisaged.
LOAN GUARANTEE FUND: The Loan Guarantee Fund was
established, and SWABOU signed the agreement as the first
financial institution that will offer guaranteed loans to
low-income households. A publicity campaign is being
prepared and loans under this programme will be available
soon.
A major output of the quarter has been a substantial
revision of the Programme budget, on the basis of more
ascertained assumptions and the experience so far gained
through implementation. The number of envisaged starter
solutions and building material loans have been decreased;
the number of core-houses increased. NHE's' share in
Financing the Programme has increased from an original
14,68 in the Inception Phase to 21,0%, which shows the
strong commitment of NHE management towards the Oshatotwa
Programme.
From the institutional development point of view the
overall picture is encouraging: NHE has incorporated basic
conceptual innovations of the Programme into its Strategic
Plan and adjusts administrative procedures in a flexible
way. The Municipality has responded positively to some of
the suggested reductions of land development standards and
is ready to co-finance infrastructure improvement of the
upgrading areas.
Two new Community Development Workers and two Self-
Help Construction Advisors were hired. NHE's Office
Administrator joined the team in April. On the other hand,
M Chris teenkamp, NHE's Programme Coordinator hasr
announced that he will soon be leaving the Corporation. A
very efficient coordinator and a valuable resource is thus
jost for the Programme. NHE will scon replace him and
requested the Chief Technical Advisor to extend his stay in
Windhoek for a week to facilitate the transition.
At the end of June the Programme Team conducted a
participative planning workshop to establish activities,
outputs and responsibilities for the next quarter. All team
members positively evaluated the experience and felt that
OSHATOTWA PROGRAMME-QUARTERLY
as a result they had a
Programme.
3-CHP.1
PROGRESS REPORT 2-06/9
better understanding of the
The consultancy services so far seem appropriate and
sufficient to accompany implementation as scheduled.
The following persons have
quarter
Mr.
Mr.
Mr.
Mr.
Mr.
Ms.
Mr.
Mr.
Mr.
Mr.
Mr.
Mr.
Mr.
Mr.
Ms.
Ms.
Ms.
Ms.
Ms.
been involved in the second
of execution. From NHE:
Axaro Tsowaseb,
Alpheus Gaweseb,
Louis Fick,
Jurgen Lehnert,
Adolf Botes,
Maria Dax,
Chris Steenkamp,
Pietrus Asino,
Brian Graig
Ernst Mathias
Johann de Klerk
James Short
Andreas Wienecke,
Jonathan Sam,
Charlotte Dunstan,
Estelle Martin,
Tella Beukes,
Carol Muller,
Ansie Steenkamp,
Chief Executive Officer
Chief Operating Executive
Sr.Mgr.Finance, Plng. & Control
Sr.Mgr.Technical & Social Serv.
Mor. Contracts
Mgr. Public Affairs
Project Coordinator
Office Administrator (Program)
Self-Help Construction Advisor
Self-Help Construction Advisor
Manager, Finance Branch
Loan Administration Officer
Sr. Draughtsman
Media Producer
Confidential Secretary
Office Administrator
Administrative Assistant
secretary
Receptionist
From the consulting team:
Mr.
Mr.
Mr.
Mr.
Mr.
Ms.
Ms.
Ms.
Juan A. Crispo,
Roland Ziss,
Don Kurtz,
Kerry McNamara,
Andrew Walton,
Sophy Shaningwa,
Salmi Kaulinge,
Aune Tjirare
Chief Technical Advisor
Policy/Institutional Advisor
Cty.Development Advisor
Field Supervisor
Field Coordinator
Cty.Development Specialist
Cty.Development Specialist
Cty.Development Specialist
- Information regarding the Programme was to be
disseminated among potential beneficiaries in all five
sectors; definition of land selling price was expected by
mid-April;
Starter solutions
- Adjusted technical designs of alternative solutions;
construction drawings, bills of quantities, cost estimates
and models were to be prepared by mid-April;
- Self-help construction advisors were to be hired and
trained by mid-May;
- Price competitions to select building material
suppliers were to be conducted during April;
- Operational procedures for implementation were to be
established during April; |
- Builders were to be selected and standard contract
prices for construction of the various alternatives
defined, to offer the possibility of hiring a builder to
beneficiaries unable or unwilling to proceed through self-
help;
- A preliminary experience to implement between 6 and 10
starter solutions was to begin in the Onguo Ye Pongo
community in May;
_ After evaluation of this initial experience, a joint
process of regularization of land tenure and development of
starter solutions was scheduled to be gradually extended
from Sector I to IV.
- As requested by the Municipality, a local consulting
engineer's firm was to be appointed to design and
supervise construction of the upgrading of internal streets
and water and sewerage reticulations. The contract was
scheduled to be signed by the end of April; |
Standards for internal streets upgrading and for
utilities networks were programmed to be defined with the
Municipality by the end of April;
- Design and construction drawings for infrastructure
improvements were expected by mid-June, with tender and
construction starting afterwards in Sector I and gradually
extended to other sectors.
PROGRESS REPORT 2-06/93-CHP. 2
Community Centers
Municipal Council's reply to NHE's request for landfor the Community Centers in Sectors IV and V was expected
by the end of March, and the lease Signed immediately
afterwards:
The initial structure for the community center in
sector I was to be completed by mid-April;
- Design, construction drawings, bill of quantities,
cost estimates and tender for the construction of site
office (Community.Ctr. Sector IV) was scheduled to be
completed by the end of May, actual construction to begin
in early June.
Progress of work was based in the Following
assumptions:
a) Land selling prices would be defined by early
April
b) Infrastructure improvement issues pending would be
decided by end of April | |
c) CDWs and SCAs can be hired and trained and are
operative by mid-May.
REALIZATIONS, PROBLEMS ENCOUNTERED
General information regarding the upgrading project
was disseminated among all potential beneficiaries during
the second quarter through leaflets, meetings with
community leaders and groups, the Organization of a
competition to give a name to the project (see 2.5 below)
and other methods.
The programmed "twenty households meetings" approach
waS not completed in all areas. Due to delays in defining
the selling price for the plots it was decided that it
would be more effective to explain the project's details
during the regularization of tenure process.
securinglandtenure
LAND SELLING PRICE: Land selling prices could only be
established in mid-May, after the end of April Municipal
Council's resolution that temporarily waived payment of
interim rates. Details on this lengthy process that delayed
Field work more than a month were provided in the weekly
reports submitted to KfW by SUM-McNamara Consultants and
NHE's Project Coordinator. Copy of Council's decision is
ctachned as Annex Z.1i/a. NHE established selling prices at
RS.6.100/plot in the serviced areas (Freedom Land and
Goreangab), and Rs. 5.650 for all other plots in the
upgrading areas. These prices were later revised when NHE's
Management Committee decided to provide full water and
Sewerage reticulation, levelling them at Rs 6.100 in all
areas (see Infrastructure Upgrading section).
CHANGES IN IMPLEMENTATION STRATEGY: NHE decided to
give priority to providing secure land tenure to as many
relocated households as possible, and introduced some
adjustments into the originally envisaged procedures.
a) The process of signing deeds of sale for plots will
have first priority and be separated from the definition of
individual starter solutions. The initial programme
envisaged this as a single operation. A basic loan will be
granted for the purchase of the plot, an additional loan
for the starter solution will be extended to families
willing and able to afford them.
b) NHE has decided to waive the requirement of a 10%
initial saving on the purchase of the plot proposed in the
Inception Report. Concurrent with the up-front subsidy,
this relaxation of financial conditions is expected to
allow a bigger number of households to become plot owners,
the basic initial stage to develop a housing solution.
c) As mentioned in the Quarterly Progress Report 1,
eventually .25%3 of the households may not be able to afford
even the purchase of the plot. To reduce the number of
potential evictions, a temporary lease arrangement was then
suggested. NHE has now decided to offer such families the
possibility of signing a conditional contract for six
months. Households that, despite their low declared
incomes, manage to regularly meet their monthly obligations
will be able to remain in the plot; otherwise they will be
evicted. This creative approach will allow the mobilization
of hidden informal resources that might be available for
some families but do not appear in their income
declarations.
d) NHE has also decided to relax age requirements.
According to usual policy, 60 years is established as the
age limit to end loan repayment. For the Upgrading Project
loans will be granted regardless of the age of the
beneficiary.
THE LAND SELLING PROCESS: Basic procedures were
established and field personnel trained to use them at the
beginning of June (Details in 2.5 and Operations Manual).
Signature of deeds of sale involve a coordinated effort
between NHE's personnel, the Programme CDWs and Office
Administrator. The CDWs explain the Programme and loan
conditions and re-evaluate household's affordability; this
information is transmitted to NHE's personnel for the
actual signature of deeds of sale and loan contracts. CDWs
WOrkK is performed on site, contract signature is done at
the Municipality's Okuryangava offices, lent to NHE till
the site office is ready for use.
During the month of June the process of selling plots
was started in the Freedom Land area. By evaluating the
experience the Programme Team has been able to adjust
procedures, and estimate better the potential for starter
solutions. Annex 2.1/b contains a detailed description of
the process, implications for field work, training etc. The
following conclusions refer to special cases identified and
suggest policies to deal with them.
THE AREA |
The Freedom Land area has some particular
characteristics:
- It is not a clustered community as the others.
One part of the erven are situated around NHE's WASP
(Windhoek Assisted Self-help Project), the other
erven around the Shipena Eimbeck or Freedom Land
squatters (see plan).
In comparison to all other upgrading areas
Freedom Land has a privileged location, with the
important Monte Christo Road on one side and the main
entrance to Okuryangava on the other.
- The people of Freedom Land were the first ones to
be resettled; a former NHE employee stated that the
group was selected in Single Quarters among
households with relatively higher incomes.
Despite these characteristics Freedom Land looks very
much the same as the other upgrading areas: there is no
clear evidence for an accelerated process of consolidation.
According to the CDWs the community is relatively well
Organized. Many of the findings therefore should then also
be relevant for the other areas.
SPECIAL CASES IDENTIFIED
Only 54 worksheets # 1 out of a total of 85 erven
(64%) could be completed in the first round without special
efforts by the CDWs to meet the people. An array of other
Situations, requiring special attention and additional time
of the Team was identified. They may be grouped into the
following categories:
- Owner who live regularly on the plot, but
* re away because of their job (e.g. taxi driver,
construction worker)
* are on leave in Ovamboland, for a couple of days
* have not been able to produce their incom
statement
* do not know about the possibility of having
access to housing allowances with their employer.
Owners who do no live regularly on the plot. Some
of them go to Ovamboland and come from time to time;
others live in another town because of a temporary
employment and intend to go back once the job is
finished. Usually family members live on the erf and
®
e
e
n
s
5.
W
o
r
R
K
S
H
C
E
T
ft
S
P
E
C
A
L
c
a
g
e
P
L
E
T
E
OSHATOTWA PROGRAMME-QUARTERLY PROGRESS REPORT 2-06/93-CHP.2
Know where the owner is; they do not usually know
when he will come back to Windhoek.
_ One person claiming ownership of several plots: A
few of these cases have been detected; they amount to
intend to deceive NHE for speculative reasons (there
are three different people called Jonas Lucas or
Lucas Jonas in the upgrading areas!).
- Other people living on the plot with consent of
the original owner. The plot was assigned to somebody
who now lives in another place, but maintains his
claim to the erf. The case of erf 1386: Naftali
Amuquia, 23 years of age, is living there with a
woman. His brother Jeremia (26) is the owner; he is
presently employed in Okahandja. As he his the first
born of the family he would never pass over his claim
to Naftali, unless he dies."
Other people living on the plot without consent
of the original owner. People do not know the
Original owner or pretend not to know hin. He might
have sold them the erf, or just abandoned the erf
some time ago.
- Unoccupied structures. Nobody is living currently
on the erf; the structure may be locked or used for
non-residential purposes. The case of erf 1456: The
owner lives in Otjiwarongo. The structure is used as
a bottle store and a tombo place. There is a bed
inside which is used by the night watchman. The lady
from erf 1453 is looking after the business.
Unoccupied plots. sometimes because the
boundaries have not been Clearly defined or people
have difficulties in understanding them (e.g.
"panhandle" erf). Also, plots may not have been
originally allocated due to Steep slopes or other
reasons (in Onheleiwa plots were designed over an old
graveyard site).
WORK IMPLICATIONS
These special cases require a lot more work input by
the CDWs, the Office Administrator and the ProgrammeCoordinator than the normal cases. If one visit to the erf
is usually enough to complete worksheet #1 for a normal
case, three to five visits have to be envisaged for theSpecial cases, plus additional meetings with the community
leaders. It is recommended that an area map is used toidentify these special cases and follow them up. The
Programme Coordinator when assigning the time of the cDWs
has to make provisions for the Special cases.
On the other hand, during the initial phase theattendance of the special cases should not delay the
attendance of the normal cases. It is recommended that in
the coming months the focus should be placed on the mass of
normal cases. This first round should also include the
identification of the range of Special cases and the
corresponding procedures. Once the first round is
AMME-QUARTERLY PROGRESS REPORT 2-06/93-CHP. 2
concluded, the special cases should be dealt with in asecond round. It is expected that by doing these two roundsmany of the owner considered special cases will try to sortout their problem and approach the Team themselves.
PROCEDURAL AND POLICY IMPLICATIONS
Dealing coherently with the special cases means tryingto formalize informal life styles. There are certainlylimits, but some basic policy guidelines have to beestablished to cover the majority of these cases and atleast prevent obvious forms of misuse.
- Establish clear control mechanisms: Names of plotowners shall be cross-checked against all owners inresettlement areas, other NHE projects, the MRLGH BuildTogether and other Housing Programme's beneficiaries lists.= Set a deadline for legalization of Ownership: Adeadline will be established for erf owners to produce thenecessary documentation for the deed of Sale; if he doesnot show up, his erf will be will be repossessed by NHE andreassigned to somebody interested from the Waiting list. Locate the original owner: The Team uses differentmeans Of tracing the original owner, according to what thecommunity leaders think most effective, in order to briefthe original owner (leaving note with occupants orneighbors, radio message, etc.).
- Accept change of ownership: If the Original owner isnot living on the erf, he may pass his claim to ownershipwith a written declaration to the occupant who will becomethe new owner of the erf.
Absentee ownership: NHE does not accept absenteeOwnership; if the owner is not living on the erf and doesnot want to pass ownership over to the occupant, the erfwill be repossessed by NHE and reassigned to somebody who
really needs it.
- Non-residential use of the erf: If the owner lives onthe erf, he may also use it for non-residential purposes;if the erf is only used for non-residential purposes, itwill be repossessed by NHE and reassigned to some familywith real housing needs.
Many of these situations result from the fact thatpeople were resettled from the Single Quarters without
establishing very clearly that they would have to pay forthe land. They were permitted to Stay without any repaymentfor an initial period of six months; in practice they havebeen there for much longer practically for free, and somehave the perception that the land was given to them by the
Government. This perception is already affecting cost
recovery in other areas: the Community Development Workers
reported that in the Onghuwo ye Pongo community, where
contracts for the purchase of plots were Signed last year.
Many households are not willing to start repayment as long
as the other resettled groups are not paying.
- 11 -
RAMME-QUAR
TERLY PROGRESS REPORT 2-06/93-CHP. 2
In the broader context of the National Housing Policy
it is obvious that households may be supported to acquire
only one erf or house. The individual desirability of
having one house in Ovamboland and another one in Windhoek
cannot be met with governmental Support. Permanent formal
employment is no longer a requirement for having access to
a housing solution. This does not mean that people should
have a permanent place to stay wherever they go to look out
for employment opportunities. To consider these Situations,
selection criteria were adjusted Lo include: 1)
Beneficiaries must be bona fide residents of Windhoek,
living and working in the city; ii) The plot must be the
sole residence of household and used mainly for residential
purposes; iii) Any person using the plot exclusively for
commercial activities, or identified as owning other plots
or houses in Windhoek will be excluded from the Programme,
and the erf re allocated by NHE. Procedures established to
deal with the different situations are shown in the charts
in pages 13 to 15.
THE SHIPENA EIMBECK SQUATTER AREA
The issue of land tenure at the Shipena Eimbeck
Squatter area is still unsolved. The Programme Team
monitors conversations between the community and the
Municipality. NHE stands by its policy of assisting the
Squatters in the improvement process without previously
buying the land.
Startersolutions
Preliminary tasks required to begin implementation of
this component were roughly completed by mid-June, a delay
of about one month compared with previous planning. Main
reasons for the delay were:
- Difficulties in identifying and hiring the self-
help construction advisors, the key personnel for
this task. The first one joined the team in early
May, the second in early June.
- Delays in NHE's draughting section. Although NHE
has purchased another CAD station and temporarily
assigned a senior draughtsman to the Oshatotwa
Programme, there is at present an overload of work
and conflicting priorities between the Upgrading and
the Core-house that sometimes result in certain tasks
being postponed. This bottleneck has been brought to
the attention of the Manager of NHE's Technical
Services Dpt., and solutions are under way.
During the second quarter of implementation:
_ Alternative starter solutions designs, bills of
quantities and cost estimates were prepared (see Operations
Manual - OM);
Procedures for the evaluation of "excess"
affordability after payment of loan for plot, for defining
individual solutions with families, for processing the
7
ol
lo
we
d
u
p
fo
r
e
a
c
h
ar
ea
.
T
h
e
p
e
r
c
e
n
t
a
g
e
s
b
e
l
o
w
ar
e
ro
ug
h
es
ti
ma
te
s.
|
AS
:
DI
FF
ER
EN
T
SI
TU
AT
IO
NS
OF
PL
OT
US
E
pr
op
er
w
a
y
of
at
te
nd
an
ce
a
n
d
a
sp
ec
ia
l
se
t
of
a
c
t
i
o
n
s
.
o
o
o
0
8
e
e
e
e
t
b
e
e
e
e
s
t
6
+
0
6
4
e
9
8
8
e
e
e
'e,
er
ae
e
e
e
e
wee
2
ae
o
r
a
t
e
tet
at
e'
a
a
a
n
n
a
t
a
et
e
sa
te
ta
re
nee
a
ater
at
et
et
ar
ev
er
er
e
l
e
d
s
Ma
te
te
te
te
tata
e
t
e
r
s
at
at
et
er
at
et
et
at
eT
or
er
ec
ar
er
en
ee
ns
ts
,0
.8
et
e
e
et
et
e
tg
te
t
3
0
8
a
t
a
r
i
ot
te
r
e
ne
50
-
7
0
%
S
S
e
e
T
T
e
r
e
c
e
m
a
t
e
e
n
T
e
e
l
e
ate
tet
ata
tar
ev
er
an
tat
ata
tel
ere
rer
ece
rer
ere
str
ere
cen
s
aTa
tst
eta
tat
ete
sat
ata
tar
ete
tat
ata
tat
eta
ret
ata
rar
ara
te
d
e
e
r
e
e,
Ta
te
oe
se
te
ne
ce
re
te
a
t
t
a
?
:
a
ir
ete
ter
eta
tat
ate
ti
st
at
e
*
.
at
e
OE
S
o
e
oe
e
n
a
e
a
e
n
a
ta
ta
te
te
ta
ta
te
e
e
e
e
r
a
t
H
a
e
)
Ae
tn
a
8
tr
an
s
b
e
r
e
e
t
b
l
e
e
e
t
tL
et
at
at
at
a
t
t
a
tae
ta
te
t
ate
a
e
r
e
s
Re
et
e
er
a
th
re
n
o
r
e
ore
er
e
el
er
se
e
y
me
t
ar
b
al
e
Lee
ee
,
ea
t
ac
eta
te
te
ta
te
rer
er
an
n
at
e
a
r
e
n
a
s
at
e
w
e
r
e
la
ta
e
at
ar
ee
h
ae
he
h
Ae
te
Ge
t
we
s
ol
we
a
a
e
e
y
oe
er
ee
ae
t
r
a
t
e
ta
ta
te
ta
ta
te
ta
ta
ta
te
ta
re
te
re
te
re
re
ce
sr
at
a
a
t
e
n
a
t
a
n
t
bi
at
er
st
ar
ar
on
t t
r
e
"e
tn
a
et
et
et
a
ee
er
e
tn
s
a
a
e
te
na
rn
re
:
at
er
et
at
at
e
at
a
te
ta
ta
ot
e
et
e
a
r
e
n
e
e
w
e
n
e
a
t
t
e
st
el
e
ot
at
et
a
e
s
a
e
n
e
e
t
a
g
et
y
en
e
cate
s
5
0
7
.
7
8
3
on
E
h
a
t
a
te
et
et
e
v
a
t
e
be
te
s
a
a
ee
e
a
e
t
n
a
E
E
e
e
e
a
Wee
at
e
t
b
er
at
et
e
Te
e
e
e
e
te
a
P
C
R
T
I
P
a
a
r
ra
e
Ne
Ne
H
O
ON
E
A
I
N
I
OK
I
R
A
e
t
e
al
e
at
at
et
at
e
at
e
te
ar
en
e
b
a
ere
re
ar
a
et
e
ae
ra
p
e
r
m
er
r
h
s
b
.
O
C
Hl
e
R
e
e
e
n
a
t
e
ta
ne
l
r
o
t
a
t
e
te
ta
ta
at
e
ra
te
te
t
eta
e
et
t
e
here
ar
e
a
ar
en
a
ar
en
a
ar
at
e
ar
ee
br
s
O
L
be
h
e
S
a
w
h
e
we
e
w
e
t
a
t
,
e
e
e
a
t
e
t
e
ete
t
r
e
e
et
e
st
e
at
e
at
er
e
Te
or
k
s
a
r
e
er
er
ae
es
G
b
so
os
8
n
y
s
e
e
l
e
n
m
e
le
,
t
a
t
e
r
ate
a
e
r
a
r
e
e
at
a
e
te
e
r
e
a
r
e
w
l
o
h
e
cn
le
ly
a
r
a
t
e
et
a
st
e
a
t
e
s
at
e
a
et
e
ee
er
e
pr
ar
at
en
s
e
me
e
s
e
e
e
t
#
8
1
9
.
2
a
i
g
Se
s
t
a
g
e
=
r
e
!
ar
at
e
«
o
n
.
e
l
e
v
e
n
s
e
t
w
e
S
A
S
S
O
O
O
O
C
O
ar
e
e
e
nt
el
et
a
te
e
e
e
e
s
re
re
re
re
:
A
at
e
e
e
e
ge
er
es
hy
T
h
e
e
a
t
e
s
tg
!
n
e
e
a
r
t
a
ar
en
a
at
er
er
e
se
ar
el
er
e
ee
e
®,
S
O
O
a
t
t
a
ta
te
e
a
ee
t
et
er
at
e
an
a
a
et
er
ea
t
e
an
a
et
e
ar
e
5
en
a
ta
te
te
te
ta
te
t
st
at
e
te
ta
ta
te
ta
ra
ta
ta
te
te
re
te
ee
ls
er
eta
t
ar
at
e
al
ee
are
tel
n
et
er
s
at
e
er
e
er
ar
ec
t
al
ea
le
ee
.
a
l
o
t
be
et
s
o
t
a
ot
e.
r
a
t
e
o
t
e
S S eters! alate taors:etatacaleatealgetetatatate teaseetyeeedag tetwet
aka 88 ee eae a tet, SOC5 cot a8, aF, teats
o
EE
oe
TS
.
.
at
e
.
oe
or
et
e
Wea
tar
e
vo"
4
we
To
to
ro
at
te
W
A
ot
et
e
ai
a
A
ane
.
«
an
at
a
a
a
al
e
h
e
e
a
ee
et
ee
e
sO
8
bet
er
e
B
rO
le
re
o
4
er
ty
#4
al
e
oi
e
0
3
8
5H
eee
e
a
a
ta
ta
ta
ta
te
t
eta
a
er
e
g
er
e
er
e
mr
e
be
h
ar
e
wa
te
aed
Or
e
6
8
He
rk
en
ee
r
El
an
a
Oe
al
an
a,
ar
et
ha
st
at
e
t
a
at
at
at
at
at
gg
ar
ete
tar
ar
e
at
e
se
ta
ta
tn
an
el
se
te
et
en
e
eS
er
at
e
en
e
al
se
t
bo
de
are
at
te
n
at
e
at
a
at
e
ta
te
av
at
al
a
re
ne
:
«
a
e
e
e
ir
at
en
ie
tn
ie
ne
rs
en
et
ee
et
e
cla
tat
ata
tat
ate
tet
etn
tat
sta
tat
ate
lst
ere
ter
sta
tar
ers
vat
ate
a
a
a
an
et
te
.
et
at
at
at
at
at
at
at
et
ct
at
et
at
at
at
et
a
a
a
et
et
e
er
at
e
e
a
at
a
ie
s
a
s
t
e
r
n
at
e
en
e
te
et
er
e
ne
ta
at
s
or
at
e
es
m
e
w
a
n
e
ee
.
at
at
at
at
at
et
at
et
ut
et
er
eT
er
er
es
ta
re
rs
te
re
rs
eu
te
ls
te
ra
za
re
re
te
c
se
al
er
s
so
e
4
1
8
t
y
a
a
t
a
a
ta
gi
g
a
a
n
e
8
e
e
e
W
e
o
a
le
#
6
8
8
6
6
8
8
4
6
6
8
a
na
ne
ee
e
a
o
w
e
e
a
et
en
e
al
at
e
a
e
e
a
et
e
s
a
t
a
ta
te
a
re
re
el
el
or
er
es
®
a
e
t
n
a
n
e
e
a
a
n
e
a
a
a
a
e
ao
at
e
eta
ain
eta
n
a
a
eee
an
an
e
at
e
et
al
aa
t
a
a
t
e
s
ai
e
Er
f
h
a
s
b
e
e
n
as
si
gn
ed
la
st
y
e
a
r
to
S
i
n
g
l
e
Q
u
a
r
t
e
r
sq
ua
tt
er
.
P
e
o
p
l
e
ar
e
re
gi
st
er
ed
.
O
r
i
g
i
n
a
l
o
w
n
e
r
d
o
e
s
n
o
t
S
o
m
e
e
r
v
e
n
h
a
v
e
iv
e
o
n
t
h
e
e
r
f
a
n
y
m
o
r
e
.
s
t
r
u
c
t
u
r
e
s
th
at
a
r
e
S
o
m
e
b
o
d
y
el
se
i
s
li
vi
ng
lo
ck
ed
.
O
w
n
e
r
s
li
ve
t
h
e
r
e
w
i
t
h
h
i
s
s
o
m
e
w
h
e
r
e
e
l
s
e
a
n
d
M
o
s
t
o
f
t
h
e
m
ar
e
h
e
a
d
s
ho
us
eh
ol
d.
P
e
o
p
l
e
ar
e
m
a
y
co
me
f
r
o
m
ti
me
t
o
of
h
o
u
s
e
h
o
l
d
.
R
e
q
u
i
r
e
d
ac
ti
on
:
S
i
g
n
De
ed
o
f
Sa
le
no
t
re
gi
st
er
ed
.
ti
me
.
R
e
q
u
i
r
e
d
ac
ti
on
:
R
e
q
u
i
r
e
d
ac
ti
on
:
Le
ga
li
se
te
nu
re
a
n
d
s
i
g
n
If
o
w
n
e
r
d
o
e
s
no
t
u
s
e
De
ed
o
f
Sa
le
.
er
f,
r
e
p
o
s
s
e
s
s
a
n
c
re
al
lo
ca
te
it
.
OSHATOTWA PROGRA}
{ME-QUAF
TERLY PROGRESS REPORT 2-06/93-CHP. 2
concluded, the special cases should be dealt with in a
second round. It is expected that by doing these two rounds
many of the owner considered special cases will try to sort
out their problem and approach the Team themselves.
PROCEDURAL AND POLICY IMPLICATIONS
Dealing coherently with the special cases means trying
to formalize informal life styles. There are certainly
limits, but some basic policy guidelines have to be
established to cover the majority of these cases and at
least prevent obvious forms of misuse.
_ Establish clear control mechanisms: Names of plot
owners shall be cross-checked against all owners in
resettlement areas, other NHE projects, the MRLGH Build
Together and other Housing Programme's beneficiaries lists.
- set a deadline for legalization of ownership: A
deadline will be established for erf owners to produce the
necessary documentation for the deed of Sale; if he does
not show up, his erf will be will be repossessed by NHE and
reassigned to somebody interested from the Waiting list.
- Locate the original owner: The Team uses different
means of tracing the original owner, according to what the
community leaders think most effective, in order to brief
the original owner (leaving note with occupants or
neighbors, radio message, etc.).
- Accept change of ownership: If the Original owner is
not living on the erf, he may pass his claim to ownership
with a written declaration to the occupant who will become
the new owner of the erf.
- Absentee ownership: NHE does not accept absentee
ownership; if the owner is not living on the erf and does
not want to pass ownership over to the occupant, the erf
will be repossessed by NHE and reassigned to somebody who
really needs it.
- Non-residential use of the erf: If the owner lives on
the erf, he may also use it for non-residential purposes;
if the erf is only used for non-residential purposes, it
will be repossessed by NHE and reassigned to some family
with real housing needs.
Many of these situations result from the fact that
people were resettled from the Single Quarters without
establishing very clearly that they would have to pay for
the land. They were permitted to stay without any repayment
for an initial period of six months: in practice they have
been there for much longer practically for free, and some
have the perception that the land was given to them by the
Government. This perception is already affecting cost
recovery in other areas: the Community Development Workers
reported that in the Onghuwo ye Pongo community, where
contracts for the purchase of plots were signed last year.
Many households are not willing to start repayment as long
as the other resettled groups are not paying.
- 11 -
Pes
ta
S
o
t
o
a
e
R
O
S
h
e
l
A
F
F
O
R
D
A
B
I
L
I
T
Y
A
S
S
E
S
S
M
E
N
T
&
S
I
G
N
I
N
G
D
E
E
D
O
F
S
A
L
E
|
Y
O
P
E
N
I
N
G
O
F
S
A
V
I
N
G
S
A
C
C
O
U
N
T
Y
Y
CA
N
AF
FO
RD
ER
F
&
40g
}
CA
N
AF
FO
RD
ER
F
ST
AR
TE
R
SO
LU
TI
ON
"
D
E
C
L
A
R
A
T
I
O
N
U
N
D
E
R
S
T
A
R
D
I
N
G
C
A
N
N
O
T
A
F
F
O
R
D
E
R
F
:
C
O
N
D
I
T
I
O
N
A
L
S
A
L
E
M
O
N
I
T
O
R
I
N
G
O
F
R
E
P
A
Y
M
E
N
T
S
&
S
I
G
N
I
N
G
C
O
N
T
R
A
C
T
Y
Y
H
A
S
I
M
P
R
O
V
E
D
N
o
e
A
L
E
X
C
E
S
S
I
V
E
D
E
F
I
N
I
T
I
O
N
O
F
S
S
A
F
F
O
R
D
-
A
R
R
E
A
R
S
A
B
I
L
I
T
Y
P
A
Y
M
E
N
T
'
R
E
Q
U
I
R
E
M
E
N
T
A
C
H
I
E
V
E
D
I
N
T
E
R
M
E
D
I
A
T
E
E
V
A
L
U
A
T
I
O
N
F
I
N
A
L
E
v
eL
U
10
%
SA
VI
NG
S
:
.
SG Es a Gl Ge os aa
pan
to
a
N
O
R
M
A
L
E
N
F
O
R
C
E
-
M
E
N
T
:
1
S
T
A
M
E
N
D
M
E
N
T
T
O
D
E
E
D
EV
IC
TI
ON
OF
SA
LE
(L
OA
N
FO
RS
S
)
AC
UE
RS
IM
PR
OV
ED
IM
ME
DI
AT
E
E
V
I
C
T
I
O
N
A
F
T
E
R
Y
1
L
E
VT
E
R
2
N
D
A
M
E
N
D
M
E
N
T
R
E
P
O
S
S
E
S
S
I
O
N
(
B
U
I
L
D
I
N
G
M
A
T
E
R
I
A
L
L
O
A
N
)
R
E
A
L
L
O
C
A
T
I
O
N
sh SS SS D
R
E
P
O
S
S
E
S
S
I
O
N
R
E
A
L
L
O
C
A
T
I
O
N
O
T
O
W
N
E
R
O
C
C
U
P
I
E
D
re
ae
a
=
=
9
aa
=
y)na
O
ae
E
S
T
O
L
E
G
A
L
I
Z
E
P
E
D
U
R
arate atte naa ate ae aayn aaa a eae onesHane ata ata a anata a a aeata ate tote.
orate ar ate
aioeate
cepa erere
*
vee tent eeYeta ste a ais ate ae
aaa a arate.tana etyana aaa
ataetet
arate tat!
O
O
D
C
O
O
D
O
O
U
at
al
et
et
et
er
al
s
o
a
t
et
e
on
an
e
r
ee
,
ot
te
ta
te
te
t
et
a
te
te
t
st
e,
e
r
e
n
t
e
e
e
ee
t
et
e
te
ar
a
r
e
t
e
Somes
BBOener ote!
ae at ete ateeot atta tate:
eee
er
ie
e
t
c
h
?
or
at
e
t
an
e:
3
FOCUSSEDTRA
C
I
N
G
C
A
M
P
A
I
G
N
T
O
ID
EN
TI
FY
OR
IG
IN
AL
O
W
N
E
R
W
I
T
H
D
E
A
D
L
I
N
E
ORIGIN
AL
O
W
N
E
R
D
O
E
S
N
O
T
S
H
O
W
UP
Lu
?
Y)
Lu
wn
n
O
Oo.
Lu
oC
Y
==
O
l
a.
ORIG
IN
AL
O
W
N
E
R
S
H
O
W
S
UP
LI
CA
NT
F
R
O
M
GE
VI
TY
!
=
O
RI
GI
NA
L
O
W
N
E
R
S
H
I
F
T
S
CL
AI
M
T
O
ORIGIN
AL
O
W
N
E
R
S
I
G
N
S
D
E
E
D
O
F
S
A
L
E
O
C
C
U
P
A
N
T
D
E
E
D
O
F
SA
L
N
E
W
O
W
N
E
R
O
C
C
U
P
A
N
T
N
E
W
O
W
N
E
R
SI
GN
S
D
E
E
D
O
F
S
A
L
E
PROGRESS REPORT 2-06/93-CHP. 2
additional loan application, for organizing and monitoring
construction were developed (see OM).
_ A price competition among building-materials suppliers
was organized by the Programme Coordinator, prices
evaluated by the SCAs, and decisions made on which Supplier
would provide which materials. Basic procedures for
requesting, delivering on site and paying for materials
were established and agreed with the suppliers.
- NHE invited builders that could be interested in the
work to submit prices for construction of the different
solutions. Although only three applied initially, it was
possible to establish a cost for families wanting builders
assistance. Within this cost range, the families will have
the opportunity of appointing a builder of their choice or
selecting one from the NHE list of builders. CRIAA trained
builders will be offered the participation in the Project
in this fashion.
- The question of how to distribute water costs between
builders and non-builders was discussed with the
communities. As construction starts, water consumption by
some families will increase significantly, a potential
source of conflict as water is obtained from communal taps ©
and paid by all community members in equal shares. The
communities suggested to reserve some of the existing water
taps for construction purposes; water bills for these taps
Will be paid by households using water for construction
(see also 2.5)
_ In many places survey pegs were missing; NHE personnel
and the SCAs have spent time relocating them as plot
boundaries need to be clearly identified in order to place
the new construction;
The pilot experience proposed for Onguwo Ye Pongo
could not be developed as it was found that most households
that purchased the land last year were in arrears with
their loan repayments. Regular repayment of loans already
granted would be a strict requirement to extend a new loan
for the starter solution. The first starter solutions are
now being defined in the Freedom Land area, it is expected
that construction can start by early August.
The process of implementing the starter solutions will
follow the selling of the plots. At the time of re-
assessing affordability, the CDWs will identify households
that can also afford a starter solution and pass the
information to the SCAs who will be the promotors of this
process. The chart in page 17 summarizes the procedures.
Reassessment of potentia Or starter solution:
The information on household income collected in
Freedom Land is analyzed below. When provisions for the
most vulnerable group are made (those who have a monthly
income below R 415), this data may be extrapolated to
encompass all households in the upgrading project,
~ 16 -
CDW PREPARESLIST OF PEOPLE WITH EXCESS AFFORDABILITY BY AREA
¥ o
SCA STARTS PREPARING WORKSHEET#2 IN OFFICE, IDENTIFIES
AFFORDABLE OPTIONS AND GETS SITE PLAN
SGA MAKES APPOINTMENTS WITH PEOPLEONLIST FOR INDIVIDUAL
MEETINGS
v
SCA HAS INDIVIDUAL MEETING(S) WITH HEAD OF HOUSEHOLDIN ORDER
TO:
@ EXPLAIN PROGRAMME
® MENTION OTHER OPTIONS
® COMPLETE WORKSHEET#2 IF HH INTERESTED
® GET CONTRACT SIGNED BY HH- INCL 10% SAVINGS COMMITMENT
Y
FIN. DEP. MONITORS SAVINGS AND GIVES ORDER TO PROCEED AS SOON
AS REQUIREMENTACHIEVED
¥
SCA PREPARES SKETCH OF EXISTING STRUCTURES, OBSTACLES ON ERF
AND ENVISAGED STARTER SOLUTION, AGREED BY CLIENT
y
IF BUILDER IS NEEDED, SCA IDENTIFIES/APPROVESHIM. SCA PREPARES
WORK SCHEDULE
Yy
PROGRAMME COORDINATOR ISSUES LOAN VOUCHER
v
SUPPLIER DELIVERS MATERIALS TO SITE
7
CLIENT STARTS BUILDING, WITH CLIENT STARTS PAYING
SETTING OUT SUPERVISED BY INCREASED INSTALMENT
SCA
¥
SCASUPERVISES
CONSTRUCTION: ACCORDING MONITORING OF REPAYMENTS
TO SCHEDULE?
YES: SCA NO: SCA
APPROVES WORK PREPARES NEW
PROGRESSAND SCHEDULE
NEXTVOUCHER
7
SCAAPPROVES COMPLETION
OF STARTER SOLUTION
TOOLSFOR FACILITATINGWORKOFSCA:-
ARTERLY PROGRESS REPORT 2-06/93-CHP. 2
permicting a more accurate estimate of repayment capacities
and potential demand in number and cost of starter
solutions.
HOUSEHOLD INCOME IN FREEDOM LAND
The following table represents the income distribution
of the 54 cases in Freedom Land whose worksheets # 1 were
completed in the first round, expressed in fractions of 1
PHSL (= R 830):
Monthly house- No. of
hold income cases %
R 0 - 415 7 13,0
416 - 498 2 3,7
499 - 581 7 13,0
582 - 664 8 14,8
665 - 747 7 13,0
748 - 830 7 13,0
831 - 913 4 7,4
914 - 996 - -
997 - 1.079 3 5,6
1.080 - 1.162 5 9,3
1.163 - 1.245 2 3,7
1.246 - 1.328 1 1,9
1.329 - 1.411 - -
1.412 - 1.494 - -
1.495 - 1.577 1 1,9
1.578 - 1.660
Total 54 100,3
The smallest monthly income was R 250, the biggest Rs
1.500; the median income was Rs 700, the average Rs 738
which shows a slight upward bias. 70 % of the households
have a monthly income up to 1 PHSL, 30 % between 1 and 2
PHSL.
These incomes are higher than the ones analyzed in
Annexure 2.1/c of Quarterly Progress Report 1 on the basis
of the information given in the application forms last
year. One reason may be that Freedom Land residents are a
little better off than the households of the other
upgrading areas. It is also likely that the covered group
has consolidated more in one year than many of the above
mentioned special cases. The recent income data of Freedom
Land confirm the analysis included in Annexure 3/A of the
Inception Report.
- 18 -
REPORT 2
POTENTIAL NUMBER OF STARTER SOLUTIONS
"Excess payment capacity is defined as the amount of
household income available for repaying a starter solutions
loan after deducting the monthly payment obligations for
the erf loan and municipal charges.
The following table analyzes the estimated payment
capacity and prospects for starter solutions on the basis
of information collected in Freedom Land. It is based in
the following assumptions:
_ A basic erf cost of R 80 per month (repayment of NHE
loan plus municipal charges), independently of individual
subsidy amounts;
- No more than 20 % of HH income is spent on housing;
- 50 % of those with payment capacity will apply for a
NHE loan to finance a starter solution;
- A maximum loan amount of Rs 16000 for starter
solutions.
Av. loan Inc. Est. Total
Monthly HH Excesspayment amount dis. no. loan
income R Range Avrg. (Rx1000) % appl. Amount
O- 415 0 0 0 20 0 0
416- 498 3 - 20 12 791 6 30 23.730
499- 581 20 - 36 28 1.845 10 50 92.250
582- 664 36 - 53 45 2.965 13 65 192.725
665- 747 593 - 69 61 4.020 12 60 241.200
748- 830 69 - 86 718 5.140 11 55 282.700
(1 PHSL) errrrrrrrrrrrrrrrrerrrrrr
831- 913 86 - 103 95 6.260 9 45 281.700
914- 996 103 - 119 111 7.315 6 30 219.450
997-1079 119 - 136 128 8.435 4 20 168.700
1080-1162 136 - 152 144 9.489 2 10 94.890
1163-1245 152 - 169 161 10.610 1 5 53.050
1246-1328 169 - 186 178 11.730 1 5 58.650
1329-1411 186 - 202 194 12.784 1 5 63.920
1412-1494 202 - 219 211 13.904 1 5 69.520
1495-1577 219 - 235 227 14.959 1 5 74.795
1578-1660 235 - 252 244 16.000 + 1 5 80.000
~(2 PHSL)--------------------------------------------------
Over 1660 300 16.000 + 1 5 80.000
Total 100 400 2077280
The analysis suggests the need to revise both the
number of starter solutions and the average loan amount to
be taken into consideration in the budget revision. The
estimated number of starter solutions should be reduced
from 600 to 400, the average loan amount should be
increased from R 3.000 to R 5.000. Accordingly, the total
amount in the corresponding budget item should be
increased from Rs 1.800.000 to Rs 2.000.000.
- 19 -
ARTERLY PROGRESS REPORT 2-06/93-CHP. 2
At the end of April VWL Namibia Inc. Consulting
Engineers was appointed by NHE to deal with infrastructure
upgrading in Sectors I, II and III. (Except Shipena Eimbeck
sectors IV and V are already serviced areas). NHE
instructed VWL to develop the engineering design
considering future tarring of roads and full water and
sewerage reticulation. Also at the end of April the
Municipality formally confirmed to NHE that roads in
Okuryangava need not be tarred.
VWL submitted a preliminary work programme aiming at
completing the technical work and starting construction in
Sector I in early September, gradually extending
engineering design and construction to other sectors.
However, by simplifying the tender procedures nearly a
month could be saved: there is a limited number of
contractors in Windhoek handling the kind of work involved
in infrastructure development; with KfW's approval NHE
decided to assign the job through a price competition at
which all potential contractors will be invited.
Invitation to potential contractors began at the end
of June; price quotations are expected by July 28 and works
are now programmed to begin in early August. Installation
of lights in internal streets is being coordinated with the
City Electrical Engineer and will proceed once the roads
are built. Annex 2.1/c gives details of the proposed
designs for roads, water and sewerage networks and other
relevant information regarding infrastructure upgrading.
WATER AND SEWERAGE
The Programme envisaged the extension of communal
services: additional stand pipes and communal toilets,
requiring additional water and sewerage lines. In early
June, in response to a request by the Programme Team, the
Municipality informed NHE that it has decided to cooperate
in the upgrading of infrastructures by financing the costs
of materials for the water and sewerage reticulation. This
cooperation opened the possibility of achieving full water
and sewerage reticulation instead of partial upgrading.
The matter was thoroughly discussed within the Project
Team. As the resolution of this issue was deemed to have
consequences for other NHE programmes, it was submitted to
NHE Management Committee for final decision. After
evaluating the pros and cons a paper recommending full
reticulation was prepared and presented to the Management
Committee (Copy attached as Annex 2.1/d). NHE's management
decided to implement full reticulation. As all erven will
now have a similar level of services, NHE established the
same selling price for all (Rs. 6.100).
- 20 -
Besides the contribution from the Municipality
estimated at Rs 363.000, this option will require
additional Rs.579.000, to be financed from KfW funds
through budget adjustments.
STANDARDS FOR INTERNAL STREETS
The road work will entail earth works to form the road
reserve to suit the cross section of a future upgraded
surface, and a 10 cmt. thick gravel wearing course.
Communitycenters
The shade structure for the Community Center in Sector
I was erected and completed by mid-April as scheduled. A
formal opening was held on the i3th of May, attended by the
Major of Windhoek, representatives from the German Embassy,
NHE, project personnel and over 200 community members. It
combined the announcement of the change in name from WLIHP
to "Oshatotwa Programme" that resulted from the name
competition (see 2.5).
An area committee has been elected to manage the use
of the structure, that up to now is used for meetings once
or twice a week. However, the use at night or in cold
winter days is limited; after evaluating the first two
months of operation the Programme Team has decided to
upgrade the structure by adding a closed room, toilet,
water and electricity.
NHE's application to lease land for a Community Center
in Plot No.1739 in Okuryangawa was finally approved by the
Municipal Council in its end of May meeting. There are
several formalities to comply before the lease may actually
be formalized (publications, Government approval etc), that
could delay several months the beginning of construction.
The Municipality has agreed to permit NHE to. start
construction at risk", after NHE submitted a letter
assuming responsibility for dismantling the structures in
the (unlikely) case of the Government not approving the
proposed use of the plot.
The originally selected location for the Greenwell
Matongo Community Center was not accepted, an alternative
Site was identified and formal application submitted to the
Municipality. Council's decision is expected at the end of
July meeting.
B. NOrK Programme ana targets Or next gquarte
Operational targets for the third quarter were
established by the Project Team through a participatory
planning workshop. Conclusions are summarized in_ the
following tables:
2i -
OSHATOTWA PROGRAMME-QUARTERLY PROGRESS REPORT 2-06/93-CHP. 2
UPGRADING PROGRAMME SALE OF ERVEN
ACTIVITIES OUTCOME ASSUMPTIONS RESPONSIBLE
Re-assess By end of August 60% of the erven CDWs
affordability Workksheet 1 comoltd are owner-occupied
for approx.600 HH
occupying erfs
Inform clients about 600 contracts Every one offered Inform: PA
contracts, sign them signed by Sept.10 an erf will sign Prep: NHE
issue cards tne contract Sign: J.Short
Hand over cards to 600 cards delivrd. CDWs
clients by end of Sept.
Monitor repayments Monthly reports pro- PC + NHE Loan
duced & evaluated on
repyt.on contracts
administration
Follow-up arrears,
particularly of
conditional group
Computer identifica-
tion of conditional sa-
les; lst.report on
team
Computer and
report: PC
Site visits:
arrears by end of Sept. CDWs
Field visit to those
in arrears
Identify unoccupy ied. Procedure established Procedures:
erven by July 7 to identify PC ,RZ,JAC
and deal with U.E.
List of U.E. for all
areas by end of July
List: PA + CDWs
Select & inform poten-Criteria to select
tial new ownsers new benefic. defined
by end of July
100 new potential
owners informed by
end of September
Define criteria
PC , JAC
Inform
potential
candidates:
CDWs
Sale of unoccupied 100 contracts signed At least 100 people CDWs,NHE Team,
and repossesed by end of October on waiting list PA, J.Short
erven respond positively
Foilow-up Snipena- 3 meetings with Muni- PC , JAC , AW
minbeck land regula- cipality, reassessmt.
rization situation report by end Sept.
PC: Project Coordinator, Wilfred Schulte
PA: Office Administrator, Pietrus Asino
CDWs: Comm.Dev.Workers: A.Tjirare, S.Shaningwa
SCAs: Self-help Constr.Adv., B Greig,E Mathias
DS:NHE Drawing Section
22
JAC: J.Crispo
RZ: Roland Ziss
DK: Don Kurtz
KMN: K.McNamara
AW: A. Walton
UPGRADING PROGRAMME STARTER SOLUTIONS
OSHATOTWA PROGRAMME-QUARTERLY PROGRESS REPORT 2-06/93-CHP.2
ACTIVITIES OUTCOME ASSUMPTIONS RESPONSIBLE
Identify potential Lists of potential CDWs
clients per clients are handed
area over to SCAs by end
of August
Contact client 200 potential clients A third of clients SCAs
contacted by mid-Sept. who purchased erven
can afford Str.Sol.
Define solutions 90 solutions defined SHCAs dedicate SCAs
for interested by end of Sept. most of their time
clients
to def. of Str.Sol.
Sign contracts 50 contracts signed PA + Team
by mid-October SCAS
Monitor savings 25 clients informed 50% of Str.Sol. PC
Inform when savings that their savings clients have SCAsS
completed requirements are
fulfilled by end Oct.
Savings completed
Locate starter solut.
On site; issue
voucher; supervise
and advise
construction
20 Str.Sol.on constr.
by end of October; 10
comp1eted
Third SCA hired
by Sept. list.
Not many clients
change mind after
signing contracts
Locate :SCAs+AW
Vouchers:PC
Superv: SCAs+AW
Prepare site plans
Submit to Mplty.
20 site plans submi-
tted by end of Oct.
NHE-DS
PC
Review progress,
revise programme
Performance evaluation
report by end of Sept.
Project Team
PC;AW
Develop new options
including wet core
Plans and cost
estimates
Prepare guidelines
for individual
connections
Booklet to distribute
ready end of Sept.
AW
NHE-DS
PC-AW-JAC
23
UPGRADING PROGRAMME
OSHATOTWA PROGRAMME-QUARTERLY PROGRESS REPORT 2-06/93-CHP. 2
INFRASTRUCTURE DEVELOPMENT
ACTIVITIES OUTCOME ASSUMPTIONS RESPONSIBLE
Clarify system for Procedures agreed with PC
reimbursement of Mpty. included in
materiais with tender documents if
Municipality necessary
Brief consultants Written confirmation PC, AW
on level of services, Complete by 12/07
agree on tender condit.
in particular
relations with Mplty.
Check and approve Complete by 15/07 PC, NHE-DS,
tender documents for
Area l
SUM-McNamara
Evaluate offers
Sign contract
At least 3 offers
received
Contract signed by
July 30
VWL-NHETS
Sign: J.Lehnert
Eval:
Inform commun.in Community meeting on/ At least 50% of CDWs ,PA
Area 1 that work will around July 28; cty. agrees with PC-brief
start; get sites explain cost full reticulation
cleared if required implication
Inform KfW on tender Fax 15/07 enquiring if AW, PC
procedures and tender docs. must be
result sent-Fax 30/07 on re-
sults (monthly report)
Monitor constr., Monthly reports on NHE-DS
approve payments progress & expenditure
Contract for Area 1
completed by end of Oct
SUM-McNamara
End Aug/mid Sept: Contract for next AW, PC
evaluate with VWL if area signed by end
more convenient new of September
tender or contract
extension
Coordinate with Work programme for AW
Municipality
street light constr.
installation of street
lights agreed end of
August
24
OSHATOTWA PROGRAMME-QUARTERLY PROGRESS REPORT 2-06/93-CHP. 2
COMMUNITY CENTERS
ACTIVITIES OUTCOME ASSUMPTIONS RESPONSIBLE
Complete construction PC+AW
drawings,tender, super-
vise construction
Extend Cty.Center 1 Works completed PC+AW
(Onguo Yepongo) ; by end of August
supply services
Build Cty.Center 2 Oshatotwa fiela teams PC+AW
(next to Mp1l.Offices move base of operation
in Okuryangava) to Center by end of
October
Sign lease for Cty. Completion by end of PC+AW
Ctr. in Greenwell October
Matongo; build and
service
PC: Project Coordinator, W. Schulte
AW: Andrew Walton, Field Coordinator
25
Z.2 CORE-HOUSE PROJECTS
A Evaluation of progress
TARGETS FOR QUARTER
Land acquisition
Approval of Municipal Council for selling the three
block plots identified for the Project was expected by end
of March.
Identification of the location and purchase of land to
develop a fourth core-house project was scheduled to
proceed during the second quarter.
approval or land subdivision plans
Final decision by MRLGH on the minimum plot size to be
used for the Project was expected by mid-April;
Approval of layout plans by Municipal Council was
expected by end of April; NAMPAB's approval for need and
desirability during May, Township Board and MRLGH's
official approval by the end of June.
Municipal decision on cooperation in development costs
expected by mid April;
An engineering consultant was to be selected and
appointed by mid-April; engineering plans and tender
documents scheduled to be prepared by the end of May
A land surveyor was to be selected and appointed
during May; preliminary survey work for the three sites
completed by early July;
Tenders for construction and contract award were to be
completed by end of June, and construction work for basic
earthworks and water and sewerage reticulation to start in
July.
select; e Piciari
The selection process was scheduled to begin in mid-
April and completed by the end of June; with beneficiaries
opening accounts at NHE and starting Saving the required
10% of their loans.
Preparation of preliminary alternative core-house
designs was scheduled during April, and municipal approval
obtained by end of May.
Adjustment of designs to individual needs of potential
beneficiaries was scheduled to begin in June, and site
plans submitted for Municipal approval afterwards.
REALIZATIONS, PROBLEMS ENCOUNTERED
In its meeting of March 31, 1993, the Municipal
Council approved the sale of the three plots that NHE
- 26 -
RAMME-QUARTERLY PROGRESS REPORT 2-06/93-CHP.
applied for the development of the core-house Project (see
Annex 2.2/a). Costs of land according to the Municipal
Council's resolution of 033193 are as follows:
Erf No. Area/m2 Unit Cost Rs/m2 Total cost Rs
41 Ok. 25.794 11,37 293.277,78
1373/74Kh. 25.692 18,71 480.697,32
1430 Kh. 39.627 18,71 741.421,17
TOTALS 91.113 (average) 16,63 1.515.396,10
In the first quarterly report it was assumed that
"selling prices for land to be purchased by NHE for the
project will remain within the amounts estimated during the
Inception Phase". The average cost per m2 of block land was
then estimated at Rs 15, giving a total cost of Rs.
1.366.695 for the 91.113 m2 in the 3 locations. There is an
increase of Rs. 148.701 oor 10,8% over preliminary
estimates. Although the price may be considered within the
estimated amounts, this increase will obviously add to the
selling price of the core-houses.
Potential locations to develop a fourth core-house
Project were discussed with municipal planners, that
Signaled three possibilities. The Project Coordinator and
the consultants inspected and evaluated the sites:
- GOREANGAB: It was discarded by the Team as it
presents problems to connect to the sewerage
treatment plant and is considered too far away.
- ROCKY CREST: An important piece of well-located,
block, undeveloped land will be transferred to the
MRLGH for housing programmes. The MRLGH intends to
incorporate private and public actors in a long-term
phased development, in a unique opportunity for
inter-institutional cooperation. NHE could probably
reach an agreement with the MRLGH to obtain land in
Rocky Crest for the fourth core-house project. The
main inconvenience seems to be the timing with regard
to the Oshatotwa Programme implementation schedule.
Coordination between MRLGH and other parties,
planning and development works required will most
probably demand more than one year before house
construction could start.
- OTJOMUISE: Both the municipal planners and NHE
suggested the possibility of using some of the
already developed land at Otjomuise for the fourth
core-house project. NHE has applied to the
Municipality for the purchase of some 450 plots for
future housing programmes in Otjomuise. Several
reasons, discussed below, led the Project Team to
select Otjomuise as best option available to continue
developing the core-house Project.
- 27 -
During the Inception Phase, the Otjomuise location was
not considered suitable for low-income housing, among other
reasons due to its distance to existing services and job
opportunities. The possibility of attracting higher income
households to Otjomuise was suggested in SUM's Technical
Proposal as a way to speed-up the development of services,
attain an improved urban environment and obtain a better
social mix.
At present NHE is preparing a tender for the
development of 103 middle-income houses, with prices
ranging from Rs 40 to 70.000, in some of the 193 Otjomuise
plots purchased last year. Further NHE housing programmes
will certainly be envisaged in the short term, and a
private developer already intends to build there another 60
middle-income houses. An urban environment is being
developed into which the core-house beneficiaries will it
Find easier to integrate.
The plots are fully developed, so no time will be
required for approval of lay-out plans and core-house
construction may start as soon as the land is available and
the site plan is prepared. NHE is prepared to supply the
plots assuming all the costs of land and land development
(that will be recovered directly from the beneficiaries).
In the fourth core-house project, KfW's grant money will be
used only for construction of houses and related costs; an
increased number of solutions will then result.
This question has been delayed for one month with
regard to last quarter's planning. NHE's request to be
authorized to develop land with 200 and 250 m2 plots was
negatively answered by the MRLGH in mid-April; a minimum
size of 300 m2 is to be used for the Oshatotwa Programme.
Besides other, more far-reaching adverse consequences, this
resulted in the need to withdraw plans already presented to
the Municipality for approval starting the whole process
again.
Revised layout plans were submitted at on April 26.
They were approved by the Municipal Council at its meeting
of June 30, 1993 (see Annex 2.2/b). The approval conditions
are different for the Okuryangava and Khomasdal locations.
- For erf 41 in OkKuryangava the Council accepts
gravel roads and assumes the costs of electrical
reticulation;
- For the Khomasdal locations the Council requires
tarred roads (thus increasing development costs), and
does not offer cooperation for electrical
reticulation. Discussions with the City Engineer Dpt.
to lower standards for internal streets are still
ongoing.
- 28 -
Nei"LN.=eoeTeeoaaraa. OeeefeTefigweattaCceets«he.Oehe0Slea,
FaeaONMEEE,TeTEEaetae::
-|| 900-teees
ONNOKSIARYONSNIMVEd
OOO|sx]me= vette
4)Sous| BAeee
BeareainaTid@f
S¥SaYGAYLNQY]
6271444
Sl.1GTWOSYAOHY:ae
Off]2G0:
poeAisaSedSe
JStedYILNISRISNOKTVYNOILYN8é7|4u4
4ubsJICFZIS4¥aFOVUGAY
.udsO701¢ N3AM3TVHINGCISTY
DSOF1SXTVMNVIMLSS03¢dYOdNIAYS\\
ubs¢7
=
GASO7TFNod2G©
UbSOSCTFMELYRMYOLS/S*0'¢
UBS9679FA¥9STNCYOY
UsO79BCIZIS4GTWILL OOL<NSAWSTYLLNGCISdy40oN HOTMAAfSSINFSNOD 372)otekSy) col=ooc/(8°¢=0796¢)
TEYSLI
NAWTVLINSQISSY29ONTYLOL
us0796=F7IS4ya
TOOHOSAXYA!Yd
Sir)4G
gis
ERF SIZE : 25 764sqn
ROAD RESERVE
=
-:_-5 450 san
ERF FOR ELEC. SUB : 92 san
RESIDENTIAL ERVEN : 20 344 sgn
AVERAGE ERF SIZE : 323 san
|
NATIONAL HOUSING ENTERPRISE
6
"Waren Or)tathebeleee
Krecanstalt
'& Wederautbou
SUM WeNemera Consuttants
OSHATOTWA
HOUSING PROJECT
prnmeamcnemnemromrereer
PROPOSED SUBDIVISION OF
ERF 41 OKURYANGAVA PROPER.
jiraammeter
ares
LAYOUT AND AREAS
DIVISION ; TECHNICAL SERVICES=e
" 111000
Rae
ae
#3
gH
a
e
DRAWING NO. REVISION NO.
56931 007 | -
~
2 |xe -
=
ERF SIZES :
1373 15 419 sqm
1374 =10 273 san
ROAD RESE=.= 4 $909 son
1 Cee Le
' o =
EXISTING WUN. Scacn ERVEN 2: 362 sm
AVERAGE ERE SIZE 318 son
oy s@a
ne
ed
TOTAL No C= 2&5. ERVEN 66
T
e
a
10
m
St
re
ey
| |
M
e
e
s
a
y
C
s
T
e
NATIONAL HOUSING ENTERPRISE
7 Cxsranbs feed,Eme © POdur 20192, Fadest
Tobploaa Tiss ©Fehel)
far Fisderaufbeu
SUM MeNemera Consuttonts
OSHATOTWA
HOUSING PROGRAMME
PROPOSED SUBDNISION OF ERVEN
1573 & 1374
KHOWASDAL EXT. 15
are
LAYOUT AND AREAS
SAE =
gg asste
er = 141000
= cortnammonnsem arttinesete, errmcnntaere sone a
The Project Team has managed to speed-up NAMPAB's
approval for need and desirability, the lay-outs are
already submitted for consideration of the Township Board
and approval is expected by the end of July.
Messrs. C. de Wet, Baard & van Niekerk were appointed
by NHE as land surveyors for the Programme. Their initial
schedule envisaged to plot all roads center-lines on the
three sites, in order to allow the consulting engineers to
survey road. levels for the design of roads, sewerage and
water lines. Survey and pegging of plot boundaries is now
scheduled to be performed after basic roadworks are
completed, tentatively in November.
NHE requested CVs from 8 consulting engineer firms in
Windhoek in order to select one for the design works
required for the core-house Project. Lund Consulting
Engineers were selected and appointed in June. They have
prepared a work plan that envisages survey and design work
during July and August, tender in September and
construction beginning in early October. Efforts to re-
schedule the work programme in order to start construction
by mid-September are under way in order to complete the
works before the builder's holiday which start in mid-
December. (Preliminary work programme attached as Annex
2.2/c; construction time estimated at three months).
select; 5 Ficiar;
This process has not yet started. It was not feasible
to establish accurate cost estimates, as some issues like
the size of the plots, municipal development standards etc.
were not solved. The project team then decided to suspend
this activity till the time that total cost, a basic
information to provide to potential candidates, was on
hand.
Preliminary core-house designs were prepared in the
first quarter. However, delays in the approval of lay-out
plans and in the selection of beneficiaries hampered this
task. Adjustment of solutions to individual needs and
presentation of site plans will now pass to the next
quarter.
Zoning regulations for Khomasdal impose the condition
that structures should have a minimum value of four times
the cost of the developed plots. This condition is in total
contradiction with and could have wrecked the core-house
concept for these locations. The Programme Team applied for
relaxation of this condition, obtaining a favorable answer
(related correspondence attached as Annex 2.2/d).
29 -
IE~QUARTERLY PROGRESS REPORT 2-06/93-CHP. 2
Revision of the core-house
The budget for this component was revised in the lightof developments during the second quarter. Several issuesWith direct incidence in costs, number and affordability ofSolutions are now better known:
* The minimum size of plots that theaccept for the Project will be 300 m2 ;
* Actual purchase cost of block land increasednearly 11% over initial estimates;
* The Municipality has informed NHE that they willnot provide materials or participate in defrayingwater or sewerage development costs for the core-house project;
* The Municipal Council's decision impose thecondition that roads need some Kind of tarring in theKhomasdal developments;
* Escalation in building material costs may beestimated at 7% since the Inception Phase. [Inaddition, an increase in taxes will bring GST fromthe present 11% to over 132 from the beginning ofseptember.
BASIC ASSUMPTIONS OF INCEPTION REPORT BUDGETi) The total amount of the KfW's grant to Namibia isfixed; any increase in costs would mean a reductionin the number of solutions financed by Kfw;ii) NHE would assume the costs of purchasing theland, KfW's funds would be used for the developmentof land, the construction of the core-houses and ofthe community centers.
1ii)As per the Signed agreement, GST costs would befinanced by NHE.
iv) Through the 102 deposit, beneficiaries wouldparticipate in financing the cost of the programme.
ORIGINAL PROJECT BUDGET
SOURCE OF FINANCING
Component Nr Unt.cost Total KIw NHE Benef.
Land purchase 400 3,7 1480 0 1332 148Land devipt. 400 2,8 1120 953 55 112CorHs.constr. 400 11,5 4600 3912 228 460Commty.centrs. 2 150,0 300 265 15 20
TOTALS 7500 5130 1630 740Notes:Rs x 1000, rounded
With an exchange rate of 1DM=R 1,8, KfW's contribution was equivalent to DM 2.850.000. Average unit
cost was Rs.18.000.
- 30 -
Budget estimates were prepared on the basis of 400
housing solutions on 200 m2 plots. Gross land requirement
per plot was estimated to be 245 m2, for a total need of
98.000 m2. An average municipal selling price of Rs.15/m2
for block Tand was assumed, bringing the total cost for at
Rs. 1.470.000, a figure that was rounded for budget
purposes in Rs. 1.480.000. Direct land development costs
were estimated at Rs.2.800 per plot assuming 200 m2/plot
and that the Municipality will accept lower service
standards. Cost of core-house construction was estimated at
Rs 11.500/unit.
REVISED COST ESTIMATE FOR THE THREE ONGOING PROJECTS
A total of 229 plots of at least 300 m2 will be
developed in the Okuryangava and Khomasdal locations. Land
development costs are adjusted to the required development
standards on the basis of estimates provided by the
consulting engineer. Core-house construction costs have
been escalated till June by 10%, to Rs.12.650 each; total
cost of this component 229 x Rs.12.650=Rs 2.896.850
Land and development cost in the ongoing core-house
projects _hae
ERF Land Developt| Total Nr.of Avg.cost/
Nr. Costs CostsCost plots plot
41 Ok 293, 349 =" 542 63 8,6
1373/74 Kh. 481 = 364° 845 66 12,8
1430 Kh. 741 558 5°" 1,299 100 13,0
TOTALS 1.515. 1.271. 2.686 229 11,7
(Rs x 1000, rounded)
ast
Adjusted bud«et for first three core-house projects
SOURCE OF FINANCING
Component Nr Unt.cost Total KIW NHE Benef.
Land purchase 229 6,6 1515 0 1364 151
Land devipt. 229 5,6 1271 1081 63 127
CorHs.constr. 229 12,6 2897 2466 143 288
Cty.centrs. 2 150,0 300 265 15 20
TOTALS 5983 3812 1585 586
Notes:Rs x 1000, rounded
Multiplications may not be exact as unit costs are rounded
With an exchange rate of 1DM=R 1,9, KfW's contribution will be roughly equivalent to DM 2.000.000.
(Average unit cost has increased to Rs 24.800).
OSHATOTWA PROGRAMME-QUA RTERLY PROGRESS REPORT 2-06/93-CHP. 2
REVISED CORE-HOUSE PROJECT BUDGET
The following considerations are included in the
budget revision:
a) NHE feels that the core-house is an adequate
approach to affordable housing and would like to
develop as many as possible;
b) NHE will supply developed plots in Otjomuise, at
an estimated cost of R 9.000 each;
c) It is assumed that by the time of construction
core-house price will have escalated another 7%,
bringing the unit cost at Rs 13.500;
d) The amount for building material loans appear to
be over-estimated. A reduction in this budget post
would permit the transfer of some additional funds to
the core-house Project.
A fourth core-house Project of 201 units is proposed
at the Otjomuise site. The budget for this development
would be:
SOURCE OF FINANCING
Component Nr Unt.cost Total Kfw NHE Benef.
Lnd.purch/dvt. 201 9,0 1809 om 1629 180
CorHs.constr. 201 13,5 2713 2308 134 271
Cty.centrs. 1 150,0 150 132 8 10
TOTALS 4672 2440 1771 461
Notes:Rs x 1000, rounded. AVerage cost of solution is Rs 23.200.
Be
Operational targets for the third quarter were
established by the Project Team through a participatory
planning workshop. Conclusions are summarized in the
following tables: |
- 32? -
CORE-HOUSE PROGRAMME-
OSHATOTWA PROGRAMME-QUARTERLY REPORT N.2-06/93-CHP. 2
LAND DEVELOPMENT FOR THREE INITIAL SITES
ACTIVITIES OUTCOME ASSUMPTIONS RESPONSIBLE
Follow-up Township Plans approved by PC-AW
Board approval end of July
Discussions with Agreement on design PC-AW
City Electr.Eng.on criteria and execution
design electr.lines of works
Decision on phasing Memo by end July PC-AW
of works K. Lund;
Monitor completion of Report to NHE, KfW PC-AW
eng.design/tender doc.
Approve tender docum. Report to NHE, KfW PC-AW
call for tender end of August
Evaluate tender, Mid-September PC-AW
Sign contracts Lund;Lehnert
Monitor construction, Construction period: PC-AW
approve payments mid-Sept/mid-Dec.
Coordinate survey of Start: mid-Nov. PC-AW
land, pegging of plots
SELECTION OF BENEFICIARIES
Develop system that Documents with PC-AW-JAC
combines need for guidelines by 16/07 KMCN
individual choice and
phasing of construct.
Identify and contact Project's list PC-PA
potential beneficiar. by 9/07
Conduct information 8 meetings with 200 PC-CDWs
meetings, preliminary participants each,
selection from mid to end August
Complete core-house Final designs, bills PC-AW
designs and cost of Qty, options,
estimates finance, by mid Sept
Submit designs for End Sept PC-AW
municipal approval
Monitor savings Monthly report PC-NHE Fin.Dep
Final selection,
Signature of contrcts.
First batch defined
by end of October
50 benef .complete
Savings by end Oct.
PA
J.Short
33
OSHATOTWA PROGRAMME-QUARTERLY REPORT N.2-06/93-CHP.2
CORE-HOUSE PROGRAMME- CONSTRUCTION OF CORE-HOUSES
ACTIVITIES OUTCOME ASSUMPTIONS RESPONSIBLE
Prepare site-plans Mid-November PC-NHE DS
for submission to
Municipal ity
Complete technical Mid-November PC-NHE DS
drawings
Tender documents
Tender for constr. Mid-Nov PC-NHE DS
Sign contract Mid-Dec
Monitor construction Jan-April 94 PC-NHE DS
approve paymts. SUM-MCN Cons.
FOURTH LOCATION
Select Otjomuise plotsMemo Municipal Council PC-AW
to be used for Plan indicating plots approves sale of NHE Management
project allocated-Mid August land to NHE
Review municipal Mid-Sept AW-NHE DS
layout, adjust if
required
PC: Project Coordinator, Wilfred Schulte JAC: Juan Crispo
PA: Office Administrator, Pietrus Asino RZ: Roland Ziss
CDWs: Cty.Devit.Wrkrs:A.Tjirare, S.Shaningwa DK: Don Kurtz
SCAs: Self-help constr.advisors, BG,EM AW: Andrew Walton
DS:NHE Drawing Section NHE-TS: Technical services
34
TARGETS FOR QUARTER
Work programme for the second quarter aimed at:
- Reaching agreement among participating institutions
on rules and procedures;
- Having the LGF operational at the latest by the
beginning of July 1993
The schedule was based in the following assumptions:
- The interest in the scheme manifested by the
Financial institutions persist and at least some of
them will eventually join the LGF;
- Comments and proposals received may be incorporated
into an agreed final set of rules without distorting
the original intention.
REALIZATIONS, PROBLEMS ENCOUNTERED
With minor delays, the objectives for the quarter have
been achieved, and the LGF is ready to begin operation. On
the basis of a draft prepared during the first quarter, a
Final agreement on the rules of operation was evolved
incorporating comments received from interested financial
institutions. (Attached as Annex 2.3/a)
a) Participants: Of the Financial Institutions invited to
join the LGF, only the two Building Societies, SWABOU and
NAMIB have confirmed their interest. The Banks have opted
for waiting and see how it works, some of them might join
at a later stage.
b) NHE's Subsidiary: Further legal advise requested by
NHE informed that there was no need to create a separate
entity to run the LGF. It will now be run directly by NHE,
keeping LGF's accounts separate.
Cc) Deposit of funds: Although theoretically the LGF could
be deposited in any financial institution in Windhoek, it
was decided to place them with one of the participating
Building Societies, provided they offer normal market
interest rates.
a) Transfer of funds: In order to speed up procedures and
make better use of funds already in Windhoek, KfW has
agreed to substitute the procedure originally envisaged
(direct disbursement from KEW to a local financial
institution), and create the Fund by transferring money
from the Programme's Disposition Fund at the Commercial
Bank. According to the Inception Report, an amount in rands
equivalent to DM 1.000.000 from KfW's grant was to be
deposited for this purpose. To calculate the amount in
rands it was decided to use the same rate of exchange being
used to actualize the Programme's budget (1 DM=1,9 Rs).
S REPORT 2-06/93-CHP.2
The first agreement to participate in the Loan
Guarantee Fund was signed at the end of June with SWABOU.
NHE 1S opening a separate account in SWABOU to keep the
money in trust as established, fixed investment for 12
months at an interest rate of 14,4% per annum, with the
provision that interest earned shall be capitalized into
the Fund.
Information campaign: SWABOU will request its
advertising agency to develop a publicity campaign to
"sell" this new product, expected to start implementing it
by the end of July. It will concentrate on Press ads,
pamphlets and radio communication. It was agreed to include
NHE's name in the ads as the guarantor of the Fund, and to
mention the support from the German Government and KEW,
subject to approval before the campaign starts.
Market for guaranteed loans: SWABOU's perception is
that there is a market for guaranteed loans, although
difficult to assess as no previous experience exists. They
believe however that from now till the end of the year some
60-80 loans may be granted. Their main reserve is with
regard to the required 10% initial savings, a percentage
that they feel might be too high. They have however agreed
to test the system in the established conditions, and
evaluate it after a few months of operation.
Marketing strategy: Loans will be granted either for
construction of new houses or for the purchase or
improvement of existing ones. The marketing campaign will
have two levels. General communication will be targeted to
the market sector that might be interested in such kind of
loans. On the other hand, SWABOU is going to inform
developers who may use this instrument to finance houses
for clients without enough security.
By securing finance for the end users, SWABOU expect
to motivate the developers to produce and offer housing
solutions within the range of loans available (up to
Rs.42.000). In fact, there is already a development company
that is offering core-house type of solutions, although not
yet in Windhoek. This is exactly the kind of market
reaction envisaged in the Inception Report: creating an
effective demand will result in the private sector
responding with adequate offers to it.
SWABOU believes that most of the loan takers will
apply for the maximum amount of Rs 42.000; smaller loans
could not require the guarantee presently covered with the
LGF. The budget revision takes this hypothesis into
account, reducing the number of estimated loans. and
increasing the amount of each loan.
- 36 -
Operational targets for the third quarter are
Summarized in the following table.
ACTIVITIES OUTCOME ASSUMPTIONS RESPONSIBLE
Monitor? SWABOU's NHE and KfW are PC
publicity campaign adequately mentioned Louis Fick
Promote other NAMIB 8lg.Soc. signs They maintain PC
Financial instit. contract by end of expressed interest Louis Fick
to join LGF July
Monitor LGF Report by end of Sept. Louis Fick
operation
2.4 BUILDING MATERIAL LOANS
With the upgrading and core house components now
better defined, is possible to review the building material
loans component. It will benefit both owners of core houses
and of erven in the upgrading areas to a different degree:
In the core house projects they will be offered to
complement the initial cores from the earliest possible
moment on. The beneficiaries may select from a limited
range of 3/5 contractor-built core houses, which they can
extend even before they move in, depending on their payment
capacity and priorities. They also can take the loan when
they are already living in the new core house or at a later
stage.
- The building material loans are introduced into the
upgrading areas to complement a starter solution or even
substitute it when a client does not find the option he
wants and is ready to pay back the loan earlier. The
starter solutions will usually include a standard package
of materials, whereas building material loans allow for
more flexibility of use (like for municipal connections,
electrical installation etc).
The potential number of building material loans
depends on two factors:
- the savings and payment capacity of the individual
household, and
- the variety of options available.
If all households could afford a 100 percent "tailor
made" starter solution or core-house, there would be no
need for a building material loan as each housing solution
3-CHP.2
would fit perfectly to individual preferences and financial
possibilities. This is not possible in the Oshatotwa
Programme because of the unstable economic and social
Situation of most households; through small, short-term
building material loans they may reduce the risk of not
being able to pay back bigger, long-term loans and getting
evicted.
The original project name and acronym, the Windhoek
Low-Income Housing Programme (WLIHP), while appropriately
descriptive of the programme, were difficult to pronounce
and were not being used as "handles" by the community in
their discussions. After some internal team efforts during
the first quarter to come up with a name in Oshiwambo, the
Programme Team decided to invite the people of the
upgrading areas to participate in the name selection
process.
The name selection process was explained in all the
areas of the upgrading project, and suggestion forms were
widely distributed. To be considered, the suggestion had
to come from someone living on one of the erven in the
upgrading area. 150 suggestions were submitted, and a
committee composed of the leaders of the nine communities
and the CDWs selected "Oshatotwa," which means, "A
Foundation has been laid."
The Mayor of Windhoek, The Honorable Matheus Shikongo,
was the guest of honor and main speaker at a special
ceremony held on 13 May to dedicate the name of the
programme officially as "The Oshatotwa Housing Programme."
The ceremony took place at the project's new community
centre facility in Onghuwo ye Pongo. Local political
leaders, government officials, a representative of the
German Embassy, and NGO representatives attended as invited
guests. Over one hundred community members also attended.
Prizes of four plastic chairs were given to the two people
who submitted the name suggestion of "Oshatotwa."
A new brochure, "Oshatotwa Housing Programme - The
Upgrading Project," was printed and distributed to coincide
with the dedication of the new programme name .
The first information video has diminished in value as
changes in requirements and processes have evolved (removal
of the 10% deposit requirement on the purchase of plots,
- 38 -
Community Development Worker, Ms. Sophy Shaningwa, discusses the process of
securing tenure in Freedom Land, one of the upgrading areas, with Martin Lukas, one of
the heads of household resettled from the Katatura Single Quarters. The team found the
late afternoon and evening hours as the most effective time to meet with the residents
wishing to buy their erven and to build on tt.
\\
a
Mrs. Aune Tyjirare, a Community Development Worker, and Jeremia Gideon,
another Freedom Land resident use the back of the project vehicle as an office to discuss
the details of his erfpurchase. The launching ofthe campaignto sell the erven to as many
residents as possible was met by enthusiastic response and cooperation in the community.
Mr. Jochen Kenneweg, of the German Embassy in Windhoek, was an invited guest at the
Oshatotwa dedication ceremony, and responded to the speeches of the Mayor and other
local leaders, saying he was impressed with the spirit of the people. He encouraged them
to continue their good work and cooperation with the project and its goal ofproviding them
with better living conditions.
Communities continue to grow in the Nandolo - Onyeka area. Both communalandprivate
facilities are seen in this view. The small building with double red doors is a communal
toilet; an adjacent communal watertap is to the left of the toilet, in the center of the photo.
The black plastic enclosures, such as the onein the leftforeground, are private bath areas
which are found on many of the individual erven.
T 2-06 /9
changes in qualifications and application of affordability
requirements, etc.) and is no longer in use. A concept
paper was prepared to produce a second video explaining the
responsibilities involved in home ownership in urban
society. The former NASBOUKOR used to provide all
purchasers with a booklet on home ownership in English,
that NHE is now revising to be more positive and promotive
in tone. The second video will be coordinated with the
information in the booklet to ensure that they are
reinforcing one another and do not present situations in
different lights.
Maria Dax, NHE's Public Affairs Manager, 1s again
serving as the liaison with video producers. Several
producers are being requested to prepare a script and cost
estimates based on the concept paper and the NHE booklet.
The Project Team will then review the proposals, add any
emergent issues and recommend which producer to follow up
with.
The management of the communal water taps, and the
paying of the bills on a communal basis, has been a chronic
problem early in this project. By the end of May most
communities had their water bills under control, with
community committees collecting payments from residents on
a pro-rated basis according to the bill for the tap to
which they were assigned, and promptly paying the
municipality. Some communities agreed to occasionally pay
the committee for this work out of the extra funds raised
by round the household bill up (say, from R 2Z.75 per
household, to R 3.00 per household); other committees
decided to pay themselves in this fashion, and set off loud
protests from their communities. While two communities were
still experiencing problems with arrears, most communities
now want individual water taps and sewage connections.
In some very animated group meetings in mid June held
in the Women's Centre, which were attended by four
committee and community members from each community, OHP
staff, municipal water officials, Directorate of Community
Development staff, and the two Regional Councillors, issues
of understanding and fairness of municipal water billing
processes and the demand for individual water connections
surfaced as major concerns. Explanations of the billing
systems and rationale for communal services were presented,
and specific problems were invited to be discussed later on
with the Community Development Team.
In preparation for those meetings, the CDWs found that
water usage in all the areas has gone down over the months,
indicating more controlled use of the water. This of course
resulted in lowering monthly municipal water bills.
- 39 -
UARTERLY PROGRESS REPORT
2-06/93-CHP. 2
All communities decided to continue use of the
committee-administered water fees collection system. The
issue of use of large volumes of water during housing
construction was resolved along the lines of the system
developed in Onheleiwa: specific water taps were designated
for use by those people constructing houses, and everyone
else was assigned to the other taps; the monthly bills were
to be allocated according to who was using the specific
taps during the month. Thus those using a greater volume
of water for construction purposes would pay according to
the amount of water used by all those building in that
month.
The Operations Manual continued to evolve, all the
information in the first edition was reviewed, edited and
revised during this quarter. A copy of the OM is circulated
with this Report as a separate document. Sections on
processes and procedures for negotiation with residents, on
securing tenure and selecting starter solutions were
refined, some supporting tables were developed. Three work-
sheets were evolved, instead of the Original, more
complicated one:
#1 is for sale of erven only;
#2 is for selection of the starter solution house
option;
#3 is for the sale of the erf and starter solution
house option at the same time.
The SCAS and the NHE management team have begun
developing the voucher and the controls system to manage
the implementation of the loans and the actual delivery of
building materials according to phases of construction.
The first draft of this system will be added to the
Operations Manual soon.
Some households in the Upgrading areas have relatively
high incomes or are entitled to housing subsidies from
their employers; they can afford and might want more than
what is offered by the Programme as starter solutions.
While describing the housing options available in the
upgrading program, the field personnel may inform these
households that they can obtain a bigger loan with
Programme's guarantee trom the Building Societies
participating in the Loan Guarantee Fund. An explanation of
the Loan Guarantee Fund for information purposes for the
field staff will soon be attached to the OM.
Training
Although neither the CDWs nor Self-help Construction
Advisors (SCA) contingents were yet not at full staffing
complement (only two of each), the training programme was
instituted on schedule (a copy of the Training Outline, as
well as the daily and later weekly training schedules is
attached as Annex 2.5/b). The concept is to use a
- 40 -
OSHAT:
continuing training process. Emphasis was first on
background and approaches to the programme work; then on
the processes and procedures for securing tenure of the
resettled population by assuring their purchase of the
erven and finally in the selection and implementation of
starter solutions.
In addition to the two CDWs and the two SCAs, the
Project Administrative Officer also participated full time
in the training. The Community Development Advisor
organized the training programme, and ran many of the
sessions. Other Team members, including the Programme
Coordinator, Field Supervisor and Field Coordinator
participated in some aspects of the training programme, and
ran some of the training sessions.
A detailed analysis of the training and implementation
process is in the "Lessons Learned: Erven Sales Exercise in
Freedom Land" paper I distributed June 23rd, attached as
Annex 2.1/b. The Community Development Advisor will
continue training sessions in September-October for the
entire team in community development promotion activities
and upgrading planning, activities and support, including
basic training for the new SCA and CDW. These sessions are
likely to follow the previous pattern of half-day sessions
during the first week, and shorter review and planning
sessions in the subsequent weeks.
Train: Tr;
A training trip to visit a low-income housing project
in an adjacent country is incorporated into the budget and
planning of the Oshatotwa programme was envisaged for
October 1993.
The purpose, planning and scheduling of this trip have
been discussed among the Team members. As the purpose of
the trip is to build on the field team's experience and to
help them in continuing operations, it was felt that
October would be too early for the trip. At that point the
team will have only recently completed the tenure security
phase (selling erven) and will be at the first lessons
learned stage of starter solutions. Many of the issues at
these early stages are unique to the resettlement aspect of
the upgrading project. The field team members will just be
moving into the questions and issues of maintenance, of
repayments, concentration on community development (as
opposed to individual security), and emphasis on step-by-
step upgrading and control and promotion of those building
operations and financing. Consequently, the trip seems to
be better timed in 1994, once experiences on the full
Project's cycle have been made, including the aifficult
tasks of enforcement and eviction.
Meanwhile, the SCAs and cCDWs have the
=
running
assignment in mind that, prior to the trip, the group will
41 -
ME-QUARTERLY PROGRESS REPORT 2-06/93-CHP. 2
establish specific goals of information and experiences
they wish to obtain from the training trip. Additionally,
each team member will have personal assignments, pertinent
to their specific work and interests, on which they will
collect information and materials, and prepare a report
that will be supportive of the work in the Oshatotwa
Housing Programm might be disseminated to other NHE
departments.
Two documents on the Self-Help Housing Agency (SHHA)
in Gabarone, Botswana, have been distributed to the CDWs,
for information and as a preview of a potential site for
the training trip. These include the manual in cartoon
format called "Family Molefi's Housing Problems and How
They Were Solved" (produced by the SHHA), and "Mansion in
the Sky: A Lesson in Self-Help Housing from Gabarone,
Botswana" (produced by the Cooperative Housing Foundation).
Proposals on the site to visit and a tentative
schedule will be set in the September-October period.
Contacts with potential hosts can then be made.
B. Work Programme and targets Or next qua 2
Operational targets for the third quarter were
established by the Project Team through a participatory
planning workshop. Conclusions are summarized in the
following table:
ACTIVITIES OUTCOME ASSUMPTIONS RESPONSIBLE
Assist in reorga- Workshop held witn 2 Agreement with MLGH CDWs+DK
nizing communities communities to discuss on outline for cty.
methods of cty.organiz organization
by-laws and objectives
Coordinate efforts Meetings with MRLGH CDWs + DK
with MRLGH activators activators, report
in particular re with results and
leadership elections conclusions
Support efforts to 2 Cty.Ctres. managmnt. Communities CDWs+DK
develop Cty.Ctrs. cttees. established and NGOs
and get them operated and rules for operatn. cooperate
by Cty., eventually constituted
with NGO One support organizat.
cooperation identifyed per Center
Assist communities Report on situation Municipality CDWs+DK
in organizing the of water taps and cooperates
management of water public toilets with
taps and public recommendations for
toilets action
2.6 INSTITUTIONAL DEVELOPMENT
TARGETS FOR QUARTER
In order to strengthen NHE's implementation capacity
and improve cooperation with the Ministry of Regional and
Local Government and Housing, the Municipality and NGOs the
following activities had been envisaged for the last
quarter:
= Review and update the Operational Manual
- Organize a first training workshop for Community
Development Workers and Self-help Construction
Advisors
- Evaluate role and future potential of the MRLGH
community activators and of NGOs
- Improve monitoring and evaluation system
- Promote inter-institutional dialogue on housing
issues.
REALIZATIONS, PROBLEMS ENCOUNTERED
The Operational Manual has been considerably improved.
Some procedures have been detailed and specified, others
have newly been introduced. A new layout makes the Manual
user-friendlier. The Manual is considered a working tool
which has to be adjusted as work goes on. It will still
take a long time to get all relevant procedures and
mechanisms sufficiently defined. As the Manual is part of
the Programme process, there will actually never be a final
version.
The Community Development Advisor was in charge for
reviewing and complementing the Manual. Important
modifications were introduced during the training workshop.
Some inputs were produced by the Institutional Advisor. The
Manual has already been requested by NHE staff from other
departments. The idea of having complete documentation of
how the Programme works is in accordance with NHE's
strategic objectives of improving effectiveness and
operational autonomy.
The Community Development Advisor also organized the
first training workshop for Community Development Workers
and Self-help Construction Advisors in which the Programme
Coordinator, NHE personnel, the Field Supervisor and the
Field Coordinator participated as resource personnel for
special sessions. As in the case of the Manual the training
effort will have to continue and cover new issues as the
Programme develops.
- 43 -
OSHATOTWA PROGRAI
iME~OUAR
TERLY PROGRESS REPORT 2-06/93CHP. 2
Possibilities of cooperation with the MRLGH community
activators and NGOs in the upgrading areas have been
evaluated, but not yet been put into joint action. As the
Community Development Workers need Support for attending
requests which are not directly linked to the Programme,
the issue will be taken up again in the next quarter.
Regular progress evaluation meetings have been held to
Specify and adjust the work programme according to
necessities. As the main policy decisions of the Programme
have been taken, a monitoring and evaluation system with
quantitative targets could be introduced (e.g. "600 deeds
of sale signed by Sept. 10" and "50 starter solutionsdefined by end of Sept."), in a participatory planning
workshop using visualization techniques, moderated by the
Institutional Advisor. Both the progress evaluation
meetings and the quarterly planning workshop are considered
effective management instruments and will be regularly used
in the future.
The inter-institutional dialogue on housing issues was
mainly promoted by the Field Supervisor and the Programme
Coordinator. In the following issues some progress was
achieved:
- The Municipality recognizes more and more NHE's
competence in the field of low-cost housing and is
ready to discuss the delegation of certain approval
functions to NHE.
_ The Municipality also demonstrates Openness in
discussing the reduction of layout and infrastructure
Standards in order to make housing solutions more
affordable; the Municipality has e.g. proposed a
reduction of minimum plot sizes to the Ministry of
Regional and Local Government and Housing.
The Municipality and the Ministry are
increasingly aware of the necessity of a reception
area where immigrants and those who cannot afford
other housing solutions can settle informally.
There is still little coordination between the main
actors of the housing process going on. For the next
Quarter the establishment of a National Housing Committee
should be promoted to facilitate communication and the
implementation of the National Housing Policy.
B. WOTK Programme ang ede We & LE fe Sd od etede & Ula tre!
Operational targets for the third quarter are
Summarized in the following tables:
~ 44
OSHATOTWA PROGRAMME-QUARTERLY PROGRESS REPORT 2-06/93-CHP.2
INSTITUTIONAL DEVELOPMENT
ACTIVITIES OUTCOME ASSUMPTIONS RESPONSIBLE
Prepare German Positive media coverage Maria Dax; AT
Minister's visit of Visit 1.08 PC-Mr.Kenneweg
Hire and train one Both operative by mid Hire:NHE,Consit
SCA + one CDW September Train: DK
Prepare proposal for Proposal and contacts PC-DK
training trip made by end October
Disseminate Operation Meeting presenting PC-DK
Manual within NHE manual to NHE's
personnel
Promote inter instit. Hsng.ctee.meets once MLGH,Mplty. and PC, KMCN
housing committee before end of Oct. other institutions
willing to particip.
Prepare proposal for Research report and PC + (?)
second KfW sponsored proposal submitted by
project end of Sept.
Organize quarterly Workshop held with CTA, PC
evaluation and 10 Oct. with Pr.Team, Programme Team
planning workshop Documentn.ready 15/10
REPORTING
Prepare and submit Reports ready, sent to AW, PC, KMcN
monthly reports NHE, KfW and SUM
one: 06/08, one 03/09
Third quarterly Draft ready 01/10 AW, DK
report Edited, sent: 15/10 JAC
AT: NHE's CEO, Axaro Tsowaseb
PC: Programme Coordinator, W.Schulte
DK: Don Kurtz, Cty.Dev. Advisor
AW: Field Coord. Andrew Walton
KMcN: Field Supervisor, K.McNamara
JAC: Chief Techn.Adv.,J.Crispo
45
¥ PROGRESS REPORT 2-06/93-CHP. 2
2.7 NHE'S RESOURCE CENTER
The re-organization of NHE's library is now completed
and ready for use by outside Organizations. The library is
organized according to the Dewey Classification System, and
1s divided into General, Reference and Periodical sections.
it was decided to rename it as NHE's Information Center.
The initial project proposal envisaged to employ a
librarian and an assistant. However, it was felt that the
amount of work to be done does not justify two people to be
employed. The assistant was asked to leave at the end of
May. To date, an amount of Rs. 10.705 was been paid out in
Salaries for the personnel of the Resource Center.
On June 24 the Information Center was officially
opened to the public. Eighteen outside organizations were
invited to the opening ceremony, as well as representatives
from the German Embassy and KfW. NHE's Chief Operational
Executive urged non-governmental organizations to make use
of the Information Center and offered them the use of NHE's
Auditorium, as part of a policy of working together with
NGOs to alleviate the housing problems of the lowest-income
sectors. They were also requested to submit Suggestions for
the purchase of additional material.
Representatives of various NGOs expressed their
willingness to use the facilities offered and initiate a
Process of exchanging books and information between
different centers in Windhoek. Since then, many NGOs have
formalized their membership in the Center and started using
the facility as well.
- 46 -
3.1 RECENT DEVELOPMENTS AT NH
In April 93 Mr Alpheus Gaweseb waS appointed Chief
Operating Executive of NHE. Other major changes of
personnel have not taken place in the last quarter.
In April 93 the Parliament passed the NHE Act by which
the transition from former pre-independence National
Building and Investment Corporation of Namibia to post-
independence National Housing Enterprise is legally
concluded. The parliamentary Act demonstrates the increased
political recognition and public credibility which NHE has
meanwhile achieved.
A crucial event for NHE's internal development was a
strategic planning workshop held also in April 93. NHE's
broad mission was defined to facilitate affordable housing
opportunities." The following corporate objectives have
been specified:
- Reorganize operational infrastructure to
facilitate people-centered, process-orientated
housing delivery emphasis
- Change the public image of the Corporation to
reflect a people-centered, process-oriented
organization whose operations focus on community
participation
- Improve NHE's efficiency, autonomy and financial
self-sufficiency
Build a team of motivated and resourced
personnel.
These objectives are intended to change NHE's housing
delivery system entirely: The share of completed housing
units for sale will be reduced, the share of self-build and
self-help projects will increase. In many: respects the
Oshatotwa Programme is the first test case of the new
strategy:
_ with its clear-cut community development
orientation,
- going to the clients instead of waiting for them
to come,
- attempting tailor made settlement upgrading and
housing solutions on a iarge scale,
- introducing up-front subsidies in line with the
National Housing Policy,
- developing bulk land to cut down the costs of
core house services and make them more affordable,
- mobilizing private sector capital through the
Loan Guarantee Fund,
- 4AVy -
OSHATOTWA PROGRAD
{ME-QUAI
2TERLY PROGRESS REPORT 2-06/93-CHP. 3
- emphasizing training, participatory planning and
evaluation as major tools of institutional
development.
Though the long-term strategy definitely points
towards the type of projects which are pioneered within the
Oshatotwa Programme, NHE will still for some time depend on
the execution of conventional housing projects for middle
income families. It will not be easy to make the funds
avallable for self-help support and community participation
activities. There are clear signals that the Government
subsidies will be withdrawn completely for the financial
year 1993/94. The challenge is to find a balance between
the commercially oriented conventional projects on one hand
and the community participation and self-help oriented
projects on the other.
3.2 ORGANIZATION OF THE PROGRAMME
Due to its innovative and strategic character the
Oshatotwa Programme is organized as a special task group
whose coordinator reports directly to the Chief Executive
Officer. The advantages are short decision lines and direct
communication to the top management, most important for the
initial phase of implementation.
There are seven permanent members of the Programme
Team: the Programme Coordinator, the Office Administrator,
two Self-help Construction Advisors, all paid by NHE, and
under the Consultant Contract the Field Coordinator and two
Community Development Workers. Non-permanent Team members
are the Field Supervisor, the Community Development
Advisor, the Institutional Advisor and the Chief Technical
Advisor, all under the Consultant Contract.
The particular arrangement of the Field Teams (with
self-help Construction Advisors hired by NHE and Community
Development Workers hired by the Consultant) has so far
worked quite well, due to a particular training and team
building effort organized by the Community Development
Advisor and strict supervision by the Programme
Coordinator.
In the future more attention should be paid to the
diffusion of information on the Programme. Other
departments, particularly the task groups of the Technical
and Social Services Section, should benefit from the
experience gained, both in the field working with the
clients and administratively by developing new procedures.
3.3 PERSONNEL
During the last quarter two of the three envisaged
Self-help Construction Advisors have been hired by NHE.
Both gentlemen, Mr Ernst Mathias and Mr Brian Graig, worked
as quantity surveyor and clerk of work in various
construction firms; they have good communication skills to
do their job in the field. They have been trained, together
with the two Community Development Workers, by NHE
personnel and the Consultant under the guidance of the
Community Development Advisor.
When the process of selling the erven started in June,
the SCA helped the CDWs in completing the worksheets and
preparing the deeds of sale. Though there is a certain
pressure to get the deeds of sale signed as soon as
possible and the workload of the two Community Development
Workers is tremendous, it is recommended that the SCAs
should focus on the definition of starter solutions in the
next quarter. Contacting the potential clients, explaining
them the Programme, developing the starter solutions with
those interested, preparing the individual work schedules
and supervising construction is a time consuming process.
The third CDW has been hired and will join the Team at the
beginning of September, and a third SCA is going to be
hired by the end of August.
The present Programme Coordinator, Mr Chris Steenkamp,
will probably leave NHE very soon. The Chief Executive
Officer has promised to do everything in order to fill the
gap as soon as possible and keep the Programme going. When
this Report was written a new Programme Coordinator was not
yet appointed.
Given the size and complexity of the Programme and the
need to deal directly with nearly 1500 beneficiaries, it is
Suggested that instead of one coordinator, NHE consider the
convenience and feasibility of appointing two persons: one
to coordinate the Upgrading Project and the other the for
the Core-House Projects. Each sub-Project requires
different kind of management and communications skills. The
model already on use for the Loan Guarantee Fund,
independently coordinated by NHE's Senior Manager of
Finance, Planning and Control, could thus be extended for
the other two main components.
3.4 COORDINATION MECHANISMS
Memos and the weekly team meetings each Tuesday
continue to be the most important internal coordination
mechanism. Regular evaluation meetings helped to adjust the
work programme regularly; a computer programme is being
introduced to facilitate a quick printout of these updates.
Participatory planning workshops were introduced
RAMME-QUARTERLY PROGRESS REPORT 2-06/93-CHP. 3
as a tool for revising the work programme with the entire
team, agree on realistic targets and assign
responsibilities. An increased team spirit and
identification of team members with the Programme's
objectives was also a side effect of this experience.
From Aprii till the beginning of June the Field
Supervisor produced weekly reports on the progress of the
Programme. The short reports, countersigned by the
Programme Coordinator turned into an effective instrument
of keeping NHE, SUM Consult and KfW informed. As the
Programme is now more and more defined the frequency of
these reports can be reduced in the next quarter; short
monthly reports are suggested to inform about progress in
July and August, before the next Quarterly Progress Report
due by the end of September.
3.5 LOGISTICS
AS explained in 2.1 (Community Centers), construction
of the Site Office is delayed. The original idea of having
one site office has slightly changed: the Field Teams
realized besides that it would be convenient to use all
envisaged community centres as temporary site offices.
The first community centre at Onghuwo ye Pongo, until
now a Simple shade structure, will be extended and receive
an additional room which can be used as a site office;
expected completion date: end of August. A similar
community centre will be constructed in Greenwell Matongo;
completion date: end of October. The community centre next
to municipal offices of Okuryangava, envisaged as the main
temporary Site Office will also probably be ready by the
end of October.
Meanwhile the CDWs use a caravan as a mobile office in
the upgrading areas. NHE is providing it, recognizing the
hardship of field work, especially during the cold evening
hours of the last month, with temperatures close to 0°.
As far as office equipment is concerned the Team has
recently bought a computer and a printer, and some office
furniture.
- 50 -
4.1 MINISTRY OF REGIONAL AN D LOCAL GOVERNMENT AN
D HOUSING
The Ministry has recently incorporated the Directorate
of Regional Government, in addition to the three existing
ones of Local Government, Housing and mmun 3
Development. NHE is politically accountable to the
Ministry; the Permanent Secretary and the Director of
Housing are on NHE's Board of Directors. NHE is, on the
other hand, an autonomous institution and does not depend
Financially on the Ministry.
Being a programme of cooperation between two
governments the Ministry is automatically involved in the
Oshatotwa Programme. Direct support was given during the
inception phase and to the Steering Committee which met
when implementation started. The Ministry also participates
when decisions with consequences for the National Housing
Policy are taken: the Ministry approved e.g. the
introduction of the innovative up-front subsidy scheme, but
refused a reduction of minimum plot sizes in order to make
solutions more affordable.
On a nationwide scale the Ministry is implementing the
Build Together Programme. This Programme is also targeted
to the same low-income groups as the Oshatotwa Programme,
but follows other principles and has more favorable
financial conditions, like e.g. relatively high interest
rate subsidies and no initial savings requirements. The
focus of the Build Together Programme is on the smaller
towns of Namibia. However three projects are envisaged in
Windhoek which may affect repayment behavior towards the
NHE Programme, particularly a project which aims at
resettling the Ombili squatters to Rocky Crest, an area at
the Western periphery of Windhoek (approx. 350 households).
In a recent internal analysis NHE considers the Build
Together Programme both as a threat and an opportunity. So
far the flow of information on the Build Together Programme
is rather sketchy. It is strongly recommended that the flow
of information should be improved and formalized. As the
Ministry receives regularly the Quarterly Progress Report
on the Oshatotwa Programme, NHE could request the Ministry
to provide progress reports on the Build Together
Programme. The next step would be to have joint meetings to
share the experience with both programmes and discuss
common problems.
Another area of common interest is related with the
community development activities in the upgrading areas
where an interesting division of labour could develop: The
Community Development Team of the Oshatotwa Programme
concentrates on the preparation of loan contracts,
infrastructure improvement and community centres, whereas
RAMME-QUAR
TERLY PROGRESS REPORT 2-06/93-CHP.4
the Community Activators of the Ministry's Directorate
promote representative leadership, community organization
and communal action. The problem is that the Ministry's
Community Activators are not often seen in the field though
they are usually invited to the meetings. As a result the
community leaders approach our CDWs who are busy with their
tasks, but cannot always refuse support. For the next
quarter another attempt is scheduled to improve cooperation
between the two teams.
MUNICIPALITY OF WIN
DHOEK
Cooperation with the Municipality of Windhoek has
improved considerably, not only in the day to day working
relations, but also on conceptual matters.
In the last quarter the Municipality has approved the
layouts for the first three core house projects, accepting
a certain reduction of standards, particularly related with
building value and electricity reticulation. The
Municipality keeps insisting however on having tarred roads
at the two core house sites of Khomasdal.
The Municipality has declared the readiness to cover
the costs of materials required for infrastructure
improvements in the upgrading areas, with an estimated cost
of materials of R 360.000, the Municipality will make an
important financial contribution to the upgrading
component.
How seriously the Municipality takes up issues raised
by the Programme, is evidenced by a paper on minimum plot
Sizes submitted to the Ministry of Regional and Local
Government and Housing. With reference to a recent
reduction of minimum plot sizes in Zimbabwe the
Municipality suggests a reduction from 300 m2 to 200 m2 in
Windhoek in order to obtain more affordable housing
solutions.
4.3 COOPERATION WITH NGOS
The NHE is making an effort to involve relevant NGOs
in their activities. For the opening of the Programme
sponsored Information Centre 18 NGOS were invited which are
active in the fields of housing and community development.
All of them showed up and most of them have filled the
registration form which allow them to make use of the
Information Centre. Meanwhile some of them have come again
and consulted the literature available.
A direct cooperation within the Programme has not come
into existence yet. For the next quarter it is envisaged to
- 5? -
identify one or two NGOs interested in developing their
activities in the upgrading areas and making use of the
Community Centres.
4.4 PRIVATE SECTOR
The private sector is already participating in the
Programme in different ways:
- On one hand, contractors, building material suppliers,
Surveyors and engineering consultantS are providing
different kinds of services;
- The SWABOU Building Society has joined the Loan
Guarantee Fund and will commit its own resources to develop
it. The SWABOU will also be instrumental in mobilizing
private builders and developers to offer low-cost housing
units within the range of loans supported by the LGF. It is
expected that NAMIB, the other building society, will soon
join the Loan Guarantee Fund.
4.5 STEERING COMMITTEE
The Steering Committee did not meet again in the last
quarter. Both the Chief Executive Officer and the Programme
Coordinator think that, after having agreed on the
Programme concept, it is not necessary to call for Steering
Committee's meetings during implementation.
When evaluating the experience, NHE members of the
Steering Committee feel that the expected inter-
institutional coordination has not been achieved though a
lot of time was spent. All the difficult issues had to be
dealt with and sorted out traditionally through individual
meetings with the responsible specialists, like the plot
size and up-front subsidy issues with the Ministry and the
land and infrastructure related issues with the
Municipality. Other complaints refer to a certain bias of
hierarchy and lack of continuity: NHE was represented by
high rank officials, but not all the other institutions; it
was not always the same people who attended the meetings.
Another reason pointed out is that there are just too
many meetings taking place on daifferent issues of housing
and urban development. Activities of committees that have
worked well for a short period of time, like the one which
formulated the National Housing Policy or the Squatter
Steering Committee, were unfortunately discontinued without
completing the processes initiated.
The establishment of a permanent National Housing
Committee to discuss the urgent housing issues of Windhoek
and Namibia could go a long way to adjust the National
Housing Policy and to develop a more coordinated inter-
- 53 -
OSHATOTWA PROGRAMM QUARTERLY PROGRESS REPORT 2-06/93-CHP.4
institutional response to housing problems. It should be
composed of high rank officials of the main institutions
involved in housing (MRLGH, NHE, Municipality of Windhoek),
representatives of NGOs and the private sector, and meet
regularly. The idea of a Housing Committee has already been
promoted by the Field Supervisor (who was previously
involved in the preparation of the National Housing
Policy), and by the Programme Coordinator. Areas to be
tackled include:
- Flow of information and exchange of experience
from Oshatotwa and Build Together Programmes
- Appropriate plot sizes and infrastructure
standards
- Affordability, subsidies and loan recovery
_ Reception areas
- Revision of the National Housing Policy.
In the next quarter readiness to establish the
National Housing Committee should be tested. If a basic
agreement among the main actors is reached, the Committee
could take over the role of the originally envisaged
Steering Committee. The inter-institutional approach should
also guide the intermediate Programme evaluation and
planning workshop, tentatively scheduled for February 1994.
The only disbursement of grant's funds during the
second quarter was a payment of DM 50.000 towards the first
quarterly installment to the consultants. The total amount
disbursed from the grant stands now at DM 2.588.785; the
balance to disburse at 7.011.215.
Three disbursements from the Disposition Fund have
been authorized by the Chief Technical Advisor since his
arrival in June, totalling Rs. 1.912.263,50. Out of this,
Rs 1.900.000 were used for opening a fixed investment
account in SWABOU for the creation of the Loan Guarantee
Fund. KfW agreed to substitute the procedure originally
envisaged (direct disbursement from KfW to a local
financial institution), and create the Fund by transferring
money from the Programme's Disposition Fund at the
Commercial Bank.
A total of Rs 3.862.045,79 (including R 80 in Bank
charges) has been disbursed since beginning of
implementation, and an amount of Rs 253.567.82 remains in
the Disposition Fund. The following table details account
movements since establishment of the Fund.
Call Account - KfW Project
Date Description Debit Credit Balance
22/07/1992 |Foreign
Exchange (3,727, 678.52) |(3, 727,678.52)
31/07/1992 |Interest (12,868.15) (3,740,546.67)
31/08/1992 Interest (44,476.64) |(3,785,023.31)
30/09/1992 Interest (42,775.95) |(3,827,799.26)
31/10/1992 Interest (44,701.35) |(3,872,500.61)
30/11/1992 |Interest (41,430.46) (3,913,931. 07}
31/12/1992 {Interest (40,720.97) (3,954 ,652.04)
31/01/1993 Interest (40,413.30) 13,995 065.34)
28/02/1993 |Interest (33,536.66) !(4,028,602.00)
12/03/1993 |Withdrawal 182 27,000.00 (4,001 ,602.00}
12/03/1993 Bank Charges 20.00 (4,001,582.00}
26/03/1993 |Withdrawal 3&4 1,923,495.00 (2,078 087.00)
26/03/1993 |Bank Charges 20.00 (2,078,067.00)
31/03/1993 |Interest (32,383.12) (2,110, 450.12)
30/04/1993 Interest (17,866.55) |(2,128,316.67)
31/05/1993 Interest (18,618.40) (2,146 ,935.07)
11/06/1993 |Withdrawal 5&6 11,470.79 (2,135, 464.28)
11/06/1993 |Bank Charges 20.00 (2,135,444.28)
30/06/1993 Interest (18,123.54) |(2,153, 567.82)
05/07/1993 |Withdrawal 7 1,900 ,000.00 (253,567.82)
05/07/93 |Bank Charges 20.00 _ (253,547.82)
- 55
OSHATOTWA PROGRAD
{ME-QUARTERLY PROGRESS REPORT 2-06/93-CHP.5
From the initial transfer of DM 2.000.000, an amount
of Rs 3.727.678,52 was credited into the account, an
exchange rate of at a rate of Rs 1,8638 (instead of the Rs
1,8=1 DM assumed for budget purposes). Interest earned by
the Disposition Fund since its creation amount to Rs
387.915,09. If the same rate of exchange is used to
estimate the DM equivalent, grant funds are increased by DM
208.108,95, for a total (rounded) of DM 9.808.000.
As well over 75% of the initial deposit has been
spent, the Disposition Fund should now be replenished.
According to the envisaged disbursement schedule, an amount
of DM 325.000 would be required for the next quarter. In
the last quarter expenditures are expected to increase
substantially as infrastructure upgrading and land
development works proceed. As interests earned in Windhoek
add substantially the amount in rands available for the
Programme, it is suggested that a KfW transfer a minimum
amount of DM 1.000.000
As agreed, Programme's expenditures will be financed
by NHE and reimbursements from the Disposition Fund
approved by the Chief Technical Advisor during his missions
to Windhoek.
3.2 REVISION OF PROGRAMME BUDGET
An important revision of the Programme Budget was made
during June to adjust it to recent developments, to updated
information on households income and affordability and
other considerations. Details of reasons for changes are
included in the relevant sections of the report. The main
changes involve:
UPGRADING PROJECT: |
- A slight increase in the number of beneficiaries;
- NHE waived the proposed requirement of 10% initial
Saving on land purchase;
- The Municipality is cooperating with funds for
water and sewerage lines;
- NHE decided to implement full water and sewerage
reticulation instead of the originally proposed
infrastructure upgrading;
- The number of potential starter solutions have been
reduced from 600 to 400, the average cost increased
to Rs 5.000.
CORE-HOUSES:
- Block land costs established by the (Municipality
were over 10% higher than expected;
- MRLGH's decision increasing the minimum size of
plots from the envisaged 200m2 to a minimum of 300 m2
resulted in big cost-increases;
- Land development costs augmented due to imposed
higher standards than originally proposed;
~ 56 -
- NHE will supply fully developed plots at Otjomuise
to develop a fourth core-house project.
BUILDING MATERIAL LOANS:
- Reassessement of affordability in the upgrading
areas and other considerations lead to sharply reduce
the estimated potential number of loans.
The revised budget consolidates two elements: payments
made and expected payments. The budget is shown in two
currencies with varying exchange rates. For payments
already made, the real exchange rate at the time of
conversion of disbursements in DM from KEW is now used. For
future payments, an exchange rate of 1 DM = 1,9 Rs. is
adopted. (Both in the Inception Report and Quarterly Report
N.1 an average exchange rate of Rs 1,8=1DM was used for
budget purposes).
The table in page 58 resumes the updated budget;
charts in p. 59/60 visualize and compare it with the
original budget in the Inception Report. Except for the
LGF, funds already disbursed ( posts 1.1, 5.1, 7.1 8) were
converted at the rate of Rs 1,8/DM; other budget posts were
converted at the actual rate of Rs 1,9/DM.
5.3 ADHERENCE TO DISBURSEMENT SCHEDULE; ESTIMATED
DISBURSEMENTS FOR THIRD QUARTER
The following table indicates projected and actual
disbursements for the second quarter, total disbursements
by component till end of June and projected disbursements
for the third quarter according to revised work programme:
PROJCTD.DISB.ACTUAL DISB. TOTAL DISB. PROJCTD.DISB.
COMPONENTS 2nd.QUARTER 2nd.QUARTER TILL 06/93 3rd.QUARTER
1. UPGRADING AREAS 80,90 6,8 1.073,4 160 ,0
1.1 Land & basic infrastr. 0,0 0,0 1.066,6 0,
9
1.2 Infrastr.improvemt. 30,90 0,0 6,0 65,
0
1.3 Starter solutions 30,0 9,0 0,0
30,0
1.4 Community centers 20,0 6,8 6,8 65,
0
2. CORE-HOUSES 75,0 0,9 0,0 35,0
2.2 Land development 75,0 0,92 0,0 35,0
2.3 Core-house construct. 0,6 o,0 o,¢c
0,0
2.4 Community centers 0,9 C,9 C,5 o,
6
3. LOAN GUARANTEE FUND 1.000, 1.000 ,0 1.000 ,0 0,0
4, BLDG.MATERIAL LOANS 0,0 0,0 0,0 0,0
5. CTY. DEVELOPMENT FUND 15,0 0,0 5,3 10,0
7. CONSULTANTS 120,0 120 ,0 588 ,8 120,0
8, RESOURCE CENTER 0,0 0,0 10,6 0,0
9. CONTINGENCIES 50,0 0,0 0,0 0,0
10. TOTALS 1.340,0 1.126,8 * 2678,7 325,0
* Includes payments made out of interests earned in Windhoek DM x 1000
Q
O
S
H
A
T
O
T
H
A
P
R
O
G
R
A
H
H
E
~-
G
E
N
E
R
A
L
B
U
D
G
E
T
R
E
V
I
S
E
D
J
U
M
E
1
9
9
3
Paes
w
e
e
n
e
r
m
Neel
S
R
O
h
S
O
E
Seek
Smet
M
e
S
i
e
wane
H
E
L
A
UmeeY
G
e
n
k
t
e
M
M
R
S
O
M
E
S
e
e
S
e
e
H
e
n
e
m
m
y
M
e
e
S
m
K
O
R
E
G
e
e
A
m
m
e
Gone
teem
m
E
o
m
e
B
e
d
GOOD
R
O
D
e
b
e
n
B
e
e
s
HUHBER
O
F
A
V
R
G
.
UNT.
|
T
O
T
A
L
C
O
S
T
S
.
__
_
.
.
.
.
SOURCE
OF
FIHAW
C
E
C
O
M
P
O
N
E
N
T
S
S
O
L
U
T
I
O
N
S
C
O
S
T
S
R
S
R
S
O
H
E
f
H
-
D
H
K
F
H
-
R
S
M
H
E
-
R
S
B
E
M
E
F
-
R
S
P
R
.
G
E
C
T
.
H
U
H
.
i
.
U
P
G
R
A
D
I
N
G
A
R
E
A
S
i
0
0
0
i
9,426
5
,
0
1
2
2,960
5,
596
3,235
2
4
2
0
0¢60~C!
®
~
*
~
S
D
1
.
1
L
a
n
d
&
b
a
s
i
c
i
n
f
r
a
s
t
1
0
0
0
a
4
,
9
8
3
2
,
6
7
4
1
,
0
3
0
1
,
3
2
0
3
,
0
6
3
0
0
0
l.é@
I
n
f
r
a
s
t
r
.
i
n
p
r
o
v
e
n
t
.
1
,
9
9
3
1
,
0
4
9
8
2
5
1
,
5
6
8
5
0
1
2
0
3
6
3
1
.
3
S
t
a
r
t
e
r
s
o
l
u
t
i
o
n
s
4
0
0
3.20
2
,
0
0
0
1
,
0
5
3
8
3
5
1
,
°
0
1
9
9
2
0
0
0
0
1
.
4
C
o
m
m
u
n
i
t
y
c
e
n
t
e
r
s
J
1
5
0
.
0
4
5
0
e
a
r
2
0
9
3
9
7
2
3
A
D
U
0
2
.
C
O
R
E
-
H
O
U
S
E
S
=
4
3
0
2
5
.
2
10,850
S,ri0
=
3
,
388
6,415
3,565
1
,
0
7
6
o
g
@
c
o
l
L
a
n
d
&
b
a
s
i
c
i
n
f
r
a
s
t
4
a
0
v
e
r
3
,
3
2
4
1
,
7
4
9
0
0
2
,
9
9
2
3
3
2
0
0
e
e
e
L
a
n
d
d
e
v
e
l
o
p
n
e
n
t
e
e
d
5
.
6
l
,
e
r
l
B
6
9
5
6
9
1
,
0
5
1
6
3
l
e
r
Ul
0
ceed
C
o
r
e
-
h
o
u
s
e
c
o
n
s
t
r
u
c
t
{
a
0
1
3
.
5
1
,
8
0
5
3
,
0
5
5
p
t
t
D
4
,
9
3
r
e
a
r
E
V
QO
0
2
.
4
C
o
m
m
u
n
i
t
y
c
e
n
t
e
r
s
J
1
5
0
.
0
4
5
0
e
a
r
e
e
l
3
9
?
2
a
3
0
o
0
3
.
L
O
A
N
G
U
A
R
A
N
T
E
E
F
U
W
D
-
1
1
,
9
0
0
°
°
6
,
2
8
3
©
=
©
6
1
,
0
0
0
©«1,900
'
o
O
1
,
0
0
0
£
9
,
0
0
0
o
O
J
.
1
L
o
a
n
G
u
a
r
a
n
t
e
e
F
u
n
d
1
,
9
0
0
1
,
0
1
9
1
,
0
0
0
1
,
3
0
0
0
0
0
0
3
.
2
P
r
i
v
a
t
e
s
e
c
t
o
r
l
o
a
n
s
o
t
)
4
0
.
0
1
0
,
0
0
0
5
,
2
6
3
0
CI
0
1
,
0
0
0
4
9
,
0
0
0
0
4
.
B
L
O
G
.
H
A
T
E
R
I
A
L
L
O
A
H
S
s000COCOtSCS
4
.
0
i
,
2
u
o
|
)
ba2
0
0
5i2.
373
w
e
)|)):té<is(<is;éCSSS!:C
5S.
C
T
V
.
DEWELOPHEHT
F
U
N
D
S
S
w
o
0
0
qq
0
0
0
0
r
o
0
0
a
0
)
t
~
"
o
S
o-
t
e
l
P
r
o
d
u
c
t
i
o
n
o
f
2
w
i
d
e
o
s
2
0
1
1
1
0
1
8
eS
0)
0
0
j
.
2
U
n
a
s
s
i
g
n
e
d
B
O
a
2
3
0
a
f
5
()
U0
0
6B.
N
H
E
P
E
R
S
O
N
N
E
L
C
O
S
T
S
<
d
;
,
a
4
d
a
T
o
r
o
O
u
1,343
e
r
e
s
e
n
b
o
l
P
e
r
s
o
n
n
e
l
1
,
0
1
3
d
d
0
0
1
,
0
1
3
)
0
QO
B
.
e
L
a
n
d
s
u
r
v
e
y
w
W
e
n
g
i
n
e
e
r
i
n
g
f
e
e
s
3
3
0
i
r
0
0
3
3
0
1)
0
0
?
.
(
C
O
M
S
U
L
T
A
N
T
S
2
,
7
2
2
1
,
4
4
8
°
°
1
,
4
4
8
2,
Fae
0
f
e
l
I
n
c
e
p
t
i
o
n
p
h
a
s
e
a
l
e
a
d
a
n
g
a
0
0
0
0
0
f
.
e
I
e
p
l
e
n
e
n
t
a
t
i
o
n
p
h
a
s
e
2,clle
1
,
1
5
9
1
,
1
5
9
ey
c
l
e
)
0
0
0
8B.
R
E
S
O
U
R
C
E
C
E
N
T
E
R
0
e
e
e
e
r
e
9
.
C
O
N
T
I
N
G
E
N
C
I
E
S
=
4
4
9
a
4
0
0~C~<i=iit:*s0
u
C
i
Oo
i
s
.
T
O
T
A
L
S
=
r
r
O
3
8
,
5
9
5
2
0
,
2
9
5
4
,
8
0
8
16,
540
f
,
0
5
¢
¢
,
4
3
2
4
,
0
0
0
3
6
3
OSHATOTWA PROGRANNE-~ OF COMPONENTS
Jaume 42993 wevigien
CONSULTANTS ¢¬7, 43
sre
; ore on z ¬24,, G2
ne
~
landregattatet tt tr aa ta tea a
s es ete ee 2.
Fle tne een Car a ean tet eanEOee ane MaEIR
O O Oe eeAt
ee =os
= Booch ge ta et at soSee eekee ar
RTTT ete ee NE Ne oa Te I a ea
Pree PCR OE ERC ALMR
E eeeteeta aat eataeeaeetedeaeeettnPt oe at ame ne Nes noe Ped eee ga mrs teat nee ta
ad oe seek ee a a eer
ets Be See
L@AMN GTEER.FUNDS ¢¬¢31;, LxH3
GOME-HOUGE «¬2@, 23%3
RESOURCE CENTER ¢@, 1X3
WLIHP-~ OF COMPONENTS
Imoeption Report Budge t
CONSULTANTS ¬G,B%>
NHE PEGASO. sitsfats?
UPGRADING ¢¬22., 6243
BLG .MATERIAL LOANS Cil,3%3
CONTINGENCIES ¬2.6%3
CORZE-HOUSE C21, 35%3
LOAN GTEE. FUND C33, 8x3
EPORT 2-06/93=-CHP.5
TERLY PROGRESS
OSHATOTWA PROGRAMME-QU
June LSS Badges ¢
SOURCES OF FINANCE
UNECLIPaLITY ¬@, Sx
SALGaATE Gx
C
L
O
G
+
3
0
h
o
e
eS
R
R
R
u
r
a
a
a
uO
P
s
L
U
E
O
C
U
N
I
C
S
M
L
R
O
U
e
E
S
C
C
E
P
R
C
E
E
i
e
?
BENEFICIARIES ¢¬6,3%3
a
ORC)aOI)O
G
U
O
P
O
U
R
R
I
C
O
C
C
I
R
A
T
T
L
E
S
E
A
T
a
n
a
a
n
SOURCES OF FINANCE
inoeeption Report Badge ¢
Cx
ane
B
R
P
:
atets
a
Sa)
e
e
t
OO I)aaeraat nae an tna
00.¢C30%G0oO++t+*ty(»
PRIVATE SECTOR ¬23,82%3
o
e
i
e
OO
O
g
O
U
E
O
R
R
¬i@G,1%K>BENEFICIARIES
HHH ¬14, 6>
60
AND REAL PERSONNEL ASSIGNMENT
The following table shows planned and real assignment
of SUM-McNamara Consultants personnel. Changes between the
planned and actual schedule resulted from the resignation
of Ms. Salmi Kaulinge, on of the CDWs and difficulties to
hire a qualified third community development worker.
PLANNED AND EFFECTIVE ASSIGNEMENT OF CONSULTANT PERSONNEL
SECOND QUARTER 1993
PERSONNEL APRIL MAY JUNE MONTHS
Chief Technical Advisor JAC >>>>>>>>>>>> 1,0
XXXXXKKKXXKKK 1,0
Institutional Advisor RZ >>>>>> 0,5
XXXXXX 0,5
Community Development Advisor DK >>> >> >>> >>> >>>>9>>9>99>>9> 2,0
XXXXXXXXXXKKXXXKKKKKKXKXKXKX 2,0
Field Supervisor KMN > > > > > > 0,8
x x x x x x
Field Coordinator AW >>>>>>>>>>> >> >> >> DD >>> DDD DDD DDD DD DDD 3,0
XXXXXXXXXXXXKXKXXKKXXKKKXKKKXKKKRKKKKKKK 3,0
Community Development Worker 1 SS >>>>>>>>>>>>>>>>>>>>29>>>>>>29>9>>>> 3,0
XXKXKXKKKXKXXKXKKKKKKKXKRKKKKRKKRARKKRAKXK
Community Development Worker 2 SK >>>>>>>>>>>>>>>>>>22>229>9>>>9>9>>>> 3,0
XXXKXXKKXKKKKKKKKKKKKKKKKKKXKX 2,5
Community Development Worker 2 AT XXXXXXXXXXXKX 1,0
Community Development Worker 3 PT >>> >>>>>>>>>>>9>>> 1,5
0,0
JC:Juan Crispo RZ: Roland Ziss PLANNED >>>>
DK: Don Kurtz KN: Kerry McNamara REAL XXXX
AW: Andrew Walton SS: Sophy Shaningwa
SK: Salmi Kaulinge AT: Aune Tjirare
PT: Petronella Taaru
6.2 SERVICES RENDERED
The Chief Technical Advisor mission's was scheduled
for one and one half month, from early June to mid-July (at
NHE's request the CTA extended his mission for a week to
help facilitate the transition in Programme's Management in
view of the resignation of NHE's Programme's Coordinator).
During his mission the CTA:
x Reviewed the progress of work and assisted in the
actualization of the work programme for third
quarter;
* Assisted NHE to reach a decision on level of
infrastructure improvement in the upgrading areas;
QUARTERLY PROGRESS REPORT 2-06/93-CHP.6
* Helped identify a fourth location for the core-
house project at Otjomuise, arranged with NHE the
supply of developed land and the increase in the
total number of units in this project;
* Worked with the Municipality and the engineering
consultants appointed for the Upgrading and Core-
House Projects to define standards, adjust work
programs and contractual procedures;
* Was involved in the final negotiations to launch
and get operative the Loan Guarantee Fund;
* Assisted the Programme Team in developing operating
procedures for the different components;
* Re-assessed budget assumptions and proposed a
revised budget in line with developments since the
beginning of implementation and household income data
recently collected in the field;
* Certified disbursements in second quarter;
* Participated in some field community meetings;
* Prepared and edited the final version of the
Quarterly Progress Report N.2;
The Institutional Advisor's mission lasted for a
month, since mid June to mid-July. During his mission the
Institutional Advisor:
* Assisted in the evaluation of information collected
from the field, elaborated policies to deal with
special Situations encountered and re-assessed
affordability of households with a view of revising
the Programme Budget;
x Reassessed potential for starter solutions and
building material loans;
* Organized and moderated planning workshop with all
team members to establish work targets and assign
responsibilities for next quarter. This method is to
be incorporated as a quarterly feature of Programme
Planning.
* Helped prepare the visit to the Programme of the
German Minister for Economic Cooperation;
* Worked on improved coordination between the
Programme and the Directorate of Housing in the
Ministry of R and LG &H.
* Assisted in the preparation of the Quarterly
Progress Report N 2;
The Community Development Advisor's mission lasted for
two months, from early May to end of June. During his
mission, the CDA:
x Reviewed and adjusted preliminary operating
procedures outlined during the first quarter;
* Updated the Operations Manual, adding new
procedures when required;
- 62 -
OSHATOTWA PROGRAMM
QUARTERLY PROGRESS
REPORT 2-06/93-CHP.6
* Was instrumental in coordinating Programme work
with other NHE services, particularly the Loan
Administration Dpt.;
* Assisted in the preparation of community meetings,
attended the meetings, evaluated the results and
performance of CDWs and suggested changes when
required;
* Identified and hired two Community. Development
Workers;
* Developed a training schedule and conducted
training for the Project personnel;
* Monitored development of working relations with
MRLGH community activators;
* Participated in the preparation of the Quarterly
Progress Report N.2;
The Field Supervisor was involved on a part-time basis
along the whole period. His main activities were:
* Advise and monitor work programming and progress;
* Advise on policy and procedural matters, assistance
in solving pending issues that were delaying
Programme implementation;
x Preparation of weekly Progress Reports and
participation in Team meetings;
* Institutional development, specially regarding
coordination with the Municipality and MRLGH;
promoting the creation of a Housing Committee and
Reception Areas;
x General backstopping to the Programme Coordinator
and the Field Coordinator.
The Field Coordinator was involved on a permanent
basis during the period. His main activities were:
* Revising lay-out plans for core-house projects
after MRLGH decision on plot size, presenting them to
the Municipality and giving follow-up to the matter
till obtaining Council's approval;
* Submitting plans to NAMPAB and obtaining approval;
preparation of documentation and submission to
Township Board;
* Negotiating with Municipality reduction of planning
Standards and infrastructure development;
* Supervision of elaboration of CAD technical
drawings for core-house and upgrading projects;
* Assistance in appointing engineering consultants
and land surveyors, briefing them, coordinating and
monitoring of their work;
* Design of two community centers, supervision of
preparation of technical drawings, of construction,
control of payments to contractors;
* Cooperation with the Project Coordinator in the
preparation of work schedules and monitor of work
progress;
A\\TOTWA PROGR! ARTERLY PROGRESS REPORT 2-06/93-CHP.6
OSH
The involvement and tasks performed by the Community
Development workers are described elsewhere in this report.
6.3 CONSULTANT'S SCHEDULE FOR THIRD QUARTER
The following table indicates scheduled assignment of
consultant personnel for the third quarter of
implementation:
PLANNED ASSIGNEMENT OF CONSULTANT PERSONNEL
THIRD QUARTER 1993
PERSONNEL JULY AUGUST SEPTEMBER MONTHS
Chief Technical Advisor JAC XXxXxXxx 0,7
Institutional Advisor RZ XxXxXxX 0,5
Community Development Advisor DK XXXXXXXXXXKX 1,0
Field Supervisor KMN x x x x x x 1,0
Field Coordinator AW XXXXXXXXXXXKXXKXKKKKKKKKKKKKKKKKKKIKK 3,0
Community Development Worker 1 SS KXXXXKXKXKKXKXKXKXKKXKXKKKRKKKKKKKKKKIKIIK 3,0
Community Development Worker 2 AT KRRXKXKRKRKKKKKKXKKKKKKKXKKKKKKKKKKKK 3,0
Community Development Worker 3 PT XXXXXXXXXXXX 1,0
JC:Juan Crispo RZ: Roland Ziss
DK: Don Kurtz KN: Kerry McNamara
AW: Andrew Walton ' §S: Sophy Shaningwa
SK: Salmi Kaul inge AT: Aune Tjirare
PT: Petronella Taaru
2-06/93-CHP.7
With the exception of para 3.4 of Separate Agreement,
all conditions of the Financing Agreement and the Separate
Agreement have been fulfilled by NHE:
The monthly household income of the Programme
beneficiaries is considerably below three times the
Primary Household Subsistence Level. A household with
a higher income will be automatically eliminated from
the waiting list for the core house projects
(Financing Agreement, Article 6.1 i).
- The financial burden of the household cannot be
assessed yet empirically, as only some loan contracts
have been signed in the upgrading areas. With the
basic concepts of affordability and sustainability it
will be unavoidable that the poorest households will
have to leave the Programme. However, up-front
subsidies will provide poorer household access to the
Programme and every effort is made to maintain the
number of leavers as small as possible. When
assessing the payment capacity for starter solution
loans, a maximum financial burden of only 20 % of the
household income for housing is assumed (Financing
Agreement, Article 6.1 j).
- Selection procedures have been largely determined
for the core house beneficiaries. In the resettlement
areas all households automatically are Programme
beneficiaries. Gender specific selection criteria do
not seem to be relevant in the urban context of
Windhoek (Separate Agreement, para 3.3).
Because of inefficiencies the Steering Committee
did not meet again (see chapter 4.5). It is suggested
to establish a high rank National Housing Committee,
but the readiness for commitment of the other
institutions has still to be tested (Separate
Agreement, para 3.4).
- Community Development Workers and Self-help
Construction Advisors promote actively the
participation of beneficiaries in the Programme
(Separate Agreement, paras 3.5 + 3.6).
- For all contract construction work and the
purchase of building materials in bulk tendering is
envisaged (Separate Agreement, para 3.7).
- NHE will not use any asbestos cement product in
the Programme (Separate Agreement, para 3.8).
- NHE is addressing NGOs not only to invite for
participation in the Programme, but also as
beneficiaries of the Resource Centre (Separate
Agreement, para 3.9).
JAC/RZ-090793
- 65 -
O
m
e
fo
s
"
e
a
fi
e
a
e
er
en
ce
zs
&
F
E
T
A
UEIN
OSHATOTWA PROGRAMME - QUARTERLY PROGRESS REPORT 2 -JUNE/93
»
ANNEX 2.1/fa
MUNICIPAL COUNCII.' s
RESOLUTION
ON INTERIM RATES AND TAXES
3.3.2.4
&& *&
6
6. That the Municipal Coun
cil delegate its authority,
conferred on it in terms of
section 50 of the Local
Authorities Act No. 23 of
1992, to approve the
temporary use of a public
open space for the
purpose of paim reading an
d other uses as it may
deem fit, to the Manageme
nt Committee with the
unconditional authority for
further delegation to
the City Engineer, the D
irector Properties and
Protective Services and the
City Health Officer,
provided that such uses fal
l within the parameters
described in paragraphs 1 t
o 5 above.
(Municipal Council Agenda: 1993-04
-28)
F.3 NATIONAL HOUSING ENTERPRISE
EXEMPTION. FROM PAYMENT OF ASSESS
MENT
RATES . |
(5/3/1/1)
On 22 February 1993 a lett
er was received from the
National Housing Enterprise
stating that they had
recently applied to the Muni
cipality for exemption from
payment of rates and taxes
on certain erven owned by
National Housing Enterprise.
:
The erven in question were
those used to resettle abo
ut
960 households who had previo
usly squatted on municipal
land adjacent to the Katutu
ra Single Quarters. The
relocation operation was a j
oint venture involving the
Ministry of Local Government
and Housing, National
Housing Enterprise and the
Municipality as the main
players on the Resettlement
Committee.
They, however, were informed
on 2 February 1993 of the
Management Committee's decisi
on to reject the mentioned
application. The reasons
supplied were that the
Municipality was not legall
y empowered to grant such
exemption, and that it wa
s experiencing financial
constraints. :
.
National Housing Enterprise
once again appealed to the
Municipality to reconsider i
ts decision on the grounds
stipulated on pages 35 - 36 a
ttached to the agenda.
The financial implications of t
heir request for exemption
of payment for assessment rate
s only are as follows:
Goreangab Extension 1 5 725,76
Erven 2096 and 2098, Okuryangava Ext. 3 11 828,52
Erven 2311 and 2312, Okuryangava Ext. 5 4 627,48
Erf 2313, Okuryangava Ext. 5 23 983,37
Erf 2320, Okuryangava Ext. 968,51
Erf 2324, Okuryangava Ext. 5 1 486,28
Exrf 2326, Okuryangava Ext. 5 - 9 588,03
Erf 2329, Okuryangava Ext. 5 7 678,14
i 875,58
Erf 2332, Okuryangava Ext. 5
The National Housing Enterprise requested exemption from
payment and the Managing Director argued that the
Squatters of the single quarters actually Squatted for
"free" at the single quarters using municipal services
without payment and also not paying assessment rates.
Once the National Housing Enterprise moved the Squatters,
the National Housing Enterprise suddenly became liable
for squatters financial liabilities towards the
Municipality. This did not seem to be fair practice.
The Local Authorities Act, 1992 (Act Number 23 of 1992)
does not provide that the National Housing Enterprise may
be exempted from the payment of assessment rates and it
does not provide that the assessment rates may be
reduced. Section 30(1)(z2)(ii) of the Local Authorities
Act provides that the. Local Authority Council shall have
the power with the prior approval in: writing of the
Minister in every particular case and subject to the
conditions as he/she may determine, to make grants or
donations. :
After consideration, the Management Committee
RECOMMENDED
That, subject to Ministerial approval in terms of Section
30 (1) (2) (ii) of the Local Authorities Act 23 of 1992,
the National Housing Enterprise be exempted from payment
of assessment rates for the period up to 31 January 1993
as follows:
8.3.2.5
R
Goreangab Extension 1
5 725,76
Frven 2096 and 2098, Okuryangava Ext. 3
11 828,52
Erven 2311 and 2312, Okuryangava Ext. 5
4 627,48
Erf 2313, Okuryangava Ext. 5
23 983,37
Erf 2320, Okuryangava Ext. 95
15 968,51
Erf 2324, Okuryangava Ext.
1 486,28
Frf 2326, Okuryangava Ext. 5
§ 588,03
Erf 2329, Okuryangava Ext. 5
7 678,14
Erf 2332, Okuryangava Ext. 5 1
875,58
82.761,67
Financial implications
R82 761,67 Vote 10/1/...
(Municipal Council Agenda: 1993-04-28]
J.3 44TH ANNUAL CONGRESS -
ASSOCIATION FOR LOCAL AUTHORITIES
IN NAMIBIA
(13/4/10)
Noticewas received that the forty-fourth annual cong
ress
of the Association for Local Authorities in Nam
ibia will
be held on 16 and 17 June 1993 in the Safar
i Hotel,
Windhoek.
The Secretaryof the said association requested motiv
ated
subjects for discussion for inclusion on the agenda on
or
before 11 May 1993.
In view of the urgency of the situation and to
expedite
future procedure, the Management Committee
RECOMMENDED
That the Management Committee be authorised to cons
ider
and approve items for discussion to be included
in
agendas of congresses of the Association for Lo
cal
Authorities in Namibia as well as finalise all matt
ers
relating thereto.
a
a
N
a
a
m
e
a
a
h
p
s
n
a
n
e
t
i
c
y
a
1
b
o
[
[
f
y
a
n
L
E
L
l
_
L
L
fe
T
A
R
i
a
ae
s
x
7
a
F
i
|
B
y
a
T
r
l
q)
OSHATOTWA PROGRAMME - QUARTERLY PROGRESS REPORT 2 -JUNE/93
ANNEX 2.1/S/b
DESCRIPTION OF FREEDOM LAND
ESZPERIENCE
22 June 1993
TO: C STEENKAMP
K McNAMARA
P CRISPO
AWALTON
S SHANINGWA
A TJTRARE
B GRAIG
EF MATHIAS
FROM: D KURTZ Jiky
SUBJECT: LESSONSLEARNED PAPER ON FREEDOM LAND ERVEN SALES
Following is a copy of the paperI've thrown together (and someplaces it may actually have
that appearance of not exactly fitting) in which I try to cover the experience of the first
intensive sale of erven exercise which we undertook in Freedom Land.
The paper tries to incorporate both training and field experience, and the supporting
discussions and processes that went on within the team and with NHE.
It should be considered a working paper, not a polished and definitive analysis.
Piles LESSONSERE
OSHATOTWA HOUSING PROGRAMME
National Housing Enterprise
Windhoek, Namibia
Background:
At the end of May 1993, final basic policy and price decisions were completed bytheNational Housing Enterprise (NHE) and relevant minister and municipal authorities,concerning sale costs for erven in the Oshatotwa Housing Programme (OHP). NHEchosetO concentrate on selling the erven (and starter solutions later), beginning in the FreedomLand settlement, because of the longevity of those residents on those erven (second longest
to Onghuuo ye Pongo).
The project team decided to begin the training session on Ist June 1993, CommunityDevelopment Worker (CDW) and the second Self-help Construction Advisor (SCA) were to
begin work on that date. Plans were to emphasize, after general introduction of NHE andOHP,first the process, policies and procedures of selling the erven, and then the processes,policies and procedures involved in deciding on the starter solutions, including the optionsavailable and selection of affordable solutions.
Preparation and Training: Worksheets and Tables
In February and March, and in May, a worksheet evolved to make the transitionbetween the application (made some six months or more before the erven could actually be
sold), to adjust to changes in status, and to calculate the exact monthly repaymentrate on
loans to cover the purchase of erven andstarter solutions. At first, a single worksheet was
tried, to cover all variations; however, that became almostas complicated than an incometax
report form. Consequently, three worksheets were developed. The first (Worksheet # 1) is
for use for sale of the erf only. The second (Worksheet # 2) is for selection of a starter
solution. The third (Worksheet # 3) is for sale of both the erf and the Starter Solution at the
Same time.
A varicty of calculations were provided in table form, so that figures could be entered
from reference sources rather than from on-the-spot calculations, in the hopes of Increasing
aecuracy. A separate section was set up in the Operations Manual for forms, tables and
information specifically needed for working with in the field to prepare the three Worksheets.
This section is called the Field Manual, and can be easily extracted and carried around to
various sites in a smaller notebook or binder. |
The tables developed for the Worksheet effort Originally were three. Thefirst was the
Subsidy Rates Table, which presents the Up-Front Subsidy Rates for Erven by PHSL and
income rangelevels.
2.
The second table is the Erven Prices and Fees Table. This identifies the two groups
of resettlement communities, and the prices ofthe ervin for each of those two groups. Ii also
shows the monthly amountoftransfer fees and bondregistration fees that will be charged on
that erf's sale. |
The third table is the Starter Solution Options Table. This shows, for each starter
solution type house, the options available within that type, so that when a person decides on
a Type A 4 house, for example, within the category, he or she also selects the basic solation,
or one of three other options.
The Field Manual also includes diagrams of each of the 10 Type A and six Type D
solutions, 14 of which include four options within each type (Type D 1 and Type D 2 include
only two options each).
[In mid June another option was discussed (the walls of the bathroom), as so many
people seemed to want them right away. These could be built within any option except Type
D 1 and Type D 2. That option had not yet been decided upon nor fully developed and
costed as of this writing.|
During the training exercises, an additional table was added to allowfield workersto
calculate the exact costs of a loan. That is the Erf Amortization Table, which shows the
monthly repayment amounts for the various erf prices and up-front subsidy rates
combinations.
Preparation and Training: Staff Training
On Ist June, training sessions for the Community Development Workers (CDW's) and
the Self-help Construction Advisors (SCA's) were begun. A copy of the CDW & SCA.
Training Outline, as prepared before the session, is attached. The intention was to spend the
first week with morning training sessions in the office, and afternoon sessions doing field
work. That plan was interrupted the first day when it became clear that NHE expected the
OHP staff to do the entire worksheet and deed of sales operations for selling the erven, and
later, for selling the starter solutions. This led to the revising of the Worksheet # 1 to enable
the field staff to calculate the exact monthly repayment costs, and to the preparation of the
Erf Amortization Table (mentioned above).
It also required additional training timeto learn the revised Worksheet # 1, so that two
full days were held in the office in training, and on the second evening a mass meeting was
held in Freedom Land to introduce the concentrated process offirst selling the erven (which
is to be followed shortly by a concerted effort to process starter solutionsfor all eligible and
interested erven owners).
The original training plan had been to begin processing Starter solutions in Onghuuo
ye Pongo duringthe same week,but that plan was delayed after the first introductory sessions
on starter solutions produced some confusion in the field work processing the erven sales
(some personnel confused the use of Worksheet # 1 - Erf Sales, and Worksheet # 2 - Starter
Solutions).
The conversations following these sessions Ied to revisions of the work load. It also
| 3.
became important to NHEto processthe sales of as many of the erven as possible before the
end of July, so that the prices would not have to be increased to account for the additional
municipal rates and fees that would accrue to the agency after that date. NHE staff were
allocated to process the Deeds of Sale, so that the OHP personnel could concentrate on the
preparatory field work required prior to the signing of the Deeds of Sale.
Except for the glitch of some confusion between use of Worksheets #s 1 and 2, the
staff quickly became competent at completing the Worksheet # I during the field sessions in
Freedom Land. It quickly became evident that the slowdown in processing the applications
was the many exceptions to the rule.
In addition, the high proportionofthe residents, especially those in the informal sector,
who did not meet the formal affordability standards of the NHE,greatly added to the time
required to process worksheets. Income was hard to identify, even though the shanty facilities
and furnishings indicated a source of support above and beyond what formally identifiable
sources documented.
In responseto this situation, and in light of the fact that Deeds of Sale for Onghuuo
ve Pongo had been signed by NHE with many residents there who were unable to document
affordability, the NHE decided to proceed with Deeds of Sale for the rest of the resettled
population who may not be able to show formal affordability at the present time on a
conditional basis. Under this decision, all those who cannot show formal affordability may
proceed with signing the Deeds of Sale, along with a "Declaration of Understanding" (copy
attached). This allows for a period to prove ability to pay over the first six months following
the sale (instead of requiring the meeting of an affordability formula).
This evolving process works to secure tenure of the people settled in the upgrading
project sites. It responds to the concerns expressed in the first quarterly report about the high |
number of occupants not able to show formalaffordability (who were threatened with removal
from the site before and without a chance to showif they had the ability to meet the
minimum repayment amounts, Le., for the erven). It also provides an alternative to the
suggestion of consideration of temporary leasing or renting the land to those not mecting the
formal affordability requirements. :
Through this "conditional" mechanism,residents are given the chance to show their
repayment abilities even though they cannot currently prove formal income sufficient to m
eet
NHE affordability standards. In cases where repayment is donein a satisfactory manner
over
the first six months after signing of the deed of sale, the resident will be considered
to have
shown affordability through informal structures; study of those informa! financing stru
ctures
may prove useful in re-evaluating NHE's formula for determining affordability to t
ake into
consideration such informal networking among lower income housing applicants.
A negative repayment performance during this "conditional" period will requ
ire a
response of either change of ownership, with the agreement of the resident, t0
someoneable
to prove affordability; or eviction from the erf by NHE.
Files and Records:
In addition to the standard green Loan File that NHEestablishes for erv
en/houscesales,
4.
e
the OHP uses afield file, called the Individual Household File and kept in a plain blue folder.
The purpose ofthis file is to provide a working, portable file that can be carried to the field.
It does not include originals of primary documents, such as Application Forms and Deeds of
Sale, and thus does not require as secure a handling and storage procedure as is rightly
required for the Loan File.
The blue Individual Household Files include a map of the community, with the
specific erf highlighted; a photocopy of the Application Form; a worksheet (loose); and a
registry of meetings, notes, etc., sheet attached to the inside left cover. New documentation,
such as copies of current payslips, will be inserted into this file, along with any other
appropriate updating data.
The Freedom Land exercise is a practical run to prepare for intense and shorter-term
efforts in the other areas to process erven sales for the entire resettled population. A variety
of glitches were identified, ranging form such things as 1/ names on the computer printout
lisis not having green Loan Files, to about a dozen unoccupied erven not listed on the
printouts (they were simply omitted, not identified as "unoccupied").
These lapses in the system are generally attributed to the new and relatively
complicated conditions ofthe resettlement/upgrading component of the OHP,such asthe large
number of people involved, and their resettlement onto the erven long before their ownership
of the erven could be arranged. In some cases, files were found once occupants were
identified; in some other cases, duplicate names confused the issues; and similar names (such
as Saltiel Philpus and Philpus Saltiel) delayed organization of files and documentation. All
this requires additional attention fromthe ficld team, andraises a number of special cases that
cannot be routinely and promptly handled.
In preparation for field work (first house to house visitations were held; later specific |
heads of household were invited to a central meeting point -- which greatly accelerated the
processing procedures), the first two parts of the Worksheet # 1 were prepared in the office.
Names, ID N®s, erven numbers and the location (community name) were entered {rom the
computer printouts; income and affordability data were entered from the "waiting list" printout
- for that area.
Field Work Experience:
The field work began with a mass meeting of Freedom Land residents on Tuesday
night (2nd June). At that meeting, the process of completing worksheets as an intermediate
step to the signing of Deeds of Sale was explained. Various questions were raised, mostly
concerning ownership and repayment responsibilities (including bond insurance). Later we
realized that people from the WASPproject in Freedom Landalso attended that meeting, and
asked questions pertinentto that project that were not relevant to the Oshatotwa program,thus
confusing the issues.
The outcome of that problem is the realization that, where there are non-Oshatotwa
residents mixed into the community, it be made clear that this process is relevant only to
Oshatotwa project participants. For example, in Arca 1, the squatters resettled to Nangolo
in
March 1993, are not part of the project, and will be dealt with separately by
NHE. Further,
those people living in Onghuuo ye Pongo have already signed their Deed
s of Sale, so
5. participation by them in the current round of erven sales discussions and interviews would
be redundant, not to say confusing.
In the following days, the teams began door-to-doorvisits to the plots, interviewing
those who happened to be available. In a two hour span, we found, we were doing only two
or three worksheets per team. The teamdecided to concentrate on evening sessions at a
central point, identifying specified households in advance and requesting them to come on
scheduled evenings. The community committee became more involvedin contacting these
people, and in identifying times when those missed by the system could be contacted. This
included a scheduling a few interviews in the mornings and at lunchtime, as well as one or
two on the weekends.
We found that more than half of the occupants had regular work (in both formal and
informal sectors), and were not available in the daytime (a few had afternoon and nightjobs),
so interview times had to be scheduled to meet their availability. Working evenings increased
the interview rate from a couple an hour (as mostof the time was spent lookingfor official
owners) to about a dozen an hour.
In analysing the worksheet process and the resulting information on affordability, we
found that only about 50% of the residents were meeting the documentable affordability
standards of NHE, whichin turn led to the decision.of NHE to introduce conditional sales (as
explained above). Many people falling into this conditional category have informal sources
of income, including from such sources as day labour, shops in their homes, and family
networks. Additionally, many of these people are single women with dependents. The
conditional sale mechanism gives all of these people a chance to prove their ability to make
repayments on schedule, and thus to establish their ownership and to secure tenure of the
erven. Even if they cannot afford to build on the erven immediately, owning the land will
make a dramatic improvement in their personal status, and in many cases may decrease their
dependence on uncertain, temporary and shifting support mechanisms.
Securing documentation, especially of the source and amount of income,proved to be
the greatest slowdownin the preparation of the worksheets, once the properresident is found.
Again, as the community's experience with the process grew, more and more people brought
the appropriate documentation with them. However, there still were a few (those needing
police certification of informal income, and those working for small businesses) who required
extra efforts to obtain the required documentation. The CDW's actually ended up telephoning
a couple employers to confirm income and to request that information in writing.
Wealso noted that, in the beginning, those with informal income werereluctant to go
to the police to get certification of their statements of income. However, as a few began to
go through the process and report back how routine it was, the other residents became less
inhibited about undertakingthis effort.
Unoccupied and Unlisted Erven:
At all sites, we know that there are a few of the project erven that are "unoccupied."
This designation was given, on the computer, to all lots for which no one completed
application form. In Freedom Land,our first round observations were that the six listed as
"unoccupied" there were indeed physically unoccupied.
Cross-referencing with the original purchase list of erven, we also found that an
additional 8 NHE-owned erven were physically unoccupied (not even Squatters) and were not
listed in any way on the two computerprintouts (the Occupant/Erf number/Size printout, and
the "Waiting List/Affordability" printout). Those are Erven N°s 1349, 1364, 1365, 1344,
1370, 1382, 1390, and 1391. Thefirst three of those were designated as part of NHE's
WASPproject, but were not used in that project.
Another there unlisted butNHE-ownederven (N®s 1403, 1442 and 1449) m ay have
squatters on them, probably straddling their boundaries. This may be confirmed more
formally, possibly as part of the peg-checking exercise.
The occupant of Erf N° 1465, which is not owned by NHE, has applied toNHEto buy
the project. He has been informed that NHE does not own that land, and cannotsell not
assist him in buying the lot, or to build on it, under the OHP.
There may be other suchirregularities; at first glance they may seem to be enough to
cause concern. However, in reflecting on the unique circumstances of the resettlement
_ process and the limited controls that were in effect, temporarily losing track of about a dozen
erven (or, to put it another way,losingtrack of the status of their occupancy),is not alarming.
However, it does indicate the need for careful follow up in Freedom Land, and to consider
such exceptions when planning and workingin other areas.
Worksheet Processing:
~The CDW'sdiscuss,in private interviews, any pertinent changes in the erf occupant's
status since completing the application, and identify any documentation that may be required
(that includes checking their ID cards against the one on theoriginal application). Sometimes
that documentation requires follow-up action by the applicant. Basic information is taken,
and questions answered. Sometimes small group discussions with the CDWs take place to
answer new or recurring issues. |
Following that session (the next morning, in the case of late afternoon and evening
sessions), the CDW's review each file and complete documentation. Those with completed
worksheets are immediately ready for processing the Deeds ofSale.
Exceptional cases wereidentified. A number of occupants of Freedom Land are
municipal employees,eligible for housing allowance subsidy from thé municipality. They are
required to produce documentation on the amount of subsidy they will receive from the
municipality before NHE can process anysale (erf and/orstarter solution) for them; ideally,
both the erf sale and starter solution will be processed at the same time. As municipal
employees have a housing subsidy, they are not eligible for the up-front subsidy on the erven.
A few cases raise confusion within the system. Applications of someare difficult to
find; irregularities in names, ID's and the numbers of applications certain individuals have
made have to be checked out in a numberofcases.
Some of these exceptional cases and irregularities cannot be processed in an timely
fashion, and a system of routine follow up needs to be observed.
lf...
~~
=
i
a
ie
e
e
o
o
)
ee
S
a
n
ao
e
a
|
||
e
i
g
:
t
w
.
P
e
5
m
l
a
S
i
e
y
e
|
O
M
i
a
OSHATOTWA PROGRAMME ~ QUARTERLY PROGRESS REPORT 2 -JUNE/93
ANNEX 2.1/c
COMPLEMENTARY INFORMATION ON
INERASTRUCTURE UPGRADING
* Standards for infrastructure upgrading
* Work programme
* Road cross section, details on construction
* Water & sewerage layout plans, details
* Press ads inviting contractors for price Competition
0
Consulting Eng
Windhoek
P.O. Box 22600
Windhoek
Laboratory:
Telephone: (061) 3-7704
Fax: (061) 3-3595 .
2 Ruhr Street
Northern Industrial Area
Kamenco Haus |
Windhoek
8 Curt von Francois Street .
Tel: (061) 6-1907
Windhoek
Our reference: 4
Your reference: Date:
OSHATOTWA
A.
DESIGN STANDARDS AND PRINCIPLES
PRINCIPLES
The design of the infrastructure to service the 616 erven in the area known as Oshatotwa departed from the
principle that the detail design would be doneto include full services to all the erveninvolved and all the
roads would be of an all weather surface standard. From here a scaling down process would take place to
accommodate the availability of funds after which the final construction drawings would be prepared.
Construction drawings for the minimum standardof gravel road acceptable tothe Municipality of Windhoek
with sewer and water reticulation serving all the erven in Oshatotwa, will be produced for tender and
construction purposes.
In this regard the Municipality of Windhoek further relaxed their minimum standards on the road cross-
section, as well as certain requirements on the sewer standards.
B.
1.1
12
1.3
DESIGN STANDARDS
Roads
Design speed:
Where possible a 60 km/h design speed was used with a general minimum of 40 km/h, but
where it was unavoidable the standard was lowered further.
Maximum grades:
A maximum grade of 12% over distances longer than 20 m has been achieved, but where
unavoidable the grade has been increased to a maximum of 15% oververy short distances.
Vertical curves:
A minimum length of vertical curve of 20 m has been achieved for the most part, but in
isolated cases a smaller length has been used close to intersections were unavoidable.
Directore: FN Marx, JM Kaber, Dr. MP Cilliers
Associates: P J Forster
90/469
Registered Professional Engineers
REG.No.9
Registered firm: ACEN
1.6
1.7
1.8
2.1
30409RF.06
K-VALUE
10
Thetypical cross-section used is a 3% cross-fall over the road and sidewalk cross-section with
no kerbs and a maximum cut slope of 5% up or down to the erf boundary for cut and fill
respectively. All cut andfill beyond the maximum cut slope of 5% musttake place outside of
the road reserve and will be 1:1.5 for cut and 1:2 for fill.
Horizontal alignment:
Although restricted by existing cadastral reserves a minimum radius on centreline of 17 m was
aimed for. However, this was reduced where the cadastral layout was such that 17 m did not
allow sufficient clearance for services between the edge of the road and thecadastral boundary
on the inside of bends.
Stormwater:
In order that stormwater run-off be accommodated with the minimum of subsurface drainage
the cross-section was reduced from the Municipal requirementto allow the flow ofwater across
the road with the minimum of longitudinal flow.
A certain amount of stormwater culvert provision is unavoidable, however, no provision is made
for catch pits or subsurface drainage.
Pavement specification:
The pavement will consist of a 100 mm imported gravel wearing course to selected layer
specifications and will extend under the side walks.
CBR: not less than 15
PI: less than 10
Compaction: not less than 93% of modified AASHTO density
Sewer reticulation:
Some relaxation on design standards was agreed to by the Municipality of Windhoek primarily
where the use of rodding eyes in place of manholes was concerned. However, manholes were
still necessary at changes of grade and direction.
Gradients:
Minimum: 1:75 but in isolated cases 1:100 can be used
Maximum: Where the gradient exceeds 1:7 the use of anchor blocks as specified in
SABS 1200 must be complied with.
2.3
2.4
2.5
2.6
2.7
3.1
3.2
3.3
30409RF.06
t}
Rodding eyes can be used in place of manholes on long straight sections an
of a line and must be placed at a maximum spacing of 50 m apart.
Sewer positions:
1 500 mm from cadastral boundary within road reserve and 1 000 mm from common erf
boundary within erven
Junctions:
All junctions with existing sewers will be at 45°.
House connections:
Where the slope of the erven permits one house connection for every two erven has been
allowed for.
Pipe diameters:
All pipes used are 100 mm diameter "Mainlight".
Water
Water demand:
The demands were based on the "Blue Book" (Guidelines for the provision of engineering
services in residential townships" Dept of Comm. Development RSA, Pretoria 1983) and apart
from dwellings, the demands from schools and businesses were also included. A peak factor
of 4,0 as recommended by the Windhoek Municipality was used. The minimum demand was
taken as 1 0002/day.
Fire protection:
For purposes offire-fighting, the area was assumed to be a low-risk category with 350¢/min
discharge per hydrant with a hydrant spacing of 240 m measured alongstreets.
Minimum pressure requirements: |
With fire, flow pressures can drop as low as 12 m. The problem with this area is thatit is at
present supplied form the Abattoir Reservoir some 6 km away, and will only at a later stage
be connected to a high-laying reservoir. Pressure readings were taken at points along the
existing main lines and readings of 30 m were obtained. As the suburb develops, this pressure
may decrease, so that low pressures may be experienced in the network initially.
30409RF.06
Computerruns, using the "Wadiso SA Version 3" programme, were done using various assumed
pressures on the existing main lines. The pipe sizes were, however, determined mostly by the
requirement that hydrants may only be placed on 90 mm diameter pipes. Some short lengths
of 63 mm diameter pipes were specified on cul-de-sacs. The pipe type to be used is uPVC
class 9 with integral push-in-type fittings. The valve spacing was determined to causethe least
discomfort to inhabitants during maintenance. As the valves are expensive, the number may
be reduced to keep to the budget. The valve type specified is a resilient seal type gate valves.
Contract document
The Project Documentfor this contract is based on the General Conditions of Contract 1990
approved by the South African Institute of Civil Engineers and The Standardized Specifications
for Civil Engineering Construction (SABS 1200) issued by the South African Bureau of
Standards.
The above documents are generally used and approved in Namibia for the construction of
township services.
Contract Phases
In order to have serviced stands available in the shortest possible time, it was decided to put
the total work out in two contracts of some 300 erven per contract. A contract ofthis
magnitude has further proved to attract the widest range of possible tenderers.
Each contract has again been divided into two design phases. Thefirst being completed before
tendersare called, while the second design phaseis during the tender process.
The above construction procedure is best explained in the attached programme.
Tender
The normal tender procedure was followed, however the advertisement was placed early, giving
the tenderers a preliminary period in which to gather information before the actual tender date
and the tender period has been shortened from the normal period allowed to hasten
construction.
Advertisements were placed in two newspapers, namely The Advertiser and Republikein on
7 and 9 July 1993, as well as the Namibian Tender Bulletin on 9 July 1993 and copies of the
advertisements are attached.
All specifications will be in accordance with the standards laid down by SABS 1200.
<®
B
M
K
G S
W>
y
y
.
)
]
)
Y
L
a
yWy
y
W
M
LV
U
M
S
S
y
p
)
SO
NT
AV
YO
#9
15
30
CONTRACT 2 tes Given
CONTRACT 32
S
B
B
r
,
+
G
o
M
(278 ERYEN
t
o
u
|
te
ms
so
me
co
co
co
mm
e
t
o
l
e
s
M
N
6
3
,
V
W
M
L
O
L
V
H
S
O
-
S
W
W
V
Y
9
0
U
d
4
,
"
e
C
m
e
of
.
.
e
o
a
°
o
f
F
u
U
T
A
c
e
:
U
P
G
L
A
D
A
d
G
.
C
S
U
R
F
A
C
E
D
)
,
| com
L
.
:
|
R
O
A
D
R
e
s
e
r
v
e
"C
RO
SS
S
E
C
T
I
O
N
.
_.
-.
._
_.
-
F
U
T
U
R
E
C
R
O
S
S
S
E
C
T
I
O
N
F
o
k
T
H
E
P
R
E
S
E
N
T
G
C
A
V
E
L
o
n
d
T
H
E
f
o
r
d
F
O
L
M
A
T
I
O
N
!
S
t
r
a
t
e
B
E
F
e
a
2
@
M
E
D
A
n
D
A
L
N
E
A
Z
I
N
G
C
o
n
e
R
S
E
C
o
w
I
S
T
Z
U
C
T
E
D
T
o
T
H
E
F
I
N
A
L
U
P
G
R
A
D
E
D
K
A
D
C
E
v
E
¢
:
D
e
A
I
N
A
G
E
R
E
Q
u
U
I
e
C
E
M
E
N
T
S
S
H
C
B
E
I
N
S
T
A
L
L
E
D
F
o
r
T
H
E
G
R
A
L
E
L
K
C
A
D
T
O
C
o
m
N
T
H
T
H
E
F
U
R
A
L
R
E
Q
U
I
R
E
M
E
T
I
T
S
F
o
r
A
S
U
R
F
A
C
E
D
L
A
D
(.
C.
C
o
r
l
v
e
e
A
N
I
D
:
(
I
N
C
O
B
D
S
C
A
T
C
T
P
I
T
S
P
A
L
T
(
R
I
U
I
G
S
/
T
H
E
L
A
T
I
E
V
E
S
H
A
L
E
B
E
I
C
E
P
T
J
o
A
S
U
N
I
L
ERF 2330
ERF 2329
ERF 2329 | 1
AS5.5_
-
-
£
5
0
,
0
0
f
£
9
0
;
0
0
s
rr
END K&C
CH 170.00
ERF 2329
STANDARD
CATCHPIT
¢ CH 151.3
STONE PITCHEDKID 3!
INLET--7 > J
START K&C L j
~CH 430.00 SY /=
qT
3.5m SIDEWALK gS lvence FR idZmLK | ?
1 E ©,-180,0
0
.
|
¢ ROAD
3
CH
10
8.
38
3
ROAD 4
2.75m CARRIAGEWAYPp400,00 p--2;758_CAGRTAGEWAY _448,00.
2.75m CARRIAGEWAY pf
4
C
H
5
2
.
1
3
4
KERB & CHANNEL B 5.5
WITH 4.2m SIDE WALK
A 5.5
«
*
6
G
e
t
m
&
C
i
m
a
e
x
q
o
m
a
s
e
e
s
o
n
l
°
.
e
f
t
a
s
KERB & CHANNEL
WITH 2.0m SIDEWALKROAD 3] A 8
oD
4
ERF 2329
10.5
th
; |
3. 5m SIDEWALK & verce| RM47 \\
RESERVE
ERF 2345
@ CH
600mm PIPE CULVERT e@ go°
150. 00
IL=41644, 84
OL=1643.413
L #16. 80m
ROAD 4. cCoO-ORDINATE
POINT Y
START -6228. 258
BCi -6089. 97,
-8073.141
VWL NAMIBIA INC.P.O. BOX 22600WINDHOEK9000Tel. (O61) 37704Fax. (O6/) 33595 TOWNSHIP DEVELOPMENT: OKURYANGAVA EXT. 5 OSHATOTWA: PHASE |: GENERAL LAYOUT PLAN: ROADS EXTRACT FROM PLANI56926 / RD / Ol
. a oR tate pe ty ts ar toe ao}: Menshengehace paneee
eesereneeteYemen ae ae aOECTA * FES pete ae . * agn 8 memy et mk ng eyi a EE a Hn cae Neg :
COAAdyceLONICROEROaaiate
tpl nat
3s pe vejae oe
ee seandi ietae wer ath Stinnett sie aren
. Be ER ET oe
PO GPS ey
+
W
G
Z
'
e
3
9
0
3
L
H
O
T
187
A
N
T
I
S
Y
L
N
3
9
u
gZ
*2
39
03
15
34
TA
Ad
1
GN
NO
WS
C
i
M
O
m
M
a
n
(a
)
52.320 5e.mw
J
O
V
N
I
V
H
O
0. 00
WA
LN
OZ
IY
OH
J
O
V
Y
S
_
J
A
Y
N
D
W
O
T
L
Y
S
A
0
E
v
9
t
0
°
p
r
S
t
LONGITUDINAL SECTION
0
9
b9
t
0
°
2
9
0
°B
b9
F
Br
ot
0
OS
IF
C
O
D
G
)
G
D
f
e
m
n
d
©
6
0
G
o
r
e
(
>
a
o
G
u
m
©
a
m
a
m
e
e
m
a
D
c
a
o
52,
52. 145 Ne.eee Be. 299 Be. 3. 80
51.639-51.719 51. 659 15. 00
pi. 475 p1.255 6i. .c/0 20. 00
49. 390 49.472 49.555 (49.
49. 028 49.440 49.493 lao.
48. 190 48.272 (48.355 |48. 851 60. 00
47. 47,533 147.6 f=te Oo 47. pt | Ca) B0.00 |
431
"
bG
*
S
c
t
B
E
=
4
G
b
S
6
ah
ve
:
| I T
ONGAVA STREET
LEFT EQGE
¢ EXISTING 250mm g CH 3. 80m
WATER MAIN: CH 9. 40
1
S
3
Y
9
oo
ps
,
e
h
%
Z
9
3
0
O
t
v
S
06
4
8
Y
09
%
G
O
6
G
*
E
-
by
a
39
03
H
O
Y
3
9
0
4
1
4
5
7
c
O
A
M
o
o
n
c
o
a
l
B
e
e
n
S
e
e
9
V
S
xE- xE+
meeComeCaEBSUEDGHD
HA
ND
C
H
A
I
,
f
I
|
98
h
B
OT
H
O
L
A3
U1
S
VA
VO
NO
J
VWL NAMIBIA INC.P.O. BOX 22600WINDHOEK9000Tel. (O61) 37704Fox. (06/) 33595 TOWNSHIP DEVELOPMENT: OKURYANGAVA EXT. 5 OSHATOTWA: PHASE |: LAYOUT AND LONGSECTION PLAN EXTRACT FROM PLANI56926 /.RD / O02
PPE,
we:Ok
eneroaeLEEALESAIEEEERESEATEEA
c4VWL NAMIBIA INC. /P.0. BOX 22600 TOWNSHIP DEVELOPMENT: OKURYANGAVA EXT. 5WINDHOEK9000Tel. (O06) 37704Fox. (O61) 33595 OSHATOTWA: PHASE |: GENERAL LAYOUT PLAN: SEWER EXTRACT FROM PLANI56926 / SD / Ol
NI
as
wtinttintenenteanAEROEASit
[on
27 2 28 2 & 8 & & & & BS S Be we we we we nwRE 1.45 46.85 147.95 l4g. oo S i e S ns 6 S a a S é é 3 : Q 3 g :
32h : ° : : | : \\
n. ;
\\
= | J a
ra WLP le B a ¢ | a ¢m 6M Tee] os . } |: 1ox] ° oem
:
j / J
j _f.
fMH 1.45 144.12 (45.22 kessz
/32 | 144,05
/ns .| >
|= wf} Plo] so ==
© "lBlalaloe
ox}
3
rH
MH 4.45 |42.60 143.70 |43. 75
:3ec 42.54
1s
a ) o a >a pays o He
PP
&
~~
oOMH 7 1.45 89.64 |40.74 l40.7¢9 Vi
dea 39.54 Va Lf: 4) +A \\ ale |oe
J /)@ On oO oD -s
J o*oO Q) & bod
or
re A {eo
fMH of 3.10 84.76 68.81 bs. B84 VY fo CONNECT TO32
| EXISTING 4502 LINEEXISTING
9
&
"a 2 @ ® &@ © &8 & & & & & & & $ $ &$ S & & &RE 2.70 144.70 147. 35 l47. 40 © S = i s a a N ce = S - B wo os & 2 g :
32b
a : |Vj yo
in
a | _lz x OPE" yIE]S/2lzs Va | 4S9 ape re He / |
fo " / x
.
L-* :
|
RE oe 1.30 |42. 03 l43. 28 143. 39 | a
|32d 5 . fv +
Li |
oS PP .
!
; VWL NAMIBIA INC.
,P.0,B0x22600 TOWNSHIP DEVELOPMENT: OKURYANGAVA EXT. 5 | EXTRACT FROM PLAN
9000 |
I56926 / SD / O02Tet (060 37704 OSHATOTWA: PHASE |: SEWER RETICULATION LONGSECTION
\\
FeePUBL) KEIN
Tender documents areavailable
TENDER NOTICE
NATIONALBUILDING AND INVESTMENT
CORPORATION OF NAMBIIA
TRADING AS NATIONAL HOUSING
ENTERPRISE (NHE)
Construction of Gravel Roads, Stormwater
Structures, Water Network and Sewer
Reticulation in Oshatotwo Phase 1
Okuryangavea Ext. 5
Project Code: 156926
Tendets dre herewith invited from, qualified con-
tractors for the construction of cil services Nn
Okuryangava, Windhoek. 3 Tee
VWL Namibia Inc. 8, Curt von Francois Street,
Windhoek from 16 July 1993 and only, against:
paymentof a non-refundable deposit of-R200,00.°
Sealed tenders with the Tenderers nome and -
address and the endorsement Project Code
156926 must reach the offices of VWL Namibia inc.
not tater than 12n00 on Wednesday 28 July 1993
A meeting with the tenderers wil be held on
Thursday, 22 July 1993 at 10n00 at the offices of
VWL Namibia Incl., to discuss the tender docu-
ments and visit the site
Since the tender period is imited, tenderers are
welcome to contact VWL NamibInc. as from
this date, to collect Information regarding mate-
tlal to be used, road cross section, construction
crea, sic .
The lowes? or any tender may no? necessarily be
eccepted and the Corporation reserves the right
to accept any tender
PREPARED BY:
VWL Namibia Inc.
P © Box 22600
Windhoek
Namibia
Tel. (061) 37704
1e93/7/7
ff
atthe offices of
759 Jury 1998
DING AND INVESTMENT CORPORATION OF NA3ASNATIONAL HOUSING ENTERPRISE (NHE)
MIBIA
CONSTRUCTION OF GRAVEL ROADS, STORMWATER STRUCTURES.
WATER NETWORK AND SEWER RETICULATION IN OSHATOTWO
PHASE 1, OKURVANGAVA EXT 5 - :
Tenders are herewith invited from qualified contractors for the construction ofcivil
services in Okuryangava, Windhgoek. .
Tender documents are available at the offices of VWL Namibia Inc. 8 Curt von
Francois Street, Windhoek from 16 July 1993 and only against paymentof a non-
refundable deposit of R200.00.
Sealed tenders with the Tenderers name and address and the endorsement Projject
Code 156926 must reach the offices of VWL Namibia Inc. not later than 12h00 on
Wednesday, 28 July 1993,
A meeting with the tenderers will be held on Thursday, 22 July 1993 at 10h00 at the |
offices of VWL Namibia Inc.,'to discuss the tender documents andvisit the site.
Since the tenderperiodis limited, tenderers are welcome to contact VWL Namibla
Inc. as from this date, to collect information regarding materialto be used, roadcress
section, construction area, etc.
The lowest or any tender may not necessarily be accepted and the Corporation
reservesthe right to accept any tender. °
PREPARED BY:
VWL NAMIBIA INC,
P O Box 22600
WINDHOEK
NAMIBIA
TEL : 061) 37704
The Avvekfisek- FF4 Jay 1993
%
|
|
Pti
D
y
(
|
|
OSHATOTWA PROGRAMME - QUARTERLY PROGRESS REPORT 2 -JUNE/93
ANNEX 2.1/a
SUBMISSION TO NHE' s
MANAGEMENT COMMITTEE ON LEVEL,
OF INFRASTRUCTURE UPGRADING
* Proposed level of infrastructure upgrading in Inception
Report
* Letter from Municipality on financing materials for
Sewerage and water lines in upgrading areas.
* VWL cost estimates for improvement of infrastructures
SUBMISSION TO MANAGEMENT
FROM: Oshatotwa Project Coordinator; SUM~McNamara Cons
.
DATE: July 5, 1993
SUBJECT: Definition of level of infrastructure e
xtension
for the Upgrading Areas (Okuryangava)
up qu enn wnt cam uty anti Going GoD CUED eng
cnS GUD GONG GONND Gnay eRO Gan Gum aoe CUMS Wn
GEE GAD mm emp quae cuond SEED qm Gis: clap eaxy
Goad Guly cane Say
INTRODUCTION:
Ol Discussion has been ongoing within the Project
Team
regarding the level of water and sewerage services to be
provided for the upgrading areas. Alternatives
under
consideration are:
a) Increasing the present level of communal
services, or
b) Providing full water and sewerage reticulation
for the areas.
02 When all aspects of the question are considered, the
re
are pros and cons to any of them. It is a difficult
decision that has policy consequences for other N
HE's
programmes, and the Project Team deemed it important
to
submit the matter to NHE's Management Committee for a
final
resolution. This memo attempts to provide some back
ground |
information and to evaluate implications of the alterna
tive
options under consideration.
PROPOSAL
AFTER CONSIDERING ALL POSSIBILITIES AND FINANCIA
L
IMPLICATIONS FOR NHE AND THE CLIENTS, THE PROJE
CT TEAM
HEREBY PROPOSES THAT THE MANAGEMENT COMMITTEE CO
NSIDER
ADOPTING ALTERNATIVE B) AS THE BEST OPTION BOTH F
OR THE
CORPORATION AND THE BENEFICIARIES OF THE PROJECT
BACKGROUND:
Land purchased for the Project
O4 For the purpose of relocating the Single
Quarters
Squatters, NHE bought 388.733 m2 of land from
the
Municipality in the Okuryangava and Goreangab are
as; total
amount paid was Rs 4.982.935.04. In total, some 1009 pl
ots
resulted, with an average land cost per erf of
Rs.4.940.
Land cost for the Goreangab and Freedom Land a
reas (367
plots) included development by Municipality; the
rest (642
plots) was purchased as Block land to be developed
at NHE's
cost.
O05 The 61 erven in the Onguo Ye Pongo area were sold last
year by NHE at the price of Rs.3000. For the remain
ing
plots, NHE established a selling price of Rs. 6100 in t
he
serviced areas and of Rs.5650 for all other. Besides co
st
of land, this price includes Rs 550.948 spent by
NHE- for
interim rates and taxes accrued from 01/02 to 31/07/93,
community facilities provided and some Rs.300/plot towards
repayment of future infrastructure upgrading. The process
of selling the erven to the settlers is now well under way.
Inception Report proposal
06 In the socio-economic survey undertaken during the
Inception Phase, improvement of water Supply, Sanitation
and the provision of street lights were among the highest
priorities mentioned by the settlers. In response to these
needs, the Program presented last December by NHE to KfWw
Proposed an increase in the level of services by adding
communal toilets, stand pipes and street lights. An amount
of Rs. 832.000 was budgeted for this purpose, out of which
422.000 was for improvement of water Supply and communal
toilets. Annex 1 gives some details of the proposal.
Developments during first months of implementation
O7 During the first quarter of implementation the budget
for this component was adjusted, bringing it to Rs.
1.057.000 as a result of:
- Savings of some Rs.175.000 compared with the
estimated cost of street lights:
- Additional costs of some Rs.400.000 to comply with
the Municipality's request to develop internal
Streets in several areas.
08 The lay-outs of the areas are not designed for
communal services. Existing communal services are located
in individual plots. As there is little if any communal
Space available for the additional toilet facilities
required, the Project Team discussed with the communities
the possibility of building a combination of toilet and
Shower/washing facilities on private erven. The owners
would be responsible for maintenance and water/sewerage
rates; they could collect usage fees to cover their costs.
This appeared to be a novel approach in Windhoek, and the
communities received the idea cautiously. The possibility
of a joint NHE/Municipality effort to develop complete
reticulation networks in the areas was also raised at this
time.
10 At the end of April, NHE appointed VWL Namibia Inc. as
consulting engineers for the design of infrastructure
upgrading in the resettlement areas. Although minimum
Gdevelopment standards were envisaged for the initial phase,
NHE instructed the engineers to design the roads and the
water and sewerage networks for final development standards
used in Windhoek: tarred roads and full water and sewerage
reticulation.
New element:
11 At the end of May, in response to a request from NHE,
the Municipal Council decided to reimburse NHE the costs of
materials required for the extension and upgrading of the
water and sewer reticulations. In a letter dated June 3,
the City Engineer informed NHE about the Council's
resolution. Copies of these Municipal resolutions are
attached as Annex 2.
12 This new element opened the discussion within the
Project Team on the feasibility and convenience of
developing full water and sewerage reticulation instead of
the limited upgrading initially envisaged. The consulting
engineers were then requested to prepare cost estimates for
this infrastructures and of materials to be reimbursed on
the basis of the more accurate engineering designs already
prepared for some of the areas. VWL estimates are attached
as Annex 3.
EVALUATION OF ALTERNATIVES
Costs, funding and cost recovery
13 As mentioned, cost for alternative a) was estimated at
Rs. 422.000 at the time of the Inception Report. No recent
revision of the original estimate is available; an 8%
escalation increase may be assumed, total costs would then
be some Rs. 456.000. Along with other community oriented
expenditures (street lights, community centers etc) this
cost was envisaged as a subsidy to be financed out of KfW
grant (except for GST to be paid by NHE).
14 According to the attached VWL estimates, cost of full
water and sewerage reticulation would be in the order of
Rs. 1.358.000. The Municipality would reimburse NHE an
estimated Rs 363.000, leaving Rs. 995.000 to be financed by
the Programme, or an additional Rs.573.000 over funds
already committed.
15 This amount would also be funded out of KfW funds
through budget adjustments. As the Municipality is
reimbursing the costs of materials, the amount of GST to be
financed by NHE is likely to be reduced. Possible budget
transfer to upgrade infrastructures might come from:
- Interest earned in the past quarter by the
Programme's Disposition Fund deposited in the
Commercial Bank, an amount of approximately Rs 50.000
could be applied for this purpose.
- KfW's contribution to this budget post will be
increased by some Rs.55.000 as the exchange rate has
gone from Rs 1,8 to Rs 1,9/DM;
- The amount budgeted for building material loans
(1000 at Rs.4000 each) was over estimated at the
Inception Phase and will have to be reduced. Part of
these funds could be applied to finance this
component.
BUDGET FOR EXTENSION OF INFRASTRUCTURES
As adjusted April 93-(Rs x 1000)
TOTAL COST KEW NHE MPLTY. BENEF.,
Total for Infr.Ext. 1057 988 57 0 12
Corresponding to
Water&Sewerage 422 399 23 0 =
FINANCIAL IMPLICATIONS (Rs x 1000)
ALT. A AGAINST BGT. ALT. B AGAINST BDGT.
COST ESTIMATE RS 456 +34 71.358 | + 936
FINANCING KfW 328 - 70 978 + 579
MPLTY. 122 +122 363 + 363
NHE 6 - 18 17 ~ 6
16 Execution of alternative b) could require a revision
of the established land selling prices, a decision that
could create inconveniences because they have already been
announced and the first deeds of sale have been signed. If
the additional cost of Rs.840 would have to be fully
recovered from land selling price, monthly installments
would increase by Rs.13 and affordability would slightly
diminish.
17 Alternatively, the additional expenditures could be
considered as an increased subsidy to the settlers, using
the criteria proposed in the Inception Report.
18 Costs could also be recovered in a long term basis
through the usual system used by the Municipality. To
recover capital investment in new townships, the
Municipality divides the costs in "non-remunerative
services" (storm-water, roads, survey etc.) and
"remunerative services" (water, sewerage, electricity etc).
In the case of. remunerative services, the Council provides
the network and the overhead bulk facilities at no direct
cost to a purchaser. The financing is recovered out of a
basic charge added to the consumer's account.
19 Implementing this system for recovering capital costs
of infrastructures would require to reach an agreement
Between NHE and the Municipality to share revenues from the
basic charge. This question need to be addressed with a
broader perspective, as similar problems will arise for the
core-house ccmponent of the programme and for any future
programmes where land development is executed and financed
by NHE, a scenario proposed in NHE's Strategic Plan of May
1993 (point 3.2.2).
20 It is to be pointed out that even if such an
arrangement is concluded with the Municipality, a certain
amount of subsidy will be included, as the percentage of
households taking up individual connections will likely
remain below 50% during the first years. Basic charges
could possibly not be levied from most other households
without increasing their affordability problem.
Opportunit
21 When purchasing the land NHE assumed the
responsibility for its development, but the Municipality
has decided to participate in the cost and has assigned
funds for the purpose. Altérnative b) will benefit more
than alternative a) from the offer, as it is not clear if
in future fiscal years the Municipality will be prepared to
maintain it.
22 As stated, the area was planned for full reticulation.
If the work is not done now with available KfW and
Municipal funds, NHE will face in the future prohibitive
costs and probably cause lots of disruption to existing
structures.
Fquity considerations
23 If implemented, alternative a) will create "de facto" .
inequities. As some water and sewerage lines will need to
be extended to serve the new communal facilities, some
families will have the possibility of individual water and
sewerage connections, while some other will only have the
option of communal facilities, regardless of individual
priorities and possibilities. With alternative b) all
families will be in the same situation.
24 On the other hand, alternative b) might increase the
burden of poorer families not able to pay connection fees.
If basic charges are levied from everybody, they will in
fact be subsidizing those using the services.
Implementation problems and staff workload
25 Additional communal facilities envisaged in
alternative a) will be located on technical criteria in
order to distribute evenly the possibility of access to
them. Once potential locations are defined, agreement to
build facility will have to be negotiated with a plot
owner in the area (see 08 above). This is feasible but a
lengthy task that will place an additional burden in the
shoulders of CDWs and will delay execution considerably.
26 Alternative b), by opening up the option of individual
hook-ups to water and sewerage, will increase the number of
starter solutions options, like the possibility of
developing bathrooms or kitchens, not available at present.
This will increase the SHCA's task. The following table
summarizes the evaluation:
CRITERIA ALTERNATIVE A ALTERNATIVE B
FINANCIAL
Need for budget revision
Maximum use of Munic.cooperation
Total cost
Adjustment to existing layout
Space requirements
Staff work load
Timely implementation
Usage of scarce water
SOCIO-ECONOMIC
Response to identified priorities
User satisfaction now
Options for future developt.
Comm.facility as private business
Affordability
Equity
Conflicts within community
Ll
+t
+
|
l
t
bt
+
lb
bt
b
e
+
e
o
Chris Steenkamp
Oshatotwa Programme Coordinator
Annexures: Mentioned
+5
EMENT AREA
Standards and cost estimat s proposed
in the
Inception Report; December 1992
x One stand-pipe every 25 plots
x Communal toilet block no more than 100 mt
s away
from every plot; maximum of 100 families
using block.
x Sewers extended for new toilets only;
* Water lines extended to serve pubic stan
dpipes
only;
e Street lights every 40 meters on wooden poles.
SETTLEMENT Comunal Stand 63 mm 100mm
Streetlights
Toilet Pipe water sewer ml number
Onheleiwa 2 2 50 m 210 m
1300 33
Onyeka 1 1 30 m 10 m
500 13
Nangolo 3 5° 400 m 200
m 820 21
Ondunduluka es 1 15 m es
40 2
Joseph Nepando 2 5 240 m 230 m
1070 27
Epandulu 1 1 15 m 30 m
250 7
Freedom Land = = = =
1410. 36
Onghuuo Yepongo = 3 200 m =
410 11
Shipena 2 2 50 m 130 m
440 11
Grwell. Matongo 9 = - =
1730 4 &
Unit total 20 20 1000 m 810 m
7970 205
Unit price Rs 7000 1000 100 200 =
2000
TOTAL COST Rs 140000 20000 100000 162000
- 410000
eeeeeweeeeeee
eeeOOeREE
SSOSSSSSSSS
SSSSSSSSee
e
Total costs of improvements: Rs. 832.000
Pw
re
0
80 Independence Avenue
City Engineers Departm
je,_, ,
. STRreeneects cececanemn_
©
Eng: H I Peters Ref: |/okuryangava/Bxt 4&5 F Py
Tel: 391-2345 ras
| Ij ! a Aeweewe, eres
National Housing Enterprise : lol? -25- 74 | 1993 6,
PO Box 20192 J woreee Ce |
boyy *
WINDHOEK SSLede _|abias pyr
Sir
OKURYANGAVA EXTENSIONS 4 AND 5: UPGRADING OF INFRASTRUCTURE
I refer to your letter dated 24 March 1993.
At its meeting held on 1992-05-03 the Management Committee of my Council passed
the following resolution:
"1. That the City Engineer be authorized to reimburse the developer (NHE) for
the materials required for the extension and upgrading of the water and
sewer reticulations, subject to the conditions as laid down by the KfW.
2. That the developer provide the City Engineer with three quotations for the
materials required.
3. That the City Engineer be authorized to pay the developer the funds for
the chosen quotation plus-10 % for escalation to prevent higher than
expected costs in the event that the project take much longer than
anticipated.
4, That the developer bear the remaining network costs of services, water and
sewerage, which will include all planning, design, construction and
supervision costs.
5. That the planning and design of the water and sewerage reticulation
networks be done by professional engineers, according to municipal
specifications.
6. That the design of the water and sewerage reticulation networks be done on
a CAD system adaptable to the system used by the Municipality and that the
information be made available to the City Engineer.
7. That the plans for the networks be submitted to the City Engineer for
approval.
8. That the construction of the reticulation networks be supervised by a
professional engineer to the satisfaction of the City Engineer.
9. That the people participating in the project be informed that construction
and individual water connection costs will be lower if the community does
the required excavations.
10. That trench excavations and initial backfill be inspected by the City
- Engineer before the backfilling of trenches can commence."
Please be informed that structured wall uPVC sewer pipes must be used i.e.
"Mainlite" or equivalent.
I trust that you would find the above to be in order.
Yours faithfully
Nt
CITYCENGINEER
/mpe
Windhoek
P,Q, Box 22600
Telephone (061) 3-704 re
o
on : °
: 2 Ruhr S
treet
Fax: (061) 3329
Narther Industrial Area
Kamenco Haus
Windhoek
8 Cur von Francois Street |
Tal: (061) 6-1S07
Windhoek
Your relerenés: Date:
FAXNO: 22.2. sel y PAGE:«OF:
©Box2018 ATTENTION OFESSZS AIALTION Gf CISD |
FROM: Gea) LAREE pre Z224i16)958
comeany: YAEL Alaminia Inc |
FAXNO:_ SSS7S5 Post-itNotestrom 3h
oo soe
Sm
OSHATOTWA : CIVIL SERVICES : COST ESTRVATE
Our letter dated 21 June 1993 and subseqnent discussions at our offices on 21/06/93, refers,
We have now completed the analyses and design for the water network, serving each stand with domestic
water, The existing pipe network to which the new network is connected, has ample capacity, with the result
that smaller diameter water pipes are now required than initially anticipated. The subsequent saving 1s
indicated below. |
Mainlite sewer pipes is a new product entering the market with very commpetitive prices. These prices can
~ not be quarenteed for longer periods andwe have taken this into accountm the imitial sewer estimate. Since
the Mumicipality stands in for the material bill, the sewer cost estimate is revised to include the very
competive prices.
L REVISED COGT ESTIAIATe
11 Gravel Roads R 360 000-00
12 Water network R 470 000-00
13 Sewer reticnlation R 72a 000-00
14 Establishment | R_ 140 000-00
TOTAL COST ESTIMATE R1 750 000-00 R1_75
0 000-00
An estimate for material cost, to be remmbursed by the Municipality, is given below. These c
osts are based
on thepurchase price over the counter and do not meinds transport, storage, handling and inst
allation costs
which are normally imclnded in tendered rates for material, Ths counter purchase price is
approximately
half of the tendered price.
Dlreeclorea: FN Marz, Jf Kaber, Or, MP Ciliers
.
Associsten; P J Forster
REG. No. 90/489
Regisured Professional Engmeer
Registered tin ACEN
2.1 Gravel Roads "
According to the letter fromthe
Municipality dated| 3/6/93 - nome
PLUS 10 % according to Mumicipal letter for
escalation R33 000-00
TOTALCOST OF RETMBURSABLE
MATERIAL R 363 000-00 R_ 363 000-00
In your letter dated 21 Sums 1993 it is stated that R797 000-00 is available for this project which leaves a
shart fall of R590 000-00.
We trust that you ind above information in order.
__Yoursfaithfully
- J M KABER Pr Eng
VWL NAMIBIA INC,
30409.05JKms
'
i
a
E
a
t
e
,
E
T
n
on
e
a
t
e
n
p
a
s
ta
e
L
l
!
OSHATOTWA PROGRAMME ~- QUARTERLY PROGRESS REPORT 2 -JUNE/93
ANNEX 2.2/fa
MUNICIPAL COUNCII' Ss MARCHE
RESOLUTION ON SALE OF LAND
FOR CORE-HOUVUSE PROTECTS
DEPARTMENT OF
PROPERTIES AND
PROTECTIVE SERVICES
ENQUIRIES: MR D L JOUBERT
REFERENCE: 3,741 /oKU
The Managing Director
National Housing Enterprise
- April 1993
PROPERTIES (KATUTURA)
P.0. BOX 2085
WINDHOEK 9000
TELEPHONE 63171
POs to ROTEPMO sees eon ee ot
PO Box 20192
ceed
WINDHOEK
NAMIBIA
ATTENTION
Dear Sir
MR C J STEENKAMP
SPECIAL PROJECTS
SALE OF ERF 41, OKURYANGAVA PROPER
; LOW-INCOME HOUSING
PROJECT K FW
I refer to your application under re
ference 159921 dated 11
December 1992 regarding the above
. The City Council of
Windhoek on its meeting held on 31 M
arch 1993 considered your
application and it was resolved :
"4, That Erf 41, Okuryangava Proper, in
extent 25
794/m2 be sold to the National Housing
Enterprise
or their nominee at an upset price o
f R11,37/m*
subject to the following conditions
That Erf 41, Okuryangava Proper
be rezoned from.
"undetermined" to residential.
That consent be granted to use E
rf 41, Okuryangava
Proper for residential purposes unti
l the rezoning
is approved by Cabinet.
That consent be granted to erec
t more than one
dwelling on Erf 41, Okuryangava Prope
r which number
of dwelling units or houses will
be determined by
the proposed density zoning of the erf.
Zfaces
1.5
1.10.1
1.10.2
1.10.3
That the proposed use of Erf 41, Okuryangava Proper
for residential purposes be advertised in terms of
Clause 20 of the Town Planning Scheme, at the costs
of National Housing Enterprise.
That the National Housing Enterprise consult
personally with the City Electrical Engineer to
discuss the necessary electricity supply
alternatives for the development and the costs
involved.
That the National Housing Enterprise submit
electrical plans of the development for the
planning of telephone services and lines to TELECOM
Namibia.
That no access may be taken from Ekundi Street.
That all the costs for the provision of roads and
stormwater and internal water and service network
be borne by the National Housing Enterprise.
That the National Housing Enterprise familiarise
themselves with the stormwater on the erf as well
as the portion at the north eastern corner of Erf .
41, Okuryangava Proper which cannot be connected to |
the existing sewer line.
That, should the National Housing Enterprise wish
to subdivide the erf, the subdivision application
be referred to Town Planning for more detail
comments and conditions in respect of services and
Town Planning aspects and in particular:
That the detail design of the surfacing on the
streets and the detail of the stormwater drainage
systems be done according to the City Engineers
requirements and approved before any work is.
started.
That the design and construction of ail civil work
be done under the supervision of a professional
engineer to the satisfaction of the City Engineer. .
That the tarring and surfacing of the roads only be.
done once 75 % of the erven have been developed and
the written approval of the City Engineer has been
obtained.
S/eesee
1.10.4
1.10.7
1.10.8
1.10.9
That the design of the roads and stormwater systems
be done on a CAD system adaptable to the system
used by the Municipality and the information
be
made available to the Municipality.
That the streets be constructed and stormwater
drainage system be installed at the cost of the
National Housing Enterprise to the satisfacti
on of
the City Engineer.
That the National Housing Enterprise be responsible
for the maintenance on the street and stormwater
systems for a
_
period of twelve months) after
completion and take-over of the works by
the
Municipality. [A deposit of 5 % of the value of
the works must be paid to the Municipality. ]
That street lights be installed at the Nat
ional
Housing Enterprises costs and to the satisfaction
of the City Engineer.
That the National Housing Enterprise take note
that, should they continue with the subdivisio
n of
Erf 41, Okuryangava Proper, municipal approv
al
first be obtained and, in the event of any o
f the
new erven being alienated, except for streets or
public places reserved for municipal purposes whi
ch
shall be transferred free of compensat
ion, .
subdivisional costs and transfer fees to th
e
Municipality, an endowment, calculated as
a
percentage, 7.5 %, of the land value of the firs
t
10 erven and 1 % of the value of additional erven
created by the subdivision, being ali
enated,
excluding a remainder, be paid to the Municipa
lity
in accordance with the stipulations of sec
tion 19
of the Township and Division of Land Or
donnance
Number 11 of 1963.
That the National Housing Enterprise take note
that.
the new erven may only be sold after con
firmation
that the conditions as stipulated in p
aragraphs
1.10.1 to 1.10.7, have been met.
That approval in terms of section 30(1)(t) of
Act.
23 of 1992 be obtained from the Ministry
of Local
Government and Housing.
9 ee
% XX
1.12 That the purchase price of R293 277,78 be paid in.
cash and the Deed of Sale be signed within thirty >
(30) days after being requested to do so by the
Property Manager (Northern Areas).
Resolution
That Council
rescinded.
Council Resolution Number 89/03/93."
You are kindly requested to indicate in writing if the
conditions as set out in Councils Resolution Number 89/03/93
are acceptable to National Housing Enterprise in order to
enable me to apply for Governmental approval in terms of 1.11
of the said Resolution.
You are further requested to advertise the proposed use of Erf
41, Okuryangava in terms of Clause 20 of the Town Planning
Scheme of Windhoek, a copy of which is attached hereto for.
your information, whereafter proof must be given to this
office that no objections have been received before the Deed
of Sale may be finalised.
Your co-operation will be appreciated.
Yours faithfully
PROPERTY MANAGER : NORTHERN AREAS
DEPARTMENT OF PROPERTIES AND PROTECTIVE SERVICES
DLJ/gdg
OKU41.DLJ
Advertisement 20. (a) Unless otherwis
e determined by the
and appeal in Council,
any person making application
certain cases: . for conse
nt to erect or use a building,
or for the use of land in zones
I, If,
III, VI, and XI for any purpos
e
requiring the Council's consent,
shall
at his own expense:
Publish once a week for two
consecutive weeks a notice of his
intention to make such application in
an English, Afrikaans and German
newspaper circulating in the Local
Authority Area. The notice shall state
° that any person having objections
to
the erection and/or use of the
proposed building, or to the proposed
of use of land,
may lodge such objections
. together with
the grounds thereof with
the Council and with the applicant, in
writing, Withing fourteen (14) days of
the date of the last advertisement and
shall further state where the plans
if any, may be inspected. ,
(ii) Post a notice, foc a period of
Fourteen (14) days in English,
Afrikaans and German, setting out the
particulars as in (i) above, in a
conspicious position in the Municipal
' Offices and on the erf concerned. The
notice to be posted on the erf shall
be of a size not less than 600 mm x
450 mm and no letter thereon shall be
less than 5 mm in height.
(b) On submitting an application in terms
of this clause the applicant must
lodge with the Council a copy of each
of the notices as published and as
posted. Such notices must be to the
satisfaction of the Council.
(c) The Council shall take into
consideration any objections received
within the said period of fourteen
(14) days and shall notify the
applicant and the persons, if any,
from whoin objections were received of
its decision.
(d) The decision o£ the Council shall not
take effect until the expiration of
twenty eight (28) days from the date
on which the applicant and the
objectors, if any, are notified
thereof, or if an appeal has been
made, until such appeal is disposed
of.
pieeeteeneeee CG,
Enaquiries:Mr C T Swanepoe. | OF
wind
Reference: L/EXtls/ «bp |
14 Soril. 1992
National Housina enterprise
PO. Box 2ZO1LS2
WINDHOEK
Lmeo-eoree meaet
Mr A Botes
,APPLICATION TO PURCHASE RESIDENTIAL BLOCKS : ERVEN 1373,
1374
AND 1430 EXTENSION 15, KHOMASDAL.
Your application with reference 159921. dated 11 Dece
mber 19°92.
refers. .
Recommendations for the sale of Residential Bloc
ks. Erven 1376.
1274 and 1430 Khomasdal. Extension 15 to vour Companv
or its
nominee. have been adopted by the Municipal Cou
ncil on 3$1.March
1993. Resolution no. 89/03/93. refers.
Your Company is herewith kindly called upon to arranae
with our
Khomasdal Offices for the slanina of the Deed of sale.
Please
mote that slgnature is subject to payment of
the purcnase
price. namely Rl 221 9687.52 (R1S.71/m7). presentation of 2
Power of ALtornev and appropriate identification
in resoect of
the sianatorv together with proof of reqistration as a N
amibian
company.
KKK Attached please find a copy of the resolutio
n for information..
Yours faithfully
Cup %,
PERTY MANAGER : WESTERN AREAS
[Municipal Council Minutes: 1993-03-31]
F.1 SALE OF ERF 41, OKURYANGAVA PROPER AND
ERVEN 1373, 1374 AND 1430, KHOMASDAL
FOR RESIDENTIAL PURPOSES
(L/41/OKU) (L/1373/KD) (L/1374/KD) (L/1430/KD}
On a proposal by Councillor I Ngatjizeko it was
RESOLVED
1.
1.1
The Erf 41, Okuryangava Proper, in extent 25 794/m2
be sold to the National Housing Enterprise or their
nominee at an upset price of R11,37/m? subject to
the following conditions:
That Erf 41, Okuryangava Proper be rezoned from
"undetermined" to "residential".
That consent be granted to use Erf 41, Okuryangava
Proper for residential purposes until the rezoning
is approved by Cabinet.
1.10.3
1.10.4
1.10.5
1.10.6
1.10.7
1.10.8
1.10.9
e
e
That the tarring and surfacing of the roads
only be done once 75 % of the erven have been
developed and the written approval of the City
Engineer has been obtained.
That the design of the roads and stormwater
systems be done on a CAD system adaptable to
the system used by the Municipality i the
information a ) the
Municipality.
se _
That the streets be constructed and stormwater
drainage system be installed at the cost of
the National Housing Enterprise to the
satisfaction of the City Engineer.
That the National Housing Enterprise be
responsible for the maintenance on the street
and stormwater systems for a period of twelve
months after completion and take-over of the
works by the Municipality. [A deposit of 5 3%
of the value of the works must be paid to the
Municipality.]
That street lights Be installed at the
National Housing Enterprises costs and to the
Satisfaction of the City Engineer.
That the National Housing Enterprise take note
that, should they continue with the
subdivision of Erf 41, Okuryangava Proper,
municipal approval firstbe obtained and, in
the event of any of the new erven being
alienated, except for streets or public places
reserved for municipal purposes which shall be
transferred free of compensation,
subdivisional costs and transfer fees to the
Municipality, an endowment, calculated as a
percentage, 7,5 %, of the land value of the
first 10 erven and 1 % of the value of
additional erven created by the subdivision,
being alienated, excluding a remainder, be
paid to the Municipality in accordance with
the stipulations of section 19 of the Township
and Division of Land Ordonnance No. 11 of
1963.
That the National Housing Enterprise take note
that the new erven may only be sold after
confirmation that the conditions as stipulated
in paragraphs 1.10.1 to 1.10.7, have been met.
R
R
O
a
m
eh
o
m
c
e
e
e
o
n
y
me
o
m
t
n
i
a
p
e
n
e
he
e
R
R
r
y
e
eT
1.11 That approval in terms of section 30(1)(t) of Act
43 of 1992 be obtained from the Ministry of Local
Government and Housing.
1.12 That the purchase price of R293 277,78 be paid
in
cash and the Deed of Sale be signed within thirty
(30) days after being requested to do so by t
he
Property Manager (Northern Areas).
} That Council Resolution 597/11/89 atta
28 to the agenda be rescinded.
That Erven 1373 and 1374 (in extent % 25 692 m®*)
and Erf 1430 (in extent + 39 627 m2), Extens
ion 14,
Khomasdal be sold to the National Housi
ng
Enterprise or their nominee by way of priva
te
negotiations at an upset price of R18,71/m? subject
to the following conditions:
2.1 That consent be granted to erect more t
han one
dwelling, up to the following maximums on the
erven:
Dwelling
unit
Erf 1373 : 1,5419 ha + 250 m* = 61
Exf 1374 3 1,0273 ha + 250 m* = 41
Erf 1430 °: 3,9620 ha + 250 m* = 158
Total potential 279
2.2 That the National Housing Enterprise be responsible
to bear the costs of the internal water and sewer
network.
9.3 That the National Housing Enterprise consult
personally with the City Electrical Engineer to
discuss the necessary electricity supply
alternatives for the development and the costs
involved.
5.4 That the National Housing Enterprise submit
electrical plans of the development for the
planning of telephone services and lines to Telecom
Namibia.
..§ That the National Housing Enterprise take note that
the erven can be developed in two ways:
24
Residential development with
out subdivision:
If a development takes
place without
subdivision, the potential
number of units
which could be erected
is determined 4s
follows:
Use can be made of the full pote
ntial of the
erf in all the various dens
ity cases.
subdivision.
Residential development wi
th
If National Housing Enterp
rise wish to
subdivide the erf, the pot
ential number of
erven which could be created
is determined as
follows:
ERF AREA X 0,8 + DENSITY
(Approximately 20 % of a
development is
usually needed for use as str
eets and public.
open spaces which must be
provided with
subdivisions. Thus the facto
r of 0,8 used.)
In cases where the density i
s higher than
1/500 (for example 1/250, 1/167
, 1/150 and
1/100), the erf, area x 0,8
is divided by the
minimum erf area acceptable to
the Minister of
Local Government and Housing a
t the time of
the subdivision.
That, should the National Hous
ing Enterprise wish
to subdivide the erf, the sub
division application
be referred to Town Plannin
g for more detail
comments and conditions in res
pect of services and
Town Planning aspects.
That National Housing Enterpri
se take note of the
sewer lines on Erf 1430 as pe
r Plan P/3028/A
attached as page 29 to the ag
enda.
That National Housing Enter
prise at their cost
register servitudes in favour
of the Municipality
to protect the services.
That National Housing Enterpri
se take note that a
part of Erf 1430 lies on fill
material and that
they will have to do an invest
igation at their own
cost to determine a suitable
foundation.
x
R
Y
c
h
e
k
eh
h
é
be
r
p
r
i
.
a
e
oe
:
a
~
a
t
h
e
e
S
h
e
2A
yn
we
d
e
y
<
Ne
e
f
a
s
s
B
S
p
a
g
e
s
.
fa
g
a
@
r
®
-
2
*
=
c
s
*
e
a
t
e
a
i
s
B
o
w
,
Th
ey
he
a
t
(
H
A
e
r
y
¢
a
r
M
r
e
g
+
5
st
p
ha
ge
y"
Ma
"p
ed
i 1
e
r
e
o
w
R
a
i
n
o
e
ac
a
y
é
O
y
y
s
a
e
P
E
a
W
a
a
l
ye
A
e
.
o
n
i
g
o
r
s
a
~
*
e
e
;
E
R
oS o
h
42
be
4S
B
a
h
A
i
g
m
o
r
t
a
vf
ah
a
a
a
!
e
e
a
s
2
T
P
a
y
Wr
y
E
B
B
R
E
E
A
O
e
C
o
n
.
P
E
V
a
25
2.10 That National Housing Enterprise take note of the
conditions for the construction of road services if
the erven are to be subdivided.
2.10.1
2.10.2
2.10.3
2.10.4
2.10.5
2.10.6
2.10.7
2.10.8
The detail design of roads and streets: The
detail design of the surfacing on the streets
and the detail of the stormwater
systems must be done according to the City
Engineers requirements and approved before
any work is started.
Design and construction of all civil work must
-be done under the supervision of «a
professional engineer to the satisfaction of
the City Engineer.
The tarring and surfacing of the roads can
only be done once 75 % of the erven have been
developed and the written approval of the City
Engineer has been obtained.
That the design of the roads and stormwater
systems be done on a CAD system adaptable to
the system used by the Municipality and the
information be made available to the
Municipality. |
That streets lights be installed at the
developers cost to the satisfaction of the >
City Engineer.
That the streets be constructed and stormwater
drainage system be installed at the cost of
the developer to the satisfaction of the City
Engineer.
That the National Housing Enterprise be
responsible for a maintenance period on the
street and stormwater systems for a period of
twelve months after completion and take-over
of the works by the Municipality. [A deposit
of 5 % of the value of the works must be paid
to the Municipality. ]
That the National Housing Enterprise take note
that the new erven may only be sold after
confirmation that the conditions as stipulated
above, have been met.
2.11 That the National Housing Enterprise familiarise
themselves with the stormwater on all the erven.
drainage
4.12 That the National
Housing Enterprise take
note
that, should they continu
e with the subdivision o
f
Frven 1373, 1374 and 1
430, Khomasdal, municip
al
approval must first be o
btained and, in the even
t
of any of the new erven b
eing alienated, except f
or
streets or public places
reserved for municipal
purposes which shall
be transferred free o
f
compensation, subdivisi
onal costs and transfer
fees
to the Municipality, an
endowment, calculated
as 4
percentage, 7,5 %, of
the land value of the
first
10 erven and 1 % of the
value of -additional erve
n
created by the subdi
vision, being alienat
ed,
excluding a remainder, b
e paid to the Municipali
ty
in accordance with the s
tipulations of section
19
of the Township and Di
vision of Land Ordonnan
ce
Number 11 of 1963.
2.13 That Council Resolution
120/4/92 attached as pages
30 - 31 to the agenda be r
escinded.
2.14 That Governmental appr
oval for the sale be obtain
ed
in terms of section
30(1)(t) of the Local
Authorities Act 23 of 1992.
>.15 That the purchase pr
ices be paid in cash and
the
Deed of Sale be signed
within thirty (30) days
after being requested b
y the Property Manager
(Western Areas) to do so.
RESOLUTION NO. 89/03/93
@
sos
e
S
O
R
E
N
I
E
T
O
P
N
T
V
E
S
©
T
E
E
S
E
o
e
r
2
T
y
1
9
F
T
|
T
e
|
o
e
a
]
J
e
.
|
a
e
e
S
a
r
a
y
f
"
:
H
T
m
e
[
|
|
a
L
8
P
i
t
y
g
y
e
a
!
-
i
w
u
Br
ie
cy
pe
ar
is
s
i
a
OSHATOTWA PROGRAMME QUARTERLY PROGRESS REPORT 2 -~JUNE/93
ANNEX 2.2/b
LAYOUT APPROVAL
* Letter to Municipality requesting approval of lay-outs
* Municipal Council's June resolution approving lay-out
plans for core-house projects
Windhoek
Namioia
Our ref: 715/4652/AW/en
Date : 17 May 1993
Town Planning Department
City of Windhoek
P O Box 59
WINDHOEK
Attention: Mr N. van der Westhuizen
Dear Sir
LOCAL AUTHORITY APPROVAL FOR TOWNSHIP LAYOUTS, KHOMASDAL: EBxT. 15,
OKURYANGAVA PROPER:
Further to our discussions on Monday 26 April 1993 I am writing to confirm the
above. | . :
I would like to confirm that I handed, on behalf of NHE, to you three copies
of each township layout for the following erven. °
Extension 15, Khomasdal: 1430
1373 and 1374 (one drawing)
Okuryangava Proper =; 41
We note the following.
1. Erven 1373 and 1374:
Submitted for comment from all relevant departments and approval of the
Municipality. We understand that this could take three months but would
really appreciate it being done as soon as possible.
2. Erf 1430 and Erf 41: oe _ 7
These layouts have been amended in response to comments from the
Municipality received earlier this year. We understand that it is
possible that this matter may be discussed at the Municipalitys
- Management Committee meeting on 3/5/93, to be put to Council at the end
of May. Once again we would be very grateful if this could be expedited
as a matter of urgency. : | :
We trust that you are in agreement with the above and would like to thank you
for your co-operation and assistance this far.
Yours faithfully
Andrew Walton
SUM-MCNAMARA CONSULTANTS
srmany: | - Namibia:
imbachtal 9, 6200, Wiesbaden. . 104 Leutwein St, P O Box 3682, Windhoek
14G 11-522225 Fax 59211 Tel 264-61-35065 Fax 32969
City Engineer's D
Ena: N H v/d Westhuizen | Ref: L/Ext.15/KD
Tel: 391-2377 7
SUM ~ McNamara Consultants
PO Box 20192
WINDHOEK
Sir
MINOR CHANGES ON LAYOUT PLANS .
Your verbal request and submission of amended plans on 01 July 1993, refers.
The layout on Erf 41, Okuryangava Proper and Erven 1430 and the consolidated
Erven 1373 and 1374, Khomasdal Extension 15 were approved by Council on 30 June
1993 by virtue of Council Resolutions 203/06/93, 241/06/93 and 202/06/93
respectively.
The proposed changes on the layouts are not of major extent and therefore need
not be re-submitted to Council. The mentioned Council resolutions authorized the
City Engineer to approve minor changes to the proposed layouts.
Consolidated Erven 1373 and 1374, Khomasdal Extension 15
As agreed upon with the City Electrical Engineer no additional substation site
is needed in this area which resulted in the creation of an additional
residential erf. The removal of the substation erf resulted in many small
boundary changes but the street layout remains the same. For your submission to
Townships Board the approved layout plan No 1373/4/KD-15 must be replaced by your
plan No 153931-005.
It should be noted that, due to the removal of the substation erf, paragraphs 2
to 2.2 of Council Resolution 202/06/93 must be adjusted to fit the amended plan.
The mentioned Countil Resolution will remain the same except for paragraphs 2 to
2.2 Which will read as follows: ~
"1. That ...
2. That the consolidated erf (1373 and 1374) Khomasdal Extension 15 be
subdivided into 66 portions and Remainder (street) as indicated on the
applicants plan 153931-005 subject to the following conditions:
2.2 That the Remainder of the consolidated erf be reserved as street with no
conditions registered against it.
2.2 That the standard conditions be registered against all the newly created
residential erven (Portions 1 to 66).
A
2.3 That, in the event ..."
Erf 41, Okuryangava Proper
As with the consolidated Erven 1373 and 1374 it has been arranged with the City
Electrical Engineer that no additional substation site is needed in this area
which resulted in the creation of an additional residential erf. AS you are
aware Portion 43, as indicated on your newly submitted plan No 156931-007, is
created as an additional residential erf and can only be connected to the
existing sewer line at great expense to the developer.
The removal of the substation erf resulted in many small boundary changes but the
street layout remains the same. For your submission to Townships Board the
approved layout plan No 41-OKU-93 must be replaced by your plan No 153931-007.
It should be noted that, due to the removal of the substation erf, paragraphs 1
to 1.2, 1.4 and 1.6 of Councils Resolution 203/06/93 must be adjusted to fit the
amended plan. The mentioned Council Resolution will remain the same except for
the abovementioned which will read as follows:
1. That Erf 41, Okuryangava be subdivided into 63 portions and Remainder
(street) as indicated on the applicants plan No 156931-007, subject to
the following conditions:
1.1 That the Remainder be reserved as street with no conditions registered
against it.
1.2 That the zoning of residential, as determined per Council Resolution
89/03/93, with a density of one dwelling per 250 m*, be applicable on
Portions 1.to 63.
1.3 That consent be granted ...
1.4 That the standard conditions be registered against all the newly created
residential erven (Portions 1 to 63).
1.5 That, in the event ...
1.6 That a 3 metre wide stormwater servitude be registered in favour of the
Municipality of Windhoek, on Portion 41, as indicated on the applicants
plan No 156931-007. |
1.7 That the Municipality ...
Erf 1430, Khomasdal Extension 15
The relocation of the substation site to the most western corner of Erf 1430, as .
arranged with the City Electrical Engineer, is confirmed. The location of the
existing substation will thus be accommodated in your newly submitted layout No
153931-006.
Cr
rn
cn
ne
m
The re-arrangement of the erven and the more exact location of boundaries, as
determined on the Computer Aided Drafting program, resulted in the creation of
9 more residential erven. The average residential erf size remains 317 m.
Due to the re-arrangement of the erven and the more exact location of boundaries,
as determined on the Computer Aided Drafting program, paragraphs 1 to 1.2, 1.24
and 5 of Council Resolution 241/06/93 must be adjusted to fit the amended plan.
The mentioned Council Resolution will remain the same except for the
abovementioned paragraphs which will read as follows:
1. That Erf 1430, Khomasdal Extension 15, be subdivided into 105 portions and
Remainder (street) as indicated on the applicants plan No 156931-006,
subject to the following conditions:
1.1 That portion 105 be rezoned to "municipal", Portions 101 to 104 be
reserved as "public open spaces" and the Remainder of Erf 1430 be reserved |
as street with no conditions registered against it.
1.2 That the standard conditions be registered against all the newly created
residential erven (Portions 1 to 100).
1.3 That, in the event ...
1.24 That a 3 metre wide servitude, in favour of the Municipality of Windhoek,
be registered on Portions 33 to 36, to protect the main sewer line as
indicated on the applicants plan No 153931-006.
1.25 That 3 metre wide ...
5 That the applicant take note that electricity will be provided from the
existing substation located on the proposed Portion 105 as indicated on
the applicants plan No 153931-006.
6. That the applicant ...
This letter must be submitted with all the relevant Council Resolutions to
Townships Board for approval of the layout plans. |
NX
CITY ENGINEER
/mpe
1s
(Municipal Council Minutes: 1993-06-30]
H.1il APPROVAL OF LAYOUT - ERVEN
1373 AND 1374 KHCHASDAL EXT 15 -
RESIDENTIAL DEVELOPMENT
(L/EXT. 15/KD)
On a proposai by Councillor I Ngatjizeko it
was
RESOLVED
Ll. That Erven i373 and 1374, Khomasdal, Extension
15
be consolidated into one erf.
2. That the consolidated erf (1373 and 1374) Khomasdal
Fxtension 15 be subdivided into 65 portions
and
Remainder (street) as indicated on the applicants
plan 1373/4/KD-15 subject to the following
conditions:
2. That portion 65 be rezoned to "municipal" and the
N
O
Remainder of the consolidated erf be reserved as
street with no conditions registered against it.
That the standard conditions, attached as page 25
to the agenda, be registered against all the newly
created residential erven (portions 1 to 64).
That, in the event of any of the new erven being
alienated, except for streets or public places
reserved for municipal purposes and municipal zone
d
erf, which shall be transferred free of
compensation, subdivisional costs and transfer fees
to the Municipality, an endowment, calculated as
a
percentage (7,5 %) of the land value of the first
10 erven and 1 % of the value of additional erven
created by the subdivision, being alienated
,
excluding a remainder, be paid to the Municipality
in accordance with the stipulations of section 19
of the Township and Division of Land Ordonnance No.
11 of 1963.
That for the payment of the endowment the
Municipality may accept serviced erven in place of
cash.
That the prospective developers consult personally
with the City Electrical Engineer to discuss the
necessary electricity supply alternatives for the
development and the costs involved.
L
O
10
-il
-12
13
.14
20
That the developer submit electrical plans of the
development for the planning of telephone services
and lines to TELECOM Namibia.
That no access be taken from Gladiola Street.
That the provision of all services (internal water
and sewerage network included), streets, stormwater
drainage systems, street lights, traffic signs,
street names and road markings be for the account
of the developer, including all professional fees.
Theat the detail geometric and pavement design of
roads and streets, the stormwater drainage systems
and the internal water and sewerage design be done
according to the City Engineers requirements and
approved before any work is started.
That the design and construction of all civil work
(including the internal water and sewerage
networks) be done under the supervision of a
professional engineer to the satisfaction of the
City Engineer.
That the tarring and surfacing of the streets is a
requisite and can only be done once the written
approval of the City Engineer has been obtained and
that all other services be installed before
approval be granted.
That the design of the roads, stormwater systems
and the internal water and sewerage networks be
done on a CAD system adaptable to the system used
by the Municipality and the information be made
available to the Municipality.
[A complete set of as-built drawings must be
submitted to the City Engineer once the project is
completed. ]
That the streets be constructed and stormwater
drainage systems be installed at the cost of the
developer to the satisfaction of the City Engineer.
That all the work as determined in paragraphs 2.5
to 2.13 be completed before any registration of
subdivisions be allowed; if not a deposit be paid
to Council equivalent to the value of the
outstanding work, which is refundable when the work
is satisfactorily completed.
2.
b
h
N
O
15
18
19
. 20
-21
K
O
tr
.)
21
That the developer be responsible for a retention
period of 12 months on the street and stormwater
systems and vthe internal water and sewerage
networks after completion and take-over of the
wocks by the Municipality.
[A retention amount of 5 %* of the value of the
works must be paid to the Municipality, which will
be used if the developer fails to do any
maintenance repairs. ]
That street lights be installed at the developers
costs and to the satisfaction of the City Engineer
and that the street name posts, road signs and road
markings be done to the satisfaction of the City
Traffic Department.
That the developer bear tne full network costs of
services, water and sewer, including the planning,
design, supervision and construction costs.
That the planning and design of the water and
sewerage reticulation networks be done by
professional engineers, according to municipal
standards and specifications for the developers
account.
That the design of the water and sewerage
reticulation networks be done on a CAD system
adaptable to the system used by the Municipality
and that the information be made available to the
City Engineer.
That the plans cf the proposed water and sewerage
reticulation be draftea by the professional
engineer, employed by the developer for the design
and be submitted to Council and approved by the
City Engineer.
That the construction of water and sewer
reticulation networks be supervised by a
professional engineer to the satisfaction of the
City Engineer.
That all reticulation networks connect to the main
services provided by the Municipality and all
connection points be approved by the City Engineer.
so
to
L
O
1Q.
r
~
N
a
n
d
22
That the applicant take note that main services are
provided by the Municipelity to the area and the,
location of these services be clarified with the
City Ungineer before the planning or construction
is started.
That the contcurs on erf plans available from the
City Engineers office cannot be guaranteed due to
gravel mined on erven and due to accuracy:
tolerances in assembling these plans.
That the applicant take note that no Telecom
services are available in this area and the
developer supply Telecom with a site plan of this
project as soon as it is available to arrange for
the supply of telephone services.
That the applicant take note that electricity to
this erven be provided from en existing substation
on Erf 1372 Gladiola Street.
That the applicant be requested to submit names for
the new streets to be created and that the names be
in the same context as the other street names ir
the area.
That the Registrar of Deeds be requested not tc
register the transfer of any portion before
confirmation has been received from the
Municipality, under the hand of the Town Clerk,
that the endowment as stipulated above has beer
paid.
That the prospective developers take note that the
new _erven may only be registered after confirmation
that the conditions as stipulated in paragraphs 2.
to 2.22, have been met.
That the City Engineer approve minor changes to
the layout plan.
That the Land Surveyor, responsible for the survey
of the area, not submit his survey records to the
Surveyor General unless accompanied by é
certificate of approval from the Municipality of
Windhoek that all the relevant conditions have beer
met.
Financial implications: None
RESOLUTION 2062/06/93
ast mene cepa ee tee tar i te eee en em ten Re tty ED em Ge ED GD OOD en GOR OEP OD Ge Gh OE Ce Gee GEE GF cE coe GOR GD SKK CUES enne Smet ERE ee Gey GEE eo eens GE aoue ome cenY coe
8.1.15
23
(Municipal Council Minutes: 1993-06-30]
H.12 APPROVAL OF LAYOUT - ERY 41
OKRURYANCAVA PROPER - RESIDENTIAL
DEVELOPMENT
(L/Okuryangava )
On a proposal by Councillor I Ngatjizeko it was
RESCLVED
1. That Erf 41 Okuryangava be subdivided into 63
portions and Remainder (street) as indicated on the
applicants plan No. 41-OKU-93, subject to
following conditions:
the
1.1 That Portion 63 be rezoned to "municipal" and the
Remainder of Erf 41 be reserved as street with no
conditions registered against it.
1.2 That the zoning of residential, as determined per
Council Resolution 89/03/93, with a density of one
dwelling per 250 m2, be applicable on portions 1 to
62.
1.3 That consent be granted to use the new erven for
the purposes as mentioned in paragrapns 1.1 and 1.2
while the rezoning is still in process.
1.4 That the standard conditions, including the
standard stormwater clause be registered against
all the newly created residential erven (portions l
to 62) as per page 29, attached to the agenda.
1.5 That, in the event of any of the new erven being
alienated, except for streets or public places
reserved for municipal purposes and the municipal
zoned erf, which shall be transferred free of
compensation, subdivisional costs and transfer fees
to the Municipality, an endowment, calculated as a
percentage (7,5 %) of the land value of the first
ry
10 erven and i % of the value of additional erven
created by the subdivision, being alienated,
excluding a remainder, be paid to the Municipality
in accordance with the stipulations of section 19
of the Township and Division of Land Ordonnance No.
11 of 1963.
tr
em
em
l
H
y
- 10
iil
-12
-13
.14
~15
24
That a 3 metre and 4 metre wide stormwater
servitude be registered in favour of the
Municipality of Windhoek, on portions 42 and 44
resnectively, as indicated on plan No. 41-OKU-93 of
the applicant.
That the Municipality supply and install electrical
services to this development at Councils expense
exciucing hcuse service connections which will be
for the developers account.
That should the developer insist on underground
services the difference in costs be at his own
expense.
That the developer arrange a meeting with the City
Blectrical Engineer to discuss the provision of
street lighting and clear design considerations to
accept Airdac service connections and prepayment
metering.
That the provision of street lights be done by the
City Electrical Engineer or to his satisfaction and
at the developers expense.
That the developer submit electrical plans of the
development for the planning of telephone services
and lines to Telecom Namibia.
That no access be taken from Ekundi Street.
That the provision of all services, streets,
stormwater drainage systems, street lights, traffic
Signs, street names and road markings be for the
account of the developer, including all
professional fees.
That the prospective developers familiarise
themselves with the stormwater on the erf as well
as the portion at the north eastern corner of Erf
41 which cannot be connected to the existing sewer
line.
That the detail geometric and pavement design of
roads and streets, the stormwater drainage systems
and the internal water and sewerage design be done
according to the City Engineers requirements and
approval before any work is started.
[
-
-
!
_
oL
a,
i) WW
I
O
O
a
k
o
O
mn
t
7
18
9
. 20
L
25
That the design and construction of all Civil work
cluding the internal. water and sewerage
networks) be dcne under the supervision of a
protessional engineer to the satisfaction of the
City Engineer.
That only the bellmouths wnere the internal streets
nect to the existing tarred roads be paved to
satisfaction of the City Engineer should the
eveloper decide not to tar the internal streets.
That the design of the roads, stormwater systems
and the internal water and sewerage networks be
done on a CAD system adaptable to the system used
by the Municipality and the information be made
available to the Municipality.
fA complete set of as built drawings must be
submitted to the City Engineer once the project 1s
completed. ]
That the streets be constructed and stormwater
drrinage system be installed at the cost of the
developer to the satisfaction of the City Engineer.
That the stormwater trenches or outlets, as
indicated on the applicants plan, be protected
against erosion or alternatively pe piped.
That the pedestrian walkway to Ekundi Street be
blocked off to motorised vehicles in an effective
manner or alternatively not be wider than 1,5
metres.
That all the work as determined in paragraphs 1.15
to 1.21 be completed before any subdivisions be
allowed: if not, a deposit amount be paid to
Council equivalent to the value of tne outstanding
work, which is refundable when the work is
Satisfactorily completed.
¥
Pp ct
W
w
SE
c
t
the developer be responsible for a retention
d of 12 months on the street and stormwater
m and the internal water and sewerage
afcer completion and take-over of theOUK
s by the Municipality.
OC
e
~ WNCt
r
1
rd
a
4
ba
nd
t
(A retention amount of 5 % of the value of the
works must be paid to the Municipality, which will
be used if the developer fails to do any
maintenance repairs. |]
f
e
t
f
e
24
-27
-28
29
~ 30
>
.
26
That street lights be installed at the developer's
CoOSts and to the satisfaction of the City Engineer.
t the developer bear the full network costs of
That the planning and design of the water and
sewerage reticulation networks be done by
professional engineers, accorcing to municipal
Standards as specifications for the developers
account.
That the design of the water and sewerage
reticulation networks be done on a CAD system
adaptable to the system used by the Municipality
and that the information be made available to the
City Engineer.
That the plans of the proposed water and sewerage
reticulation be drafted by the professional
Engineer, employed by the developer for the design,
and be submitted to Council and approved by the
City Engineer.
That the construction of water and sewer
reticulation networks be supervised by a
professional engineer to the satisfaction of the
City Engineer.
That all reticulation networks connect to the main
Services provided by the Municipality and all
connection points be approved by the City Engineer.
That the contours on erf plans available from the
City Engineers office cannot be cuaranteed due to
gravel mined on erven and due to accuracy
tolerances specified in assembling these plans.
That the applicant take note that in order to
facilitate a remunerative service it is envisaged
that low voltage distribution and house service
connections be done utilizing Aerial Bundled
Conductor and Airdac service cable respectively.
That the developer take note that Erf 41 has a
sewer line on the south boundary from which a sewer
connection could be arranged and that water for the
development of Erf 41 can be provided from Ongava
Street.
8. - Cy
27
5. That the applicant take note that no Te
lecom
services are available in this area and the
developer supply Yelecom with a Site plan of this
project as soon as it 1s available to arrange for
the supply of telephone services.
6. That the Registrar of Deeds be requeste
d not to
register the transfer of any portion befor
e
confirmation has been received from th
e
Municipality, under the hand of the Town Cie
rk,
that the endowment as stipulated above has b
een
paic.
~
J That the prospective developers take note that the
new erven may only be registered after confirmation
that the conditions as stipulated in paragraphs 1.6
to 1.30 have been met.
8. That the Land Surveyor responsible for the s
urvey
of the area, not submit his survey records to the
Surveyor General unless accompanied by a
certificate of approval from the Municipality of
Windhoek, that all the relevant conditions have
been met.
Financial implications: None
RESOLUTION 203/06/93
(Municipal Council Minutes: 1993-06-30]
K{.1 VANDALISM AT KEY POINTS
AND THE PROTECTION THEREOF
(6/2/2/2/1)
On a proposal by Councillor I Ngatjizeko it was
RESOLVED
That an overexpenditure of R2 500,00 on Vote 16/02/161
1 be
approved and be financed from a transfer from Vot
e
16/02/00232.
RESOLUTION 204/06/93
oeee
eeaea
SS
SSeSSSSaeS
SS
ea S
SSSSSSS
SSSSSSSSSSSS
S FS TT
ee
en
co
m
t
a
'
)
2
pr
ec
s
i
c
a2
|
:
{|
b
i
~
,
Se
al
p
e
e
s
E
R
qu
en
ce
1
|
m
i
u
y
t
e
t
r
T
]
OSHATOTWA PROGRAMME - QUARTERLY PROGRESS REPORT 2 -JUNE/93
ANNEX 2.2/c
CORE--HOUSE PROJECTS LAND
| DEVELOPMENT
* Standards and cost estimates
@ _ * Preliminary work programme
CONSULTING CIVIL STRUCTURAL AND HYDRAULIC ENGINEERS
P.O. BOX 3106 9 LOVE STREET WINDHOEK, NAMIBIA TEL. (061) 34081 FAX (061) 32478
| 30 June 1993to
)
«
s
a
b
h
| I I A/
ATTENTION MRA WALTON
National Housing Enterprise
P O Box 20192
WINDHOEK
Dear Sir
OSHATOTWA HOUSING PROGRAMME : CORE HOUSE PROJECT:
ALTERNATIVE ROAD SURFACINGS
Further to our verbal communication on Friday 25 June 1993, we wish to submit to you details
of the estimates prepared for alternative road surfacings.:
The following four different alternatives were investigated :
Alternative I : ° 5.5m road width
° Subgrade preparation
° 100mm Subbase
° 100mm Base course
Alternative 2 . 5.5m road width
° Subgrade preparation
° 100mm Subbase
° 100mm Base course
° Single seal chip and spray (9.5mmstonc) followed by fogspray.
Surfacing applied to full 5.5m width
° Kerbing and channelling on oneside of road
° Concrete edging on other side of road
PARTNERS: K.A.H. LUND FP: Eng. BScEng FSAICE MEPA MASCE MACEN V. UHRICH Pr Eng . Oipiing, MEPA ASSOCIATE: HINA J.A. MU ASHEKELELLB MSciCiwilEng Econ)
REGISTERED FIRM: ASSOCIATION OF CONSULTING ENGINEERS OF NAMIBIA
Alternative 3 ° 5.5m road width
° Subgrade preparation
° 100mm Subbase
° {0Qmm Base course
° Single seal bituminous surfacing as for alternative 2 but applicd
to a width of only 3 metres
° Concrete edging on both edges of surfacing
Alternative 4 ° 3.5 m road width
° Subgrade preparation
° L0Omm Subbase
° 100mm Base course
° Single seal bituminous surfacing as for altcrnative 2 applicd to
full 5.5m road width
The following cost est.nates do not include anycut and fill operations required to bring the
subgrade to the required levels as these works would be common to all alternatives. The
estimates are only intended to indicate the variation in costs for the different surface finishes.
Estimates are based on unit rates obtained from various contractors involved on similar works in
Windhoek. The validity of these rates was checked with the Municipality.
ALTERNATIVE - Cost in Rand
1 2 3 4
Erf 1430, Khomasdal 4? 618 118 674 80 024 67 574
Erf 1373,1374 -
Khomasdal 31 329 90) 285 S59 445 49 685
Erf 41, Okuryangava 37 875 107 668 71 538 60 068
We trust that the above information will be of value to you.
Yours faithfully,
K A H LUND Pr Eng
LUND CONSULTING ENGINEERS
CONSULTING CIVIL STRUCTURAL AND HYDRAULIC ENGINEERS
P.O. BOX 3106 9 LOVE STREET WINDHOEK, NAMIBIA TEL. (061) 34081 FAX (061) 32478
03 July 1993i feeo
e
s
d
a
o 2 Lal La Lay
ATTENTION MR A WALTON
National Housing Enterprise
P O Box 20192
WINDHOEK
Dear Sir
OSHATOTWA HOUSING PROGRAMME: CORE HOUSE PROJECT : REVISED COST
ESTIMATES
In accordance with your request, we have prepared a revised cost estimate for the provision of
services (water and sewagereticulation, roads and storm water drainage) in Khomasdal
Extension 15, erven 1373, 1374 and 1430 and Okuryangara Proper, erf 41.
The estimates have been based on layouts provided by yourselves and contours indicated on the
layouts. Cost estimates for road works are based on details submitted to you under cover of
our letter ref. 111A/3512 dated 30/6/93 for bituminous surfaced roads in the Khomasdal erven
(5.5 m road width, 100mm sub-base, 100mm base course, edging and kerbing and channelling
were required) and gravel surfaced roads in the case of Okuryangara Proper (100mm sub-base
and 100mm base course only).
The estimates must be considered as appropniate only as no detailed quantities for earthworks
were extracted. Average depths of trench excavation were used throughout and cut and fill
quantitics for road works were based on a rough approximation of road gradients.
PARTNERS: K.AH. LUNOT? Eng BScbng PSAICL MEPA MASCE MACEN V.UHRICH Pr Eng. Dipling MEPA ASSOCIATE: HINA J.A. MU ASHEKELE LLB. MSc (Ciwil Eng Econ|
REGISTERED FIRM: ASSOCIATION OF CONSULTING ENGINEERS OF NAMIBIA
The estimates for the provision ofthe required services are as follows-
Khomasdal Ext. 15, Erf 1430
R 437 000
Khomasdal Erf 15, Erven 1373 & 1374 R 398 000
Okurvangara Project, Erf 41
R_ 333 000
TOTAL R1 168 000
Wetrust that this information meets with your approval.
Yours faithfully,
a
Lier
Reeeee ene tenance renee een tee arene ee ceseneettersrccaue
K A HLUND Pr Eng
LUND CONSULTING ENGINEERS
5 oe 4MAIN ACTIVITY/RESPOSIBILITY on
© SUPPLEMENTARY ACTIVITY/ INVOLVEMENT ne
STARTING
POSITION
31
,0
53
.9
3
2
1
,
0
6
.
9
3
2
6
.
0
6
,
9
3
0
5
.
0
7
.
9
3
0
9
.
0
8
.
9
3
1
6
.
0
8
.
9
5
0
6
.
0
9
.
9
3
2
0
.
0
9
.
9
3
1
6
,
1
0
.
9
3
2
5
.
1
0
.
9
3
2
0
.
1
2
.
9
5
2
7
.
1
2
.
9
3
{ i i t 4 | {
( 4 t i
i
§V UHRICH STRUCTURAL ENG.
R STOLDT CIVIL ENGINEER.
M BAAS QUAN. & COSTING
C HUNDSDORFER |DRAUGHTSMAN
SURVEYOR SURVEYOR
I
N
T
E
R
D
E
P
E
N
D
A
N
C
E
C
H
A
R
T
03.01.94
27.12.93
20.12.93
13.12.93
06.12.93
29.11.93
22.11.93
13.11.93
08.11.93
01.11.93
25.10.93
18.10.93
41.10.93
04.10.93
27.09.93 LEGEND
20.09.33 oe FULL TIME
13.09.93
PART TIME
06.09.93
CONTRACTOR
30.08.93
23.08.93
16.08.93
09.08.93
02.08.93
26.07.93
19.07.33 START DATE OF SURVEYS DEPENDENT
12.07.93 ON COMPLETION OF BLOCK CORNER SURVEY
05.07.93 |
28.06.93
21.06.93
14.06.93
07.06.93
310583 re LUND CONSULTING ENGINEERS
M
O
N
T
H
S
W
E
E
K
S
T
A
R
T
I
N
G
S
E
C
T
I
O
N
OSHATOTWA HOUSING PROGRAMME
PROGRAMME/RESOURCES
INTER-DEPENDENCE MATRIX
FIGURE 1
[
O
S
W
I
T
H
C
L
I
E
N
T
A
C
T
I
V
I
T
I
E
S
i
O
L
Y
I
N
V
E
S
T
I
G
A
T
E
FI
LL
M
A
T
E
R
I
A
L
PR
EL
IM
IN
AR
Y
LA
YO
UT
S
OF
SE
RV
IC
ES
P
R
E
L
I
M
I
N
A
R
Y
C
O
S
T
E
S
T
I
M
A
T
E
S
S
E
W
E
R
L
I
N
E
S
S
U
R
V
E
Y
P
R
E
P
A
R
E
D
R
A
W
I
N
G
S
OF
S
E
R
V
I
C
E
S
D
E
S
I
G
N
S
E
R
V
I
C
E
S
10
]
F
I
N
A
L
I
S
E
L
A
Y
O
U
T
S
OF
S
E
R
V
I
C
E
S
8
G
E
N
E
R
A
L
L
A
Y
O
U
T
D
R
A
W
I
N
G
S
13
)
P
R
E
P
A
R
E
R
O
A
D
W
O
R
K
S
D
R
A
W
I
N
G
S
18
}
C
O
N
S
T
R
U
C
T
I
O
N
S
U
P
E
R
V
I
S
I
O
N
7
R
O
A
D
S
S
U
R
V
E
Y
9 12] DESIGN ROADS 15]CALLFORTENDERS 16]CONTRACTAWARD /17}| CONSTUCTION3 4 5 6 HY;2PRELIMINARYROADLONG. ! i } iio4 1
'
44
]
P
R
E
P
A
R
E
T
E
N
D
E
R
D
O
C
U
M
E
N
T
A
T
I
O
N
ee
we ae Rgeetmer snr
a
m
u
h
i
pe
w
a
r
t
=
¬
%
i
(e
ae
He
cs
ed
at
ha
OSHATOTWA PROGRAMME - QUARTERLY PROGRESS REPORT 2 -JUNE/93
ANNEX 2.2/a
CORE-HOUSET PROJIECT:
CORRESPONDENCE RELATED TO
VALUE OF CONSTRUCTION IN
RHOMASDAL LOCATIONS
Windnoek
NeaMIO1a
BLDOVUA-WR| .
Department of Properties and Protec
tive Services _ 6
Ge
CIty of Windhoek
P. O. Box 2085
Windhoek
9000
Mrs. J De Kock
Attention:
Dear Madam
WINDHOEK LOW INCOME BOUSING
PROGRAMME. BUILDING VALUES.
KHOMASDAL EXT. 15
We are writing on behalf of the Na
tional Housing Enterprise to confir
m the
agreement reached in discussion with
Mr. N. van der Westhuizen regarding
the
building value required for erven in
Khomasdal ext.15 purchased by the NH
E
for the development of the core
house project within the above
mentioned
programme.
Mr. van der Westhuizen informs us
that although the erven in questi
on (
namely 1373, 1374, 1430 ) have
no building value stipulated in
the
Governmental approval for the develo
pment of these townships, the Depar
tment
of Properties and Protective Servic
es have requested a final building
value
of twice the Municipal evaluation of
the erf. These erven were purchased
for
the development of a core house pro
ject ( kindly see the attached motiv
ation
Appendix A ), thus to have to comply
with this requirement in the first p
hase
would defeat the objective of the
core house project, namely to provi
de an
affordable starting point for fir
st time homebuyers. However with
the
assistance available from the NHE
as an integral component of the ho
using
programme, in the form of technical
advice for the design and constructi
on of
improvements, and financial assistan
ce in the form of short term loans,
the
houses will be developed to a st
andard and value compatible with
the
neighbourhood.We understand that thi
s is acceptable to the Town Planners
of
the City of Windhoek, and are seekin
g confirmation from yourself that th
is is
~ ° acceptable to the Department o
f Properties and Protective Services
. .
We are busy with our application to the
Townships Board for the approval of
the proposed township layouts, which
we intend to submit at the end of Jun
e
for consideration at their meeting at
the end of July. In order to complet
e
the application we need confirmation
of the building value for these erven
.
Your prompt response to this matter w
ould be greatly appreciated.
|
We look forward to hearing from you
at your earliest convenience. Thank
you
in anticipation of your co-operation.
| .
Yo Sincerely
. oe
Andrew Walton
SUM-McNamara Consultants
'
enc. Appendix A.
cc. Mr. B Watson : Tow
n Planning Dept. City of Windhoek.
Mr. N van der Westhuizen Town Pla
nning Dept. City of Windhoek.
Mr. C Steenkamp Special
Projects Officer. NHE.
Germany:
Namibia:
Dai yachtal 9, 6200, Wiesbaden.
104 Lautwein St, P O Box 3682, Windhoek
Tal 3-611-522225 Fax 59211
Tel 264-61-35065 Fax 32969
APPENDIX A
WINDHOEK LOW INCOME HOUSING PROGRAMME: CORE HOUSE PROJECT
BUILDING VALUES FOR THE FOLLOWING ERVEN:
ts bs if Us © Ext.
ty ag ra
l
a ba
d
ron
al
ba
d
tg 6s en Ww wl) ue
BACKGROUND TO THE WINDHOEK LOW INCOME HOUSING PROGRAMME
The Government of the Republic of Namibia and the Kreditanstalt fur
Wiederaufbau ( KfW ), a German implementation agency for capital aid
projects, have signed a financial agreement for the execution of a low income
housing project in Windhoek, addressed to households with incomes of less
than 3x P.H.S.L.( in Oct. 1992 aprox. R 2 490.00 )- The Government of the
Federal Republic of Germany has granted an amount of DM 9 600 000.00 to the
National Housing Enterprise for this purpose. :
During the inception phase ( Sept.92 to Nov.1992 ) various project components
were identified with the participation of the Ministry of Regional, Local
Government and Housing, and the Municipality, and proposed ina
_
report
submitted to the KfW and circulated to all concerned parties in Namibia in
December 1992. The proposals outlined in the inception report were
accepted by the KfW, and at the beginning of 1993 the N.H.E. with assistance
from consultants began work on the implementation of the programme.
One of the main programme components is the development of new core houses.
During the inception phase, suitable erven for this were identified and
applications to purchase from the Municipality of the City of Windhoek were
made and approved on 31.03.1993 at the Council meeting ( Council resolution
89/03/93 ). The NHE has noted the conditions of sale and will shortly
approach the Municipality for the signing of the Deeds of Sale. :
RATIONALE BEHIND CORE HOUSE PROJECT
The prime objective of the project is to improve the housing conditions of
the low-income group. The participants in the scheme will be selected from
the NHE waiting lists and will have household incomes of less than 3 x phsl.
During the inception phase it became apparent that one of the reasons for
the shortage of housing in Windhoek is the high cost of housing available on
the market for first-time homebuyers. It is a factor which contributes to
the overcrowding prevalent in many housholds in Windhoek, for although people
may want to move into homes of their own they are unable to afford the
expense of purchasing a completed home. These factors led to the formulation
of the core house project as one of the components of the programme.
Bi
ns
o
S
i
y
The core house concept is not
unfamiliar to Windhoek where o
ther projects of
this type have been executed
previously, and is common pra
ctice in many
countries. During interviews w
ith households involved in the
se core house
projects, and from the res
earch carried out by the
NHE into the
post-occupancy satisfaction of
the homeowners of the NHE ho
uses, it is
apparent that there exists a wi
llingness and a capability of t
hese households
to )6«6further improve their ho
using through a mobilization
of their own
resources. Many households int
erviewed were of the opinion t
hat the process
of improving their homes would
have been facilitated by finan
cial assistance,
technical advice regarding the
design of the improvements, an
d advice and
supervision for the construct
ion. This would have made t
he incremental
growth of the homes an easie
r task and would have result
ed ina better
quality home.
PROJECT SITES
The project is sited on three
erven in Khomasdal ext.15 (13
73, 1374, 1430)
All the erven are within exis
ting proclaimed townships. -
The upliftment of low income ho
useholds can be hindered or as
sisted by the
proximity of their homes to the
opportunities and facilities of
the city on
which the are dependent for thei
r survival. Hence the correct l
ocation of a
project such as this is vital to
the success or failure of the s
cheme. When
considering sites for the projec
t, priority was given to findi
ng sites which
are integrated into the city
fabric, within a developed o
r developing
neighbourhood. After due co
nsideration and consultation
with the town
planning officials of the Mu
nicipality, it was decided th
at the above
mentioned erven are suitable an
d available for a project of thi
s nature.
COMPONENTS
The project will consist of 1
62 core houses which the parti
cipants will
select from a range of optio
ns, currently being designed
by the NHE,
according to their needs and aff
ordability. The starter option
will probably
consist of a 24 sq. metre core
including a bathroom and toilet
. This can
then be upgraded incrementally t
o a 2 or 3 bedroom house. This
upgrading and
extending will be encouraged
and facilitated by social, t
echnical and
financial assistance from the pr
oject team within the NHE and th
e consultants
engaged in this programme.
Although the value of the initi
al core house will probably be
only equal to
the cost of the erf, the fina
l value if the houses would
be at least
double. All the gnitial constru
ction will be supervised by
the NHE, S50
quality and standards of buildi
ngs will be controlled.
SUMMARY... 7
The need for affordable hous
ing for the low income groups
of Windhoek is
unquestionable. This programme
is specifically designed to en
able access to
quality, affordable homes
that they can improve in
time to achieve homes
which really suit their needs.
The locations selected for the
core house
-project are suitable for devel
opment of this nature, being r
easonably well
integrated into the city fabric
and within existing residential
areas. The
proposed densit.es comply w
ith the Government and Loc
al Authority
requirements, and the proposed e
rf sizes are within the Ministr
y of Regional
and Local Government and Housin
gs demands.
This project should be seen as an attempt to at least partially address one
of most pressing needs in Windhoek today, that of providing housing for the
low income groups, and it is hoped that the Municipality will consider this
application for approval or recommendation of these layouts favourably.
04.06.93.
DEPARTMENT OF PROPERTIESAND PROTECTIVESERVICES
ULRIES: Mrs J S de Kock
TELEPHONE: 391-2702
ENCE: 16/9/2/2/1
noclwuert wrAS RECEIVED
ne ans
AR
25 June 1993 > 8 -06- 15
93
SUM-McNamara Consultants
PO Box 3682
WINDHOEK
Attention: Mr Andrew Walton
Sir
WINDHOEK LOW-INCOME HOUSING PROGRAMME
BULLDING VALUES -KHOMASDAL, EXTENSIGN 15
ERVEN 1373, i374 AND 1430
e
Your application dated ii June 1993 has reference
.
As the Conditions of the Proclamation of Estab
lisnment of
Khomasdal, Extension 15 does not preclude a buiid
ing value of
twice the municipal valuation of the erven,
the Property
Division has no objection to provide as such in
the proposed
Deed of Sale.
Yours faithfully
TRECTOR
ROPERTIES AND PROTECTIVE SERVICESry y
k
Z
U
p
e
j
e
© Fr
]
t
T
o
I
a
OSHATOTWA PROGRAMME - QUARTERLY PROGRESS REPORT 2 -JUNE/93
(a
ec
ET
T
S
E
T
S
i
|
wie
tl
k
ANNEX 2.3/fa
CONTRACT FOR LOAN
GUARANTEE FUND
S
S
my
=
o
"
=
(
e
a
2
p
e
a
f
l
rs
[
a
p
a
!
7
=
|
1
i
"
ENTERED INTO BY AND BETWEEN THE;
of;
P.O.Box 20192
WINDHOEK
Telephone number (061) 37224
(Herein represented by Louis Jacobus Fick in his capacity
as Fund
Adninistrator having been duly authorized thereto
and herein-
after referred to as "LGF")
and
SWA BUILDING SOCIETY
of;
P.O. BOX 2150
WINDHOEK
Telephone number (061) - 225911
(Herein represented by DONALD JOHN RUSSELL in his
capacity as
Managing Director and ANDRIES JOHANNES BORNMAN in hi
s capacity as
Assistant General Manager, having been duly au
thorized thereto
and herein-after referred to as "FI")
Whereas:
a. In the framework of the Windhoek Low-Income Housing
Programme
that the National Housing Enterprise (NHE) is imp
lementing with
financial assistance from the German Government through the
Kreditanstalt fur Wiederaufbau (KfW), it was decided to create an
instrument to encourage private financial institutions toextend
housing loans to low-income families;
agreed to assign an amount
1 000 000 (German Mark one million) to create a LOAN
economic sector.
C. The parties wish to agree the terms and conditions of such
indemnity in writing.
NOW THEREFOREIT IS AGREED THAT:
lL. DEFINITIONS
In this contract of indemnity, unless inconsistent with or
otherwise indicated by the context -
1.1 "Loan Guarantee Fund" means an amount equivalent to DM 1000
000 (German Mark one million), to be held in trust by NHE at a
financial institution of its choice and to be used exclusively
for the purposes and following the procedures established below.
NHE will report to KEW quarterly on the use of these funds.
1.2 "Loan Guarantee" means the guarantee issued by the LGF to
the FI in the form of the attached draft "Guarantee Certificate"
addendum E which covers the FI against losses up to 20% of the
loan granted to an individual.
1.3 "Deposit replacement guarantee" means the same as the
guarantee issued against loss mentioned in 1.2 above.
1.4 "Year of Business" means any period of
one year calculated,
in the case of the first year of business, fr
om 1 July 1993, and
in the case of every succeeding year of
business, from the first
day following the day upon which the immedi
ately preceding year
terminated for a period of twelve montns;
1.5 "Judgement/insolvency advice" means an adv
ice or notice in
the form of Annexure B -
1.5.1 of a judgement having been gra
nted by a competent
court against the borrower in terms of a
guaranteed loan, whether
at the instance of the FI or of any
other person, pursuant to
which judgement -
1.5.1.1 The FI intends to arrange asale
in
execution;or
1.5.1.2 The FI has been given notice in a
ccordance
with any applicable law that the relevant
property
has been attached at the instance of
such a
person; or
1.5.2 of the borrower, in terms of any
guaranteed loan,
having been sequestrated, provisionally
or finally;
1.6 The loan balance" means the am
ount of the balance of the
guaranteed loan actually owed, at the
time when the loan balance
is determined, by the relevant borrow
er to the FI, on account of
the cash amount actually lent and ad
vanced to such borrower and
all finance charges or other costs or amo
unts which may, in terms
of the Usury Act 1968 be recovered fr
om such borrower in terms of
the guaranteed loan, notwithstanding
that such loan balance may
be greater or smaller than the initial val
ue and notwithstanding
that such loan balance may include the amounts of any re-advances
in terms. of the guaranteed loan.
1.7 "Notice of sale of property" means a notice of sale of
property-
in 1.5.1.1; or
1.7.2 By public auction pursuant to the insolvency of the
borrower in terms of any guaranteed loan as contemplated in
1.5.1.2
Substantially in the form of Annexure C.
1.8 "Property" or "Immovable Property" in relation to property
to be mortgaged as Security for a guaranteed loan, includes any
mortgageable right in respect of immovable property.
1.9 "Guaranteed Loan" means a loan advanced by the FI, covered
in terms of this agreement against potential loss in the case of
non-payment of the loan by the borrower where -
1.9.1 Such loan is secured whollyby a first mortgage bond
registered over immovable property in favour of the FI:
1.9.2 The property referred to in 1.9.1 is used or intendea
to be used primarily for residential purposes by the borrower;
1.10 "Primary Household Subsistence Level" means a statistical
calculation of the poverty data line according to the data base
researched by the University of Port Elizabeth for Namibia as
determined from time to time. This information will be available
fron the LGF.
1.11 "Fees" means a fee charged for the issue of a guarantee
which shall be used to cover part of the costs of re-insurance.
This fee shall be included in the loan provided by the FI to the
O
l
individual and paid over to the LGF, on registration
of a first
bona in respect of the property.
1.12 The singular shall be deemed to include a reference to
the
plural and reference to one gender shall be deemed to include
a
reference to the others and vice versa.
2, CONDITIONS OF GUARANT
2.1 Coverage.
The participating FI, willing to provide on reasonable business
principles mortgage loans for the purpose of construction
or
acquisition of dwelling houses to low-income families, will be
issued by the LGF a guarantee covering 20% of the amount
of the
loan (which may include all legal costs and transfer duties
relating to the transfer and bond registration). In
return for
the payment of the fees in respect of the individual guarantees,
the LGF hereby guarantees and agrees to hold harmless
the FI
against such portion of the loss arising from the occurrence
of
any guaranteed event as may be covered by the guarantee.
2.2 Beneficiaries.
Under the terms of the Agreement signed by the
Government of
Namibia and the KfW , only families with a total income
below 3
times the Primary Household Subsistence Level and able to
save or
pay a 10% deposit on the purchase price of the house and
provide
for all costs regarding the transfer of the property
and bond
registration, may be granted loans guaranteed by the
LGF.
2.3 Period of the guarantee.
The guaranteed period in respect of any individual loan shall
be
five years from the date of the issue of the relevant gua
rantee
certificate and payment of the relevant fee's. A valuation shall
be made after the period of five years and if the valuation is at
least 20% more than the loan balance, the guarantee shall be
cancelled. The valuation shall, on request, be made available by
2-4 Fees.
During the first year of operation the FI shall pay no fees to
the LGF. After the expiry of the first year a fee shall be
negotiated between the FI and the LGF.
2.5 Transfer of rights.
The FI undertakes, if requested to transfer all rights of
recovery, on the net loss realised, which was claimed against the
LGF, to the LGF, as to enable the LGF to recover the net loss
from the individual.
2.6 Subsequent loans.
The FI may -
2.6.1 grant a second bond under an existing guaranteed
loan; provided that, in such event, the loan balance after
the grant of such, second bond may not exceed the maximum
allowed under the scheme at the time;
2.6.2 a re-valuation of the property shall be made before
the granting of the second bond;
2.6.3 not any time grant a loan, which includes the
purchase price plus all legal fees, under this scheme which
exceeds (R42 000,00 (FORTY TWO THOUSAND RAND) or such higher
amountas may from time to time be determined by the LGF.
3. GUARANTEED EVENT.
3.1 Occurrence.
A guaranteed event shall be deemed to have occurred, if in
respect of any guaranteed loan, a loss is suffered where a sale
in execution, whether at the instance of the FI or of any other
person; or a sale by way of a public. auction pursuant to the
insolvency of the borrower; was held in respect of the relevant
property where the property was purchased by the FI or by any
person other than the FI for an amount which is insufficient to
cover the full amount of -
3.1.1. the loan balance (as defined in clause 1.6) or,
3.1.2. the unpaid balance of the judgement debt (which
includes interest and legal costs),
in which event the total loss to the FI shall be deemed to be an
amount equal to the difference between such purchase price and
the loan balance , or an amount equal to the difference between
such purchase price and the unpaid balance of the judgement debt,
as the case may be.
4. PROCEDURES
4.1 For taking a guarantee from the LGF.
4.1.1 Application for coverage.
4.1.1.1 The FI shall apply to the LGF, on the prescribed
form as in annexure E, to include the loan under the scheme once
the application for such a loan has been approved by the FI. The
LGF shall inform the FI of the approval of participation once it
has ensured that the application complies to the conditions
contained herein. The approved annexure E shall thereafter be
returned to the FI.
4.1.1.2. Individual guarantees shall come into effect as
uh
from the date of registration of transfer and bond.
4.1.2 Monthly Report.
A guarantee advice recording all individual guarantees taken up
in respect of the guaranteed loans during a particular month
shall be completed by the FI at the end of every month and
delivered to the LGF within 7 days thereafter, provided that
4.1.2.1 an individual guarantee come into effect upon
registration of the relevant mortgage bond; and
4.1.2.2 in the event of the individual guarantee having
been so taken up in respect of a guaranteed loan which is a
"building loan" in terms of which amounts will be advanced to |
the relevant borrower as and when construction of the relevant
building on the property proceeds and is completed. However shall
preclude nothing herein contained shall preclude the FI from
itself completing such dwelling house before instituting a claim.
4.1.3 Payment of fees.
A.1.3.1 Once fees are established according to 2.4, they shall be
paid to the LGF by the FI, on date of registration of transfer
and bond in respect of the property which was included under the
TeepeNR re,encan
NENONIN gEIals ReTEasgph poe omy
STa tySatpal
guarantee fund. - |
4.1.3.2 Once paid, no fees referred to in 4.1.3.1 or any part
thereof shall be refunded to the FI, save for the purpose of
correcting errors of calculation or payment, notwithstanding that ©
any guaranteed loan to which any individual
guarantee relates may
during the rekevant period referred to in
2.3 be cancelled or
discharged.
4.1.3.3 No individual guarantee may be taken
up in respect of
qualifying as guaranteed loan a
fter a 60
period has lapsed as from date of
approval of the loan b
4.1.4 Variation of fee rate.
Any variation of the rate at which
fees are calculated shall be
mutually agreed upon between the FI
and the LGF.
4.2 Claims against the LGF.
4.2.1 Notices.
Within 14 days after -
4.2.1.1 the FI has obtained judgeme
nt against the borrower
in terms of any guaranteed loa
n pursuant to foreclosure
proceedings instituted by the FI; or
4.2.1.2 the FI has been given notice i
n accordance with any
applicable law that -
4.2.1.2.1 judgement has been obtained
against the borrower
in terms of any guaranteed loan by a
person other than the FI and
that the relevant property has been
attached at the instance of
such other person; or
A.2.1.2.2 the borrower in terms o
f any guaranteed loan has
been sequestrated:
the FI shall deliver a judgement/insolve
ncy advice in the form
of Annexure B; provided that such
advice shall be delivered at
least 7 days prior to the date of the
sale.
4.2.1.9 The FI shall deliver to the LGF a notice of Sale of
property in the form of Annexure Cc-
2
{ 4.2.1.2.1 in the case of a sale in execution being arranged
FI, at least
fourteen (14) days prior
at the instance
the date nh such sale is being arranged: or
4 4.2.1.2.2 in the case of any other sale contemplated in
3.2.1, no later than 7 (seven) days after the FI has, in terms of
any applicable law, been given notice of such a Sale, but in any
event at least 24 (TWENTY FOUR) hours prior to such sale.
4.2.2 Claims.
4.2.2.1 Within 14 days of having suffered a loss as
contemplated in 3.1, the FI shall deliver its claim to the LGF,
in the form of Annexure D, Wwhereafter the LGF shall effect
payment in terms of the claim or deny liability in respect
thereof within a period of 30 (THIRTY) DAYS after proper
Submission of a claim. Interest at the rate applicable on new
mortgage bonds for housing shall be claimable by the FI from the
LGF if the claim was not settled within 30 days after submission,
unless the LGF can prove reasonable justification for not
Settling the claim in time.
4.2.3 Reservation of rights for the LGF to bid at an auction.
At any time after a judgement/insolvency advice or a notice of
Sale of property has been delivered by the FI to the LGF, but
prior to the relevant sale in execution, the LGF or its nominee
may be appointed and authorized by the FI to bid at the sale in
execution or public auction referred to in 4.2.1.2 for ana on
ay
ll
behalf of the FI, to acquire the relevant pr
operty at such price
as may be determined by the Fi.
5.1 The liability of the LGF is conditiona
l upon the strict
observance of all the terms and conditions of
this agreement by
the Fl.
5.2 Subject to the terms and conditions
contained in this
agreement, the guaranteed loans shall be
granted and controlled
entirely by the FI and the terms and
conditions of each
guaranteed loan and its general arrangem
ents shallbe left in the
nands of the FI. Subject to the terms and
conditions contained in
this agreement, the LGFs liability to
the FI shall not be
extinguished or reduced should the
FI waive payment of any
instalment due in terms of any guaranteed
loan or in any other
way grant extension of time or any ot
her form of indulgence to
the relevant borrower; provided that
the FI shall ensure that a
normal houseowners policy covering peril
s such as. subsidence,
fire, flood and other physical damage i
n respect of the actual
replacement value of improvements to
the land in respect of a
property contemplated in 1.8 is taken
up and renewed from time to
time and generally that the guaranteed
loan is administered in
accordance with the normal practice o
f the FI.
5.3 If the LGF repudiates liability fo
r any Claim made or
contemplated under this agreement, t
he LGF shall be relieved of
12
liability in terms hereof unless legal action commences within
Six (6) months of such repudiation.
guaranteed loan or upon the
relevant guaranteed loan ceasing to meet the characteristics of a
guaranteed loan set out in the definition of "guaranteed loan" in
1.9 or after five years after the commencement of the guarantee
subject to the conditions of clause 2.3.
5.5 Either the LGF or the FI shall, with 30 (THIRTY) days
written notice to the- other, be entitled to cancel this
agreement; provided that with effect from the date of expiry of
Such notice -
5.5.1 all individual guarantees taken up priorto such date
Shall remain of full force and effect; and
5.5.2 no new individual guarantee may be taken up after
such date by the institution concerned.
5.6 In the event of any guaranteed loan and mortgage bond
securing such loan being ceded, _ whether by way of
"Securitization" or otherwise, by the FI to any other
participating FI -
5.6.1 the FIs rights and obligations in terms of the
individual guarantee relating to such loan may also be ceded and
delegated to such other person;
5.6.2 any cession and delegation referred to in 5.6.1
Shall be effective as from the date of -
5.6.2.1 the delivery by the FI
to the LGF of written
notice identifying the cessionary, th
e individual guarantees and
the guaranteed loans concerned;
and
5.6.2.2 yment of the stamp
cession by either the Fl or the
cessionary.
5.7 The LGF shall provide a
6 monthly statement of affairs
to each of the participating FI
of |
5.7.1 Income and Expenditure
5.7.2 Guarantees issued
5.7.3° Claims paid
5.7.4 Claims pending
5.7.5 Total commitment on gua
rantee versus total assets of
the fund.
5.8 The LGF shall consider and fin
alise any claim within 30
days of submission, according to
the rules contained herein.
5.9 All claims shall be submitted on the standa
rd claim
form "AnnexureD" with all nec
essary documentation as requir
ed.
No claim shall be considered wher
e all relevant documentation as
required is not available.
Thus done and signed at .----e-s cece
cree cece ees eoes on this ......
day of cw wwe ccc ecco ese ess ees
eesesecrcs LD. cccccces in the
presence of the undermentioned w
itnesses.
Ag
14
As Witnesses.
1. 6oe@¢é8# @@ 6 6 @ 668 GHB BE BUES|S
eee eee eee eee Fee eee eee esscee
&2° eo e¢e 6c eée@eeee@ G8 BOG 6&6 &6B8Ee*!
LeU. Fick
for: Loan Guarantee Fund
il, :ceseeeee eee e6eOee*eseeeeeesess on this ©6666 be
day
i
of cee eeesecesecocececececescccc cc cecc oc e cco l Desc scccee n the
presence of the undermentioned witnesses.
AS Witnesses.
1. &¢e@¢¢6see @ @ ee 6¢ ee 6bee6eoeES
eeeeeeese see eee eeceececec ees
2a
D.J. Russell
A.J. Bornman
for: SWA Building Society
*&
A
N
N
E
X
U
R
E
A
M
O
N
T
H
L
Y
R
E
P
O
R
T
o
n
a
C
e
NA
ME
OF
FI
NA
NC
IA
L
IN
ST
IT
UT
IO
N
__
__
__
__
_
o
e
AD
DR
ES
S
OF
FI
NA
NC
IA
L
IN
ST
IT
UT
IO
N
__
|
D
A
T
E
OF
SC
HE
DU
LE
:
__
_
SC
HE
DU
LE
FO
R
MO
NT
H:
_
s
e
r
a
e
p
t
n
s
E
R
a
e
o
p
r
e
e
|
Tr
o
w
n
a
h
i
p
|I
n
i
t
i
a
l
|p
u
r
c
n
a
s
e
|
D
e
p
o
s
i
t
|L
o
a
n
|
G
u
a
r
a
n
-
|A
m
o
u
n
t
|D
a
t
e
|
B
u
i
l
-
|D
at
e
o
f
|
|v
a
l
u
e
|
p
r
i
c
e
+
|
P
a
i
d
|A
m
o
u
n
t
|
t
e
e
[
F
e
e
s
|B
o
n
d
a
n
e
|G
u
a
r
a
n
t
e
e
|
l
o
f
|
L
e
g
a
l
|
|
|A
m
o
u
n
t
|
P
a
i
d
|R
e
g
i
-
[
L
o
a
n
|
J
p
r
o
p
e
r
t
y
|
G
o
s
t
®
|
s
t
e
r
e
d
|
Y
e
s
/
N
o
|
|
-
-
-
|
|
|
|
|
|
|
| | | | | | | | | | |
| | | |
r
i
|
T
o[
a
|
L
e
n
d
e
r
s
|
S
u
r
n
a
m
e
l
I
n
i
-
|
E
r
f
[L
oa
n
=
|
o
f
|
[N
|A
cc
ou
nt
|
B
o
r
r
o
w
e
r
|N
u
m
b
e
r
ee aten ationadTomer cagarene
(
|
|
\\
_
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| | | | | | | | | | | |
| | | | | | | |
| \\- |
|
|
/
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
p
o
|
|
|
|
|
|
|
|
|
|
|
|
| r
T
|
|
|
|
|
|
P
O
o
e
{
C
o
m
p
l
e
t
e
o
n
l
y
i
n
r
e
s
p
e
c
t
o
f
g
u
a
r
a
n
t
e
e
s
r
e
q
u
e
s
t
e
d
a
n
d
a
p
p
r
o
v
e
d
f
o
r
t
h
a
t
m
o
n
t
h
)
15
JUDGEMENT /INSO
LVENCY ADVICE
NAME OF LEND
ER
e
o
eww
a cc c
cssc
csce
sere
re ee
e ee e
e ee
ADDRESS OF L
ENDER
e
®
e
@
@
@ o ® ©
0 o
S & @r
e
eee¢e2
e 0 6 @
@
DATE OF THIS
NOTICE
e
o
www
csefe
sessf
Locce
er®
NAME OF BORR
OWER
a
@
we
e ee
wew e
ee ee
eee c
esse
s eee
eee
LENDERS ACC
OUNT NUMBER
Sf ee eee
n
GUARANTEE CE
RTIFICATE DA
TE @
@ ® @ 9
© o @
@ 6 9 @ &
{19-
2228
CURRENT LOAN
BALANCE
a
eee2e
6 & & ®&
®
If Judgement
~
1. NAME O
F JUDGEMENT
CREDITOR =
ee
ne
-2De
DATE O
F JUDG
EMENT
° cw
wecefe
csesfh
ececcr
s
(Attach COpy
of notice/
judgement )
If Insolvenc
y ~
1. D
ate
e
Ze N
ame
of m
rust
eess
ecec
cc
e
r
n
s
e
e
|
prepar
ed by:
cee ew
eecrnr
creer
eee eee
pate:
cec
e ech
Gener?
Authorized b
y:
pate: e
e
9
i
iL. DATE
17
NOTICE OF SALE OF PROPERTY.
NAME OF LENDER a a a a a @¢¢eeée6¢¢@¢ @ @ @ @ @ 6@@ &@ GC e&@ S|
ADDRESS OF LENDER coco oe eco eee ote te eee te ees
@ @¢@¢e6go ¢ @6¢ 660804 688846468 4¢64¢48646648084¢ GC 6&6 & Ee 64S
© @¢6¢ @¬¢¬@ 6666666
CONTACT PERSON AND TEL NO. Sec eececccvcvesee Tel ..
DATE OF THIS NOTICE bee ececece/ecec/19sec
NAME OF BORROWER a
LENDERS ACCOUNT NUMBER . See mem mmc wre e eee nese ereees
GUARANTEE CERTIFICATE Date Sec coc ces sesfesseflLOscces
JUDGEMENT/INSOLVENCY ADVICE DATH Fecccecccsccsfocere/l9Q.
CURRENT LOAN BALANCE sRe ecco c cc es cease ees cose.
(Complete only if different from particulars in Annexure "B'")
If Judgement -
1. NAME OF JUDGEMENT CREDITOR Se Cem eo ecm creer ese rece seves
2 DATE OF JUDGEMENT Se ccc occ ccsfosee/lGeeeane
(attach copy of notice/judgement)
® @ 6 @ ¬
If Insolvency -
cose scccef/ooce eslLIeevece
Ze NAME OF TRUSTEE/LIQUIDATO
3 ADDRESS @ 6©®6 @ @66@hmUMGHMUMGMUC VWhCUCMWUhUC MOmhUCMMmhCUC OrmhC PmhCUCMh STC ]TCUCUMhUM SWMUC«UC ]MUMCM MhUC MHhU M]hCF
©
o
8
0
O
O
e
o
@® ¢@ee¢@6¢chmUchUCUC |"hCUC MPTmhCUMWM hOUCMCWUh]hCM MmhCM CM hCM [TH SC |]F| FF |e SF SF SB
TYPE OF SALE sIn execution at instance of FI*
In execution at instance
third party*
Public auction after insolvency*
DATE OF SALE Seco c cc vrccfoccse/lLIececces
PLACE OF SALE | .- ce eee eer eer essere rereserececsecsescccs
TIME OF SALE te oo olle wes
(Note: Conditions of Sale to be
attached)
* Delete that which is not applicable.
Prepared by: cece ccc ccs es se cccccvess Dates coerce ccveeelLDn veee
Authorized by: coo eee ee ee ese eee eo eee eo 8 ee Date: ce ccc ccc ccc oe LO e cee
18
ANNEXURE
CLAIM FORM
section 1: General Information
1.1
1.9
Name of Lender ce ee ce eee ees
Address of Lender aae
© 6 @@6@ 66686466
@
¢ @ 6 6
© @ @ @
& @ @ @
- borrower © @@6@e6¢ @@ 6 @ 6@ e@eeeese
¢ @@6 6
@ @ @ @ &
@ @ @ @ &¬
@ @ @ 6 6
2s
@
cee eee eeeoeee se
ee¢ecesce ee ose esesees
If building loan, has buildingbeen completed? YES/NO
Date of sale in execution/public auctiona
coc cc ofocccelIsce,
Guarantee Certificate Date: Coes ccc c/eoe
Date of Judgement/Insolvency advice ("Btwee/ees/19.0.
Date of Notice of Sale of Property
20 e/eee/l9.n.
Amount of any collateral security:
Reccccsccccccccccece
Section 2: Initial value of Property
AS set out in 7 of Annexure "RE"
201
( Won
Reoe
Section 3: Maximun cover: Guarantee Amount PR...(where applicable)
AS set out in Bl of Annexure "R"
3.1
Rees
e
oc¢/1O. cece
) a6
®e@¢e¢@@ 8 @ @ ¬ Be
©&¢@@¢e¢e6606
©e@¢ee¢eec¢é¢esee.e
Ioan Balance/Judgement debt at time of Sale R.........
Amount Recovered at sale
Total loss (4.1 less 4.2):
Total cover
TOTAL CLAIM (Lesser of 4.3 and
oeoeoeeee eee ee eee eee ees e see
Prepared by
oeeoeeee eee ee eo eee eee eee es
Date
Reece
Reese
RR...
4.4)R...
e @ ¢ @ @ 6 @
@ @@ @ @ 6
6 ¢@¢ @¬@ ¢@ @ @
eoeceeee eer ere ee eee eee wee eee
Authorized by
oeeceeeeee ee ee eee eevee ee
Date
eo ee
Annexure FE
6¢ @¢é¢@¢.6
LSSUED TO: @eeeée#88¢e6¢66866 6(ee ee eee eee eee oe eee es
7 (Name of FTI)
1. BOrTrowWersS SUINAMEG s.cccccccccccccecscceccecccee
Borrowers first names 3 6 @eee¢6¢66¢6866¢64¢ 6466486684686 66648666 8
@ @ @ @ @ & @ ¬@ 6
oe ee eceeeeeeeceoe ee ee OOOH Hh OE OC Pee OB OS
3. Identity Number Sr
4. Erf number Soc c ccc cc ccc ces
5. Township Soe
6. Monthly Income:
6.1 Borrower
6.2 Spouse
6.3 Housing Allowances
Total Income
® @ @ @ ® ® @ ® @ ® ® ® © @ ® @
g @ @ e e ® ® @ © @ ® 9 ® e @
@ @ @ @ @ ® @ @ ® ® @ @ @ @ @ 6 @
7. Property Valuation @ & 9 g ® @ 9 g @ @ ® 8 ® @ eo ®
8. Purchase Price
9. Legal Costs
10. Deposit Paid
11. Loan Required
© ® 9 @ @ © ® @ ® e ® @ @ ) ® e @
6 ° e e ° @ @ ® ° @ ® @ e& ® o e
@ ® e ® ® @ © @ ® 2 @ S e © @ e (8+9-10)
12. Guarantee Required
(20% of 11.)
© & e ® e © ® © o ® ® © © ® @ &
O
D
A
W
W
W
WD
D
A
W
13. Date of approval of loan: ...../ee20-/l9...0%
14. Fee Resecccceccccecsceas
(Payment on registration)
Prepared by: bebe ceuecucucuceueucen Date: ee Jeeee/19 een,
Approved DYt ..ccccescccccccscscoses Date ...feeee/l9....
Completed by Loan Guarantee Fund
1. Participation Approved YES -
NO
2 Amount Guaranteed Receccocecsccecvccsececece
® © @¢¬ @¢¢0¢¢680¢@e¢6¢ 6 © @ @ @CUchWmUCUMHWhCUChMlhUMTS o @® ¢ @ @ 6¬ @ &e eee Se 6 oO eo e@ @@ @UOGmUOGMmUCUMOUCOmUC TC MmhCUCcMFmhUCUM]WChUhHhUhMHMhUhKHFHCUhUchChUMrhCUChKWUChUhW ]L[hUhOhUCOFhUhF
APPROVED BY DATE
(Original returned to FI, LGF retain copy).